Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹21.1 L (7.61%)Admitted-Finance BARZ PATRA KHORCHA | ₹3.0 Cr+₹21.1 L (7.61%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON FURNISH OF DOCUMENT |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON FURNISH OF DOCUMENT |
| 5 | Rejected-Technical PLOT NO 422 849 P S NACHUNI BLOCK BANAPUR KHORDHA ODISHA 752034 | BANAPUR | KHORDHA | ODISHA | 752034 | - | - | Rejected-Technical NON FURNISH OF DOCUMENT |
| Sl No | Description | Qty | Unit | Rabindra Sahu L2 | Tapan Kumar Sahoo L1 |
|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers , stand posts,pump house,providing 100% functional house tape connections, 225 KL capacity ESR ,Compound wall, pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Adapada & Penduralundi under Sanakhemundi Block. | |||||
| 1.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Chlorination arrangement etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 1,03,65,007 ₹1,03,65,007 | 96,31,895 ₹96,31,895 Lowest |
| 1.02 | ELEVATED STORAGE RESERVOIR (225 KL capacity R C C elevated storage reservoir 15 m Staging )
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 225 KL capacity with necessary staging height of 15 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc,GI Pipe ladder from Ground floor to top of top dome with 50 mm G.I pipe as vertical & 32 mm G.I pipe as horizontal posts of ladder,Balcony ralling with 32 mm G.I Pipe,Ralling at top of Topp dome complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /PMEC,Berhampur at his own cost). | 1 | Nos | 45,54,897 ₹45,54,897 | 42,32,731 ₹42,32,731 Lowest |
| 1.03 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned. | 1 | Nos | 7,45,995 ₹7,45,995 | 6,93,231 ₹6,93,231 Lowest |
| 2.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,stand post,pump house,providing 100% functional house tape connections, 100 KL capacity RCC ESR,100 KL capacity RCC UGR, Compound wall, pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws top Ramachandrapur under Sanakhemundi Block. | |||||
| 2.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Chlorination arrangement etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 1,03,59,880 ₹1,03,59,880 | 96,27,131 ₹96,27,131 Lowest |
| 2.02 | Construction of 100.000 LTR OHR WITH 12M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 100,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 24,38,106 ₹24,38,106 | 22,65,660 ₹22,65,660 Lowest |
| 2.03 | Construction of 1,00,000Ltr Capacity RCC UGR Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 100 ,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 6,40,250 ₹6,40,250 | 5,94,966 ₹5,94,966 Lowest |
| 2.04 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned | 1 | Nos | 6,71,911 ₹6,71,911 | 6,24,387 ₹6,24,387 Lowest |
Tender Value
₹3.0 Cr
Closing Date
16 Apr 2022, 5:00 pmClosed
Superintending Engineer, RWSS Division, Bam
Near Jarada Bunglow, Berhampur
PWS to (1) Adapada Penduralundi (2) Ramachandrapur under Sanakhemundi Block
2022_RWSS_76469_2
EERWSSBAM- 39 (A) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
360 days
PWS to (1) Adapada Penduralundi OTH
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
18 Jun 2022
25 Mar 2022
18 Apr 2022
25 Mar 2022
16 Apr 2022
25 Mar 2022
25 Mar 2022 - 14 Apr 2022
Amount
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers , stand posts,pump house,providing 100% functional house tape connections, 225 KL capacity ESR ,Compound wall, pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Adapada & Penduralundi under Sanakhemundi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Chlorination arrangement etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
ELEVATED STORAGE RESERVOIR (225 KL capacity R C C elevated storage reservoir 15 m Staging ) Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 225 KL capacity with necessary staging height of 15 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc,GI Pipe ladder from Ground floor to top of top dome with 50 mm G.I pipe as vertical & 32 mm G.I pipe as horizontal posts of ladder,Balcony ralling with 32 mm G.I Pipe,Ralling at top of Topp dome complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /PMEC,Berhampur at his own cost).
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,stand post,pump house,providing 100% functional house tape connections, 100 KL capacity RCC ESR,100 KL capacity RCC UGR, Compound wall, pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws top Ramachandrapur under Sanakhemundi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Chlorination arrangement etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 100.000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 100,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Construction of 1,00,000Ltr Capacity RCC UGR Supplying of all labour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of 100 ,000 ltrs capacity Cylindrical Container with circular dome, full raft using CC M-25 , with PCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from PW to UGR & UGR to rising main including in-let,out-let,over flow & washing line of UGR, and use of aluminium ladder inside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned
Rabindra Sahu
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_394595.xls
BOQ • 0.28 MB
A02DTCNAdapada.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .