Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹40,000
Closing Date
6 Aug 2026, 4:00 pm
Xen RNB Sopore
RNB Sopore
Development of Playfield by way of fencing, levelling and filling at Bomai
2026_PWDJK_317183_1
NIT No- 55 of RnB-Sopore of 2026-2027
Open Tender
Civil Works
Percentage
60 days
Sopore
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Xen RNB Sopore
₹40,000
21 Jul 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
21 Jul 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil . | - | Cum | - | - |
| 2 | Earth work in excavation in all kinds of soil by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer incld.cutting of trees, removal of tree stumps and dewatering of trenches during execution of work. | 1 | Cum | - | - |
| 3 | Random Rubble masonry with hard stone in foundation and plinth using Quarry Stone including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages. | - | Cum | - | - |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth using quarry stone with bond stone including all carriages. | - | Cum | - | - |
| 5 | Providing and laying damp-proof course 50mm thick withcement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) including all carriages. | 1 | Sqm | - | - |
| 6 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) :Flush/Ruled Pointing, including all carriages | 1 | Sqm | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2 coarse sand: 4 grade stone aggregate 20mm nominal size) including all carriages. | - | Cum | - | - |
| 8 | Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . For mass concrete including all carriages. | - | sqm | - | - |
| 9 | Supplying and filling of good earth including digging earth carrying by lorry, placing, watering, dressing and ramming in layers not over 200mm thick and consolidation with PRR of 8-10 ton capacity including carriage of earth from approved source of supply to site of work complete including Royalty and all carriages. | - | Cum | - | - |
| 10 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete, including all carriages. | - | kg | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1038279.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].