Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
24 May 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Manager (Contracts)
Contracts Department, Admin Block A, Bongaigaon Refinery, Dhaligaon. Dist. - Chirang, Assam-783385
EXPERT SERVICE FOR CONTROL AND INSTRUMENTATION DURING GT CIBI 2025
2025_BGR_185124_1
BNS25IT075
Single
Instrumentation Services
Works
240 days
Bongaigaon Refinery, Dhaligaon
Please refer Tender documents.
4 documents required · 4 mandatory
Exempted
26 May 2025
20 May 2025
26 May 2025
20 May 2025
24 May 2025
20 May 2025
20 May 2025 - 22 May 2025
Amount
Control and instrument job -GT
CONTRACT ASSISTANCE MISCELLANEOUS DEMOB/MOB CI Demobilization and mobilization charges of all persons deployed for the GT inspection jobs (CI &BI), under specific conditions as per the scope of work and terms and conditions. For Mob. & demob. charges IOCL will pay actual expenses based on documentary evidence + 15% Administritve Charges. No Idling charges will be applicable upto 3 days. Charges are per trip basis
Control & Instrumentation Jobs during CI for FR-V Instrument Removal and fixing back: Following Instruments are to be removed for giving clearance to Mechanical dept. for dismantling the equipment. The removed instruments are to be checked and to be replaced if found faulty during testing. ,, ,,,,SPARK PLUG: QTY-2 ,,,,FLAME SCANNER: QTY-4 ,,,,BLEED VALVE LIMIT SWITCHES CONNECTIONS: QTY-4 ,,,,Turbine roof related Transmitter & limit switches, Tubing ,,,, & cabling related to same ,,,,Turbine compartment door limit switches & related conduit ,,,,HAZGAS & CO monitor probes & related conduit & tubing Preventive Maintenance Jobs: 1.,,Stroke checking & calibration of following instruments. ,,,,Inlet guide vane (IGV). ,,,,Stop Ratio Valve ,,,,Gas Control Valve 2.,,IGV LVDT physical inspection & feedback loop checking. 3.,,All Junction boxes inspection including cable termination tightening 4.,,All Tubing ferrule joints and cable conduit connections tightness checking. 5.,,All Level switch & limit switch functional checking. 6.,,Spark plugs# functional testing with Mark-VIe. 7.,,Flame scanners# functional testing with Mark-VIe. 8.,,Notification jobs as mentioned in shutdown job planning. 9.,,Mark-VIe control panel card cleaning and connection tightness. 10.,,Speed probe healthiness checking - 11.,,Exhaust TC healthiness check and replace if found faulty 12.,,functional testing & repair/replacement for following on-off valves. ,,,,Compressor bleed valve actuators ,,,,20CB Solenoid valve ,,,,On-Off valves and Solenoids (including CO2 system) ,,,,,,,, functional check & replace. ,,,,False start drain valves 13.,,Seismic vibration probes (09 Nos.) healthiness checking and replacement of probe/probe extension cable. Note: 1. BGGTS Control TA will only witness the healthiness checking of valves. 2. No skid cable laying is possible during the shutdown maintenance activity. If required, same can be executed separately. 3. Haz gas sensor - Calibration gas should be provided by IOCL.
stage.html
html • 0.02 MB
finance_195380.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .