Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Below Rate | |
| 2 | L2₹20.0 L+₹18,273.16 (0.92%)Rejected-AOC | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | N K T AND CO L2 | S PALANISAMY AND CO L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work :Strengthening the Road from T.Venkitapuram - Gudalur BT Road to Karuppagoundanpudhur (R-31) Km 0/700-1/340 H/o.Chinnadharapuram Panchaya | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 811.8 | Sqm | 6 ₹4,870.8 Lowest | 6 ₹4,870.8 Lowest |
| 3.00 | Picking 5cm to 10cm old metalled surface and sectioning - 1 sq.m including all charges etc., complete | 800 | Sqm | 22 ₹17,600 Lowest | 22 ₹17,600 Lowest |
| 4.00 | Earth work Excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sidedrain etc., | 405.9 | Cum | 133 ₹53,984.7 | 131 ₹53,172.9 Lowest |
| 5.00Providing and Laying Gravel Soiling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | KM 0/700-1/340 | 169.12 | Cum | 304 ₹51,412.48 | 301 ₹50,905.12 Lowest |
| 7.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 8.00 | KM 0/700-1/340 | 300 | Cum | 1,978 ₹5,93,400 | 1,957 ₹5,87,100 Lowest |
| 9.00Providing and laying of Prime Coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM Surface preparatory to another bituminous construction over it. | |||||
| 10.00 | KM 0/700-1/340 | 2,400 | Sqm | 81 ₹1,94,400 Lowest | 81 ₹1,94,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
29 Nov 2024, 3:00 pmClosed
Block Development Officer(B.P)
Block Development Office, K.Paramathi
Strengthening the Road from T.Venkitapuram - Gudalur BT Road to Karuppagoundanpudhur (R-31) Km 0/700-1/340 H/o.Chinnadharapuram Panchayat
2024_RDTN_504163_2
K.Paramathi Block - Panchayat Union General Fund - 2024-25
Open Tender
Civil Works - Roads
Item Rate
90 days
K.Paramathi Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
6 Aug 2025
23 Nov 2024
29 Nov 2024
23 Nov 2024
29 Nov 2024
23 Nov 2024
Amount
Name of the Work :Strengthening the Road from T.Venkitapuram - Gudalur BT Road to Karuppagoundanpudhur (R-31) Km 0/700-1/340 H/o.Chinnadharapuram Panchaya
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5cm to 10cm old metalled surface and sectioning - 1 sq.m including all charges etc., complete
Earth work Excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sidedrain etc.,
Providing and Laying Gravel Soiling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime Coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM Surface preparatory to another bituminous construction over it.
Providing and laying of Tank coat over the BT surface using Emulsion at the rate of 2.5Kg per ten square metal over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Bituminious concrete to 25mm thiock using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG 30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density.
Road Marking with hot applied thermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Cost of HM Stone
Cost of KM Stone
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N K T AND CO (BID ID -1197283)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .