Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr Quoted ₹3.8 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L1₹4.1 CrRejected-AOC | ₹4.1 Cr | L1 | Rejected-AOC L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| 4 | Rejected-Technical B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | - | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Apr 2018, 5:00 pmClosed
Chief Engineer (World Bank Project), Odisha
Conference Hall, O/o E.I.C. (Civil), Odisha, Bhubaneswar
Authoritys Engineer for Construction of H.L. Bridge over river Mahanadi at Gopinathpur connecting to Singhanath Pitha and Baideswar in the District of Cuttack in the State of Odisha under NABARD Assistance RIDF-XXIII
2018_EICCL_45414_1
RFP Identification No. CE-WBP(O)-16/2017-18
Open Tender
Miscellaneous Services
EOI
2555 days
In the District of Cuttack
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹50,000
O/o E.I.C. (Civil), Odisha, Bhubaneswar
27 Apr 2022
20 Mar 2018
26 Apr 2018
20 Mar 2018
18 Apr 2018
27 Mar 2018
20 Mar 2018 - 18 Apr 2018
27 Mar 2018
Amount
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A.Key Personnel
Team leader cum Senior Bridge Construction Engineer 36 Man-month in Construction period 4 Man-month in Maintenance period
Sr. Bridge Design Engineer 6 Man-month in Construction period 0Man-month in Maintenance period
Resident Bridge Engineer 36 Man-month in Construction period 4 Man-month in Maintenance period
Senior Quality -cum- Material Engineer 9 Man-month in Construction period 0 Man-month in Maintenance period
Senior Geotechnical Engineer 9 Man-month in Construction period 0 Man-month in Maintenance period
Sr. Contract Specialist 5 Man-month in Construction period 1 Man-month in Maintenance period
B.Sub- Professional staff
Assistant Resident Engineer (Bridge) 36 Man-month in Construction period 12 Man-month in Maintenance period
Assistant Resident Engineer (Quality) 36 Man-month in Construction period 0 Man-month in Maintenance period
Quantity Surveyor 36 Man-month in Construction period 4 Man-month in Maintenance period
Survey Engineer 12 Man-month in Construction period 0 Man-month in Maintenance period
CADD Engineer 36 Man-month in Construction period 0 Man-month in Maintenance period
Lab Technician -1 36 Man-month in Construction period 0 Man-month in Maintenance period
Lab Technician -2 36 Man-month in Construction period 0 Man-month in Maintenance period
Asst. Highway Engineer 8 Man-month in Construction period 0 Man-month in Maintenance period
II. Support Staff
Office Manager-cum-Accountant
Computer Operator
Guard No. 1
Office Boy
III. Transportation (Fixed rate on rental basis)
The vehicles provided by the Consultants shall include the cost for rental, drivers operation, maintenance, repairs, insurance, etc. for all complete
Innova /Scorpio or equivalent (not more than 2 years old) During Construction period (1x36) During Maintenance period (0)
Bolero A/C or equivalent (not more than 2 years old) During Construction period (2 x 36) During Maintenance period (12)
IV. Office Rent (Fixed Costs)– Minimum 200 sqm carpet area of office shall be rented
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete
Main Office (1 No) During Construction period (36 month)
Main Office (1 No) During Maintenance period (12 month)
V. Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies - During Construction
Office Supplies - During Maintenance
Drafting Supplies - During Construction
Drafting Supplies - During Maintenance
Computer Running Cost - During Construction
Computer Running Cost - During Maintennace
Communications - During Construction
Communications - During Maintenance
VI.Office Furniture and Equipment (Reimbursable
Executive Table
Executive Chairs
Tables
Ordinary Chairs
Steel Shelving Cabinet
Multifunction Network Printer (A3) with Facsmile
Computer PC
Ink Jet Printers
VII. Reports and Document Printing
Monthly Reports (Design and Construction) (6 Copies for 36 Months)
Quarterly Reports (5 Copies for 12 Quarters)
Quarterly Reports during Maintenance (6 Copies each quantity for 16 Quarters)
VIII. Survey Equipment with Survey Party and Vehicle etc complete
Rental Cost towards survey equipment (GPS/ Total station/ Auto level) with semi skilled survey party (4 persons) and one dedicated vehicle for survey party (inclusive of vehicle rental driver 's salary, fuel operation and maintenance etc complete) with rods,flags and other sundries for a period of 3 days in a month
IX. Lump item
Study examination and ratification of survey data, hydrology and bridge hydraulics, with re-computation
SPECTRUM Techno Consultants Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .