| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | ₹7.4 L | L1 | Accepted-Finance Accepted-lowest |
| 2 | L2₹7.8 LRejected-Finance | ₹7.8 L | L2 | Rejected-Finance Regretted-rate is high |
| 3 | L3₹8.4 LRejected-Finance | ₹8.4 L | L3 | Rejected-Finance Regretted-rate is high |
| 4 | L5₹8.4 LRejected-Finance | ₹8.4 L | L5 | Rejected-Finance Regretted-rate is high |
| 5 | L5₹8.4 LRejected-Finance | ₹8.4 L | L5 | Rejected-Finance Regretted-rate is high |
Tender Value
₹8.4 L
EMD Value
₹16,750
Closing Date
25 May 2026, 2:00 pmClosed
EE,BNWD
Room No.124 1ST FLOOR PURTA BHAVAN D.F. BLOCK SECTOR I SALT LAKE KOLKATA 700 091.
Installation of New Lifts replacing the old lifts in Mayukh Bhavan, Salt Lake, Kolkata-700091 (Civil Works).
2026_WBPWD_5014032_4
WBPWD/EE/BNWD/NIT01e/2026-27
Open Tender
CIVIL WORKS
Salt Lake
Please refer Tender documents.
4 documents required · 4 mandatory
₹16,750
Yes
15 Jun 2026
13 May 2026
28 May 2026
13 May 2026
25 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supplying and application of chemical for post Installed rebar connection by using ETA approved for seismic criteria In rebar connection, Including drilling hole to the required depth by rotary hammer drill, cleanlng with brush & jet of clean air, fillng chemical usIng serrated noule to eliminate mIxIng error and in a voldless manner IncludIng charges for all tools & plants. Application to be designed for post• Installed rebars as per ECZ/TR023 or relevant tested and accepted design guidelines and the design document to be furnished by the manufacturer. The chemical should have ETA apprOVal for seIsmIc criteria of rebar fixing whIch should be furnished by manufacturer. The installation and the setting instructions should be strIctly followed as per manufacturer's specifications as approved by EICprior to drlll/ng along with post· Installed rebar embedment design report. The existing concrete member should be scanned using rebar scanner to avoid hitting existing reinforcement in concrete.
Cost of post installed rebaring application with chemical as speclfled for 12 mm dia per cm of depth | 640 | Cm. | 21 | ₹13,440 | - |
| 2 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
(i) Pakur Variety. - 5th floor | 3.08 | Cu.M | 6,277.42 | ₹19,334.45 | - |
| 3 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(i) Tor steel/Mild steel (a) For works in foundation, basement and upto roof of ground floor /upto 4m.
JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel.
5th floor | - | MT. | 57,002.54 | - | - |
| 4 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
9 to 12 mm. thick approved quality ply board shuttering in any concrete work.
5th floor | 24.12 | Sq.M | 463 | ₹11,167.56 | - |
| 5 | M.S structural work in colums, beams etc. with simple roled structural members (e.g. joints angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineering -in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc weldingconforming to IS: 816 - 1956 & IS :1995 using electrodes of approved make and brand conforming to IS: 814 - 1957, haulage, hoisting and erections all complete. the rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidential charges such as electricity charges, labour incurance charges etc.(Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for Gusset, bracket, cleat, rivets, bolts and nuts may be make by adding .
(III) For built up sections / structural members of specified sections weighing not less than 22.5 kg./m.
5th floor | 2.4 | MT. | 79,781.96 | ₹1,91,476.7 | - |
| 6 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 80.1 | Sq.M | 19 | ₹1,521.9 | - |
| 7 | (a) Applying 2 coats of bonding agent with synthetic multi functional rubberemulsion having adhesive and water proofing properties by mixing with waterin proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer'sspecification [Cement to be supplied by the Department] | 80.1 | Sq.M | 88 | ₹7,048.8 | - |
| 8 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting asper Technical specifications necessary of nipples after completion of grouting with Cement/Epoxy | 144 | Each | 102 | ₹14,688 | - |
| 9 | Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. | 144 | Kg. | 882 | ₹1,27,008 | - |
| 10 | Supplying. preparing and placement of ready mix non shrink cementious microconcrete having no metalic aggregate or chlorides for repairing and jackting of damaged R.C.C. members. The micro concrete should achieve a compressive strength not less than 10 MPaafter 24 hours. 40 Mpa after 7 days 3 and 50 Mpa aftre 28 days at 300C.It should have unrestrained expansion in between 1 to 4%. flexural strength shall not be less than 5MPaafter 28 days. Micro concrete should have a co-efficient of thermal expansion similar to that of the host concrete | 0.34 | Cu.M | 50,546 | ₹17,185.64 | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_5081957.xls
BOQ • 0.25 MB
Form_2911.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid