Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.8 L
EMD Value
₹18,761
Closing Date
3 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Public Health Works division Gandhinagar, GWSSB
Providing Supplying and Laying of gravity main pipe line From Pethapur Chokadi to Existing Line of Villages under M&R of SSW G-1 regional w.s. scheme. Ta&Dist.: Gandhinagar
367308
15/ 2026-2027
Open
Civil - All
Works
Gandhinagar
1 document required · 1 mandatory
₹900
Executive Engineer, Public Health Works Division, Gandhinagar
₹18,761
19 Nov 2026
19 Nov 2026
19 Nov 2026
3 Dec 2026
19 Nov 2026
180 days
Estimated Cost:- Rs.
Gujarat Water Supply & Sewerage Board
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
SUMMARY OF - Grand Summary of Schedules (Covering
Schedule – A Nil
Schedule – B Providing Supplying and Laying of
gravity main pipe line From
Pethapur Chokadi to Existing PVC
Line of Villages under M&R of
SSWG-1 regional w.s. scheme.
Ta&Dist.: Gandhinagar
Schedule of Payment for
Name of work: Providing Supplying and Laying of gravity main pipe line From Pethapur Chokadi to Existing
PVC Line of Villages under M&R of SSW G-1 regional w.s. scheme. Ta&Dist.: Gandhinagar
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in more
details in various sections of this bid document.
1. The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B rates and prices received in any other formats will be rejected and the
Bids will be disqualified.
2. It will be entirely at the discretion of the Employer to accept or reject the bidder’s proposal,
without giving any reasons whatsoever and the bidder shall not be permitted to withdraw
his bid on this account.
supplied from the by client.
B only will be considered for price evaluation & shall form a part of the Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
6. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
satisfactory working/safety of the system as specified, will not be separately paid for by the
Employer when executed and shall be deemed to be already covered by other items and
rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
Schedule B and Schedule-C of the successful bidder shall be corrected accordingly. Only
financial evaluation of the bid.
9. Schedule ‘C’ gives the basis of interim payment for construction of civil works.
10. The bidder shall be deemed to have allowed in his price for provision, maintenance and final
removal of all temporary works of whatsoever nature required for construction including
temporary bunds, diverting water, pumping, de-watering etc. for the proper execution of
works. The rates shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved.
11. Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
13. The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
14. The prices quoted shall also include the cost of materials utilized for testing.
15. The bidder should acquaint himself with the site conditions including the access to Work site.
The successful bidder shall have to make suitable access to work sites at his own cost.
These accesses will be used by the other contractors working for GWSSB.
shall include all the equipments / materials / accessories and services required as per the
17. 1% of the value of work will be deducted from the Running bill against labour cess which is
non refundable.
18. The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at the time of
submission of the bids. Statutory variation if any during the currency of contract shall have to
borne by the agency which shall be not reimbursed by the GWSSB.
19. The rates should be quoted inclusive of Sale Tax/ GST and all other taxes except service tax
as per Volume-II(A), General Conditions of Contract, Clause No.
20. The process requires that the bidder shall quote his price for the work components contained
entire period of performance of the contract except price variation allowed for supply of
MS/DI/PVC/HDPE pipe as per Volume-II(A), General Conditions of Contract.
21. Payment shall be made for the components for which lump sump prices are quoted, as per
the schedule of payment. Total cost will be worked out on the basis of work done of individual
items and rates quoted against those particular items only.
22. Royalties: The contractor shall be liable to pay the royalty of the quarried materials/ minerals
used in the construction of works at the rates specified in the Narmada Water Resources,
Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-1)
Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the running bills
of the work from time to time and remaining amount if any shall be recovered from the final
bill before releasing the security deposit of the work.The contractor shall furnish the statement
showing the quantity of quarried materials / minerals from whom purchased ( with full address
of the seller) and copies of the bills for purchase to the Executive Engineer of the in charge of
the work. The contractor shall also furnished such additional information as regards royalty
payment to the competent authority.
23. Agency shall have to take Insurance policy and intimate to GWSSB along with the evidence
within time limit. In case of non compliance entire responsibility shall be rest with the agency
and required amount shall be recovered from any due amount of the agency.
24. GWSSB can recover penalty amount from the agency for not taking the insurance. Though
the penalty amount is recovered, responsibility of the agency for taking insurance shall be
continued and will not be escaped from the responsibility.
25. The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open for
the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment details and
such other documents as may be required for the purpose.
The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of claim amount to be recovered or reimbursed shall be
of the competent authority of the GWSSB and shall be binding on the contractor.
26. Rates inclusive of GST and all other taxes (Central, state and local).
b) The rates quoted by the Contractor shall be deemed to be
inclusive of GST prevailing as on 30 days prior to submission of
bid wherever applicable on goods and services required for
performance of the contract including completed items of work.
c) GST leviable for the work (including material component) under
the Contract shall be borne by the Contractor and it shall not be
reimbursed by the GWSSB
d) Contractor must possess valid GST registration number as per
provision of GST Act. Rules Notifications. Instructions etc. issued
by the Government of India/State Government on the subject
matter from time to time and will produce the copy of the same
to Division/other office before issue of work order. In case of
considering available exemption or having turnover below
threshold limit liable for registration under Act. Should give
declaration to the effect along with applicable GST rate for
material/services charge mechanism while making payment to
the contractor and GWSSB will not bear burden under GST.
Further if the Contractor is assesse of GST the Contractor should
produce valid GST clearance certificate/relevant evidences
complying GST provisions before the payment of the final bill.
otherwise the final payment to the Contractor snail be Withheld.
The contractor even after completion of the work and even if final
payment have been made to him, shall be liable to pay any GST
liability and authority shall not be responsible for any GST liability
of the contractor.
e) As per the provision of GST act, in applicable cases a may be
notified from time to time, tax will be deducted as source.
Provisions of reverse charge under GST act will be applied,
wherever applicable including case of contractor not having valid
GST registration number.
f) Difference of payment due to any upward revision of GST (except
on those components whose price rise is fully compensated as
per clause, No 59. Price adjustment) during the period of contract
shall be borne by the GWSSB. Such tax shall be paid by the
contractor and it will be reimbursed by GWSSB upon production
and verification of proof of payment and applicability of relevant
provision of GST. Similarly in the event of reduction or abolition
of GST on any or all materials purchased by the contractor or on
service availed for completion of the work under contract and in
respect of completed item of work, the contractor shall pass on
this benefit to the GWSSB. For above purpose, the contractor
shall produce certificate from their auditor/ chartered accountant
/ tax consultants giving year-wise details of purchases, revised
rate of GST, quantum of burden/ benefit due to revision of GST
etc. along-with the proof of payment and other evidences. The
GWSSB will reimburse or recover as the case may be such
amount, after scrutiny of the claim at the time of final payment of
g) The contractor enjoying GST exemption at the time of submission
of tender and / or at any time during the currency of they
contract shall pass on this benefit to the GWSSB. Contractor shall
provide certificate duly signed by their auditor/ chartered
accountant/ tax consultant before payment of final bill, other wise
payment of final bill shall be withheld.
g) If any amount of benefit under GST including input tax credit, if
any, is denied or delayed to GWSSB or any penal charges or
interest is imposed due to any non-compliance by the contractor,
(for example on failure to upload GST returns or incorrect
disclosure of details on the GSTIN portal or delay/failure to
deposit tax within due dates or due to non-furnishing or
furnishing of incorrect/incomplete documents by contractor,
wrong determination of rate of tax, nature of supply etc), the
contractor shall be liable to reimburse the loss which arises to
GWSSB on the aforesaid account. Alternative GWSSB reserves
right to withhold the payment of all the subsequent bills issued
by the contractor and recover such loss from any outstanding
h) The rates to be quoted by the Contractor must be inclusive of all
taxes prevailing on due date of bid submission .However any
subsequent changes in the tax structure by Government after
due date of bid submission will be compensated (±) on
availability or submission of actual documentation. Contractor
has to intimate Engineer in charge regarding changes occurred in
the tax structure after bid submission. lf contractor fails to
provide such information and if any financial obligation may
arise due to change in tax structure ,same will be recovered
from the contractor .
i) The contractor shall apply fair means of stock maintenance and
shall adopt accounting standards as may be prescribed under
GST .for arriving at the difference in procurement prices due to
introduction of GST ,it will be open for the government to ask for
original invoices ,LR, weigh bridge slips, payment details and
such other documents as may be required for the purpose.lf
there is reduction in overall tax burden then proportional benefit
of that shall be passed on to the Government.(TNC-10-2017-01-
Other taxes (central, state, local) – The rates quoted by the contractor
shall also be deemed to be inclusive of other taxes (central, state,
local) prevailing a son 30 days prior to submission of bid wherever
applicable. In case of any upward revision or reduction or abolition of
these taxes, procedure laid down as above for GST shall be followed.
27. Income Tax shall be deducted as per prevailing norms
Signature of Contractor Executive Engineer
Public Health Engineering Works Division
2. BID FORM (WITH PRICE)
Bidders are required to fill up all the blank spaces in this Bid Form.
SUB : Name of work
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission,
operate, maintain and Run the whole of the said works for ............. Months from the date of
commissioning including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to Price
Nos.____________________ (insert numbers) for Lump sum fixed price of
for Construction including free trial run for One months or such other sum as may be
ascertained in accordance with the conditions.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract with in ......... Months, inclusive of monsoons, from the date or receipt of Letter
of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of
bid and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the Clause 1 of Volume-IB, General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
NAME OF WORK:- : Providing Supplying and Laying of gravity main pipe line From Pethapur
Chokadi to Existing PVC Line of Villages under M&R of SSW G-1 regional w.s. scheme. Ta&Dist.:
Schedule showing the materials to be supplied to the contractor by GWSSB from
store specified below for the work Free of Cost.
Sr.No. Particulars Quantity in Mts. Rate Unit Place of Delivery
1. Contractor shall have to buy bring ordinary Portland cement as per IS-812/1989
and IS-12269/1987 or its latest revision with ISI mark and steel FE-415/500D as per
approved Board vendor list and produce the bill of purchase along with necessary
test certificate at the time of claiming running account bills. Cement shall be use
2. All materials except shown in schedule-A req. for the work shall be provided by
3. Cement to be brought and used by contractor as per approved board vendor list.
4. The Contractor shall arrange lifting & carting of materials from departmental store to
the site of work, which includes loading, unloading & proper stacking of materials.
5. Any materials required for item other than labour charges item in schedule-B and
materials not included in schedule-A but available with department will be issued on
request of the contractor at department issue rate/market rate which ever is more.
6. Water and electricity required for the construction and execution of works will be
arranged by the contractor at his own cost.
7. Contractor shall have to procure the all pipes, specials, joints, valves, water meter,
etc. from approved manufacturer or approved by Engineer in Charge.
8. Contractor shall have to read the tender in details & quote the rates accordingly
necessary all taxes admissible by Govt, shall be deducted from the bill.
9. If department provides any items from prescribed schedule B then contractor shall
not be claim any amount for that.hence those item will be count as saving item.
Signature of Contractor Executive Engineer,
Public Health Works Division,
NAME OF WORK:- : Providing Supplying and Laying of gravity main pipe line From Pethapur Chokadi to
Existing PVC Line of Villages under M&R of SSWG-1 regional w.s. scheme. Ta&Dist.: Gandhinagar
Qty Unit Item Rate Per Amount
Providing and supplying in standard length ISI mark
rigid unplasticised PVC pipes suitable for potable water
with ring fit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
the departmental stores and including cost of jointing
meterial etc. complete.Test Pressure 6 Kg/cm2. (A)
Providing Special suitable to PVC pipes with necessary
jointing materials incl. loading unloading carting 51.75 no
stacking all taxes octroi etc.complete. 1) 250 mm dia
Providing, Supplying ISI mark CI D/F Sluice Valves as per
IS:14846(Latest Edition)of following class and diameter
including all taxes,insurance,transportation, freight
charges, octroi, inspection charges,loading
unloading.conveyance departmental stores stacking
(A) Sluice valve PN 1.6 with hand wheel / cap operated
(PD type short body) (1)250 mm dia
Providing and supplying C.I.Temper proof Air valves
with SS 304 Float gun metal Nozzle of approved make
and quality of following class and dia including all taxes
insurance transportation freight charges octroi,
inspection charges, loading, unloading, conveyance to
departmental stores stacking, etc, complete. Without
isolating sluice valve PN 1.0 (1)40 mm dia
Excavation for pipeline trenches for water supply,
sewerage line, manhole etc.all with shoring and
struting if required as per required gradient and line
including safety provision using site rails and stacking
excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as
specified. (a) In all sorts of soil & murrum
Up to1.50m Depth
(a) In all sorts of soil & murrum
Lowering, laying and jointing PVC/uPVC/cPVC pipes and
specials of following class and diametgr including cost
850.00 of conveyance from stores to site of works including Rmt
coat of labour, material, cement solvent, giving
satisfactory hydraulic testing as per lSl code.(1)250 mm
Lowering,Laying and jointing in position following C.I /
D/F Reflux valves, Butterfly valves, Sluice valves and Air
valves including cost of all labour, jointing material,
including nut bolts and giving satisfactory hydraulic
testing, etc. complete.
(i) 250 mm dia Sluice Valve
2.00 no 2) 40 mm dia air valve 251.00 no
Refiling the pipeline trenches including the ramming,
watering, consolidating desposal of surplus stuff as
1105.80 cum 22 cum
directed within a radius of 3 km.
Construction of valve chambers in brick or bela stone
masonary, locally available in C.M. 1:6 Foundaion
concrete 150mm thick in C.C. 1:4:8 of trap metal size
to 40mm thick, inside cement plaster in C.M. 1:3 and
cement pointing outside in C.M. 1:3 and top cover of
precast RCC slab 100 mm thick (with key hole in two
parts, each with handles or MS bar etc. complete as
given size) upto 1 mt. depth from G.l to pipe invert level
1.00 no incl. complete civil works but excl. cost of excavation 11351.00 No
with cast in sity RCC slab in one single piece with fixing
of CI-MH Frame and cover (excl.cost of CI-MH Frame
and cover)with 23 mm thick brick masonary wall in C.M
Size 1.30×1.30×1m For Sluice valve of 250mm dia &
Erection of Air valve riser by installing new M. S. Pipe of
6mm thick and 3.2 meter length with necessary fittings
such as flange of appropriate size, nut bolt &
2.00 no embedded the pipe in RCC M 150 with offset of 10 cm 3112.00 no
around pipe with necessary steel etc. complete.40 mm
dia D / A. Air Valve
Dia of Air valve 40mm & MS pipe
Drilling of 600 mm dia. Horizontal borehole for
watermain pipeline crossing under the road incl. in all
strata with required length inclu. fixing of 500 mm
90.00 rmt dia.MS/RCC Casing pipe with pusing etc. complete 8131.578 rmt
various size of pipe for 273.10 dia. to 355.60 dia
watermain(for 45 Mtr.Length) without water main &
with RCC Casing pipe.
Making job connection for jointing new laid pipeline to
2.00 exiting incl.cutting the pipeline and fixing with special
job 3340.00 job
testing incl.cost of specials and jointing material
I/We am/are willing to carry out the work at ______ %
above /below _____
Percent (should be written in figures and words )
Below/above the tendered rate
mentioned at above amount of my /our tender comes as
Estimated Amount put to Estimated Amount put to
Tender Rs. ______________ Tender Rs. __________
Deduct Rs. Add. Rs.
Net Rs. Total Rs.
In words. In words.
Executive Engineer
SIGNATURE OF CONTRACTOR P.H.Works Division
(Bidders are required to fill up all blank spaces online in this Bid Form)
The Superintending Engineer
Gujarat Water Supply & Sewerage Board
Jal Bhavan, Behind Town Hall,
Elisbridge, Ahmedabad
SUB : Providing Supplying and Laying of gravity main pipe line From Pethapur Chokadi to
Existing PVC Line of Villages under M&R of SSW G-1 regional w.s. scheme.
Ta&Dist.: Gandhinagar
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda/Amendments to the above, for the execution of the above Contract, we
the undersigned offer to carry out operation and maintenance the whole of the said Works
for two years from the date of work order as given in Conditions of Contract and in
conformity with the Drawings, Conditions of Contract, Specifications, Preamble to Price
Nos._______________(insert numbers) for Lump sum fixed price of
Operation and Maintenance for a period of two years or such other sum as may be
ascertained in accordance with the Conditions.
2. I / We agree that
(a) if we fail to provide required facilities to the Employer's representative or any other
person/agency by the employer to perform on his behalf for carrying out O & M work
(b) if we fail to deliver raw water of required quantity and maintaining the quality
according to the conditions/stipulations of the Contract, GWSSB will be at liberty to
take any action including termination of Contract and impose at his absolute
discretion any penalties, and/or reject the work.
3. We agree to abide by this Bid for a period of 180 days from the date fixed for receiving the
same and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement is
prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
5. We agree, if our Bid is accepted, to furnish Performance Bond/Security in the forms and of
value specified in the Conditions of Contract of a sum equivalent to 10% of the Contract price
for due performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorised to sign Bid for and on behalf of
(Fill in block capitals)
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in
the measurement books in the form and by the method approved by the Employer's
Representative, and signed jointly by both the parties.
BREAK UP FOR INTERIM PAYMENTS
Percentage Payment to be
Item Description of Items
a On receipt of materials at project site (Work done)
65 % of Quoted rate
Pipe to be provide by GWSSB
b On Excavation,Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.VOL 1 A Technical Bid.pdf
2. GCC_VOL-I_B1.pdf
3.Final price Bid.pdf
4.Specification.pdf
TENDER NOTICE NIT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .