Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹17,740.77 (12.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
24 Jul 2026, 6:00 pmClosed
Executive Engineer REW ganderbal
Executive Engineer REW ganderbal
Construction of footpath from h/o syed ahmad khan and others at chanhar at Gutlibagh Block Ganderbal PRI -43
2026_RDPR_316351_12
E NIT No. 31/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Rural Development and Panchayati Raj
₹4,000
28 Jul 2026
16 Jul 2026
25 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of ground including removing of vegetation and in equalities not exceedind 15cm deep and disposal of frubbish, including dressing of sides and ramming of bottoms lift upto
1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed
All kinds of soil : | 129 | sqm | 24.12 | ₹3,111.48 |
| 2 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 11.91 | cum | 1,200 | ₹14,292 |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 18.45 | cum | 5,733.6 | ₹1,05,784.92 |
| 3.1 | 20% plums | 1.01 | sqm | 1,200 | ₹1,212 |
| 4 | Centring and shuttering including propping, strutting and removal of form work for foundations, footings, bases of columns for mass concrete | 11.16 | sqm | 286.35 | ₹3,195.67 |
| 5 | p/fixing of interlocked Tiles 50mm thick on sand cuhion 50 mm thick incld all caarriages. | 83 | sqm | 750 | ₹62,250 |
| 6 | Carriage of materials aggregate/sand by means of mechanial transport for an average lead of 15 km | 21.04 | cum | 340 | ₹7,153.6 |
| 7 | Provision for signboard and photographs | 1 | job | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1031219.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .