| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC | 1 | Accepted-AOC Admitted | |
| 2 | 2₹5.6 L−₹22,581.84 (3.89%)Rejected-AOC | 2 | Rejected-AOC Admitted | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
22 Feb 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer Sharda Sagar Division, Pilibhit
Reconstruction of V.R.B. at km 6.485 of Bauni Mr. for year 2020-21
2021_UPIDC_550417_20
05/E.E/2020-21
Open Tender
Civil Works - Bridges
Item Rate
75 days
Pilibhit
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹14,000
10 Jun 2021
16 Feb 2021
22 Feb 2021
16 Feb 2021
22 Feb 2021
16 Feb 2021
90 days
Amount
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge
Earth work in embankment by power tranported earth with a leadUpto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders Diversion of Road.
Supply and fixing of RCC Np3 Pipe 900mm Dia with including all material Labour T&P Complete. For diversion road
Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc.
Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete.
Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement.
Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Centering & Shuttering For slab and Bed Block including all cost of material labour T&P etc. for complete work.
Shuttering for C.C. Blocks and concrete including cost of Shuttrering, labour and T&P etc. complete.
Supplying, laying and consolidation 150 mm thick loose to 100mm of stone ballast size 20 mm to 40 mm by road roller including cost of all material, labour and T&P etc.required for proper completion of work.
Providing and fixing in position pre-moulded joint filler in expansion
Finishing of walls with water proofing cement paint of aprooved make such as super snocem, durrocem,Robiacem,guttucem,supreem quality of required shade on uncoated wall surface (For Two coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials.
Reinforcement in slab, laying,cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work.
A U CONSTRUCTIONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_845663.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .