Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹92.3 LAccepted-AOC | H1 | Accepted-AOC Accepted | |
| 2 | H2₹94.0 L+₹1.7 L (1.88%)Rejected-Finance | H2 | Rejected-Finance Combined evaluation score less than H1 | |
| 3 | H3₹76.5 L−₹15.7 L (17.1%)Rejected-Finance | H3 | Rejected-Finance Combined evaluation score less than H1 | |
| 4 | H4₹98.2 L+₹5.9 L (6.41%)Rejected-Finance LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | H4 | Rejected-Finance Combined evaluation score less than H1 | |
| 5 | H5₹1.4 Cr+₹43.2 L (46.9%)Rejected-Finance 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | H5 | Rejected-Finance Combined evaluation score less than H1 |
Tender Value
₹1.6 Cr
EMD Value
₹2 L
Closing Date
25 Oct 2019, 10:00 amClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizoram
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR IMPVMT OF ROAD KPT FM KM 45PT00 TO KM 66PT69 AND TBSPS RD FROM KM 07PT80 TO KM 29PT18 to NHDL SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE
2019_BRO_498833_1
Tender CE(P)PSK-07 /2019-20
Open Tender
Consultancy
Works
120 days
ROAD KPT FM KM 45PT00 TO KM 66PT69 AND TBSPS RD FR
As per RFP documents
10 documents required · 10 mandatory
₹0
₹2 L
Yes
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizor
22 Feb 2020
30 Aug 2019
26 Oct 2019
31 Aug 2019
25 Oct 2019
9 Sept 2019
31 Aug 2019 - 7 Sept 2019
6 Sept 2019
Amount
Engaging Technical Consultant For Carrying Out Consultancy Services for preparation of Detailed Project Report (DPR) for improvement of road Kalchaw-Phura-Tongklong from Km 45.00 To Km 66.690 (net length 21.690 Km) to NHDL specification (10 M width having single lane paved) Remuneration for Local Staff (including per diem allowance)
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Sub-Professional Staff (To be assessed byconsultant as per requirment of assignment)
Assistant Highway Engineer
Assistant Bridge Engineer
Assistant Survey Engineer
Assistant Material engineer Engineer
Assistant Environmental Engineers
CAD/MX Expert
Technical Assistant
Support Staff Note: To be assessed by consultant as per requirment of assignment
Office manager
Typist
Office boy
Night watchman
Transportation
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of consultants
Duty Travel to site (Fixed cost)
Trips
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (3 Copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft notification for land acquisition as per State Act( 3 copies each)
LA & Clearances II Report
Survey and Investigation
Survey and Investigation
Topographic Survey including hirecharges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile or equivalent technology
B. Investigation (Fixed cost)
Road and Bridge Inventory
BBD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring)
Boring in all type of soils (other than hard rock)
Boring in hard rock
Estimate of Costs for Expatriate Consultants (Name and position to be filled in below columns by the bidder) Remuneration of Expatriate Staff including per diem allowances
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - International Airfares (Fixed costs) (To be filled by the bidder in below columns)
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)(fixed cost)
Total Cost of KPT Road
Engaging Technical Consultant For Carrying Out Consultancy Services for preparation of Detailed Project Report (DPR) of road Thingsai-Bualpui-Saisih-Pangkhua-Sangau from Km 7.800 To Km 21.980 (net length 21.380 Km) to NHDL specification (10 M width having single lane paved) Remuneration for Local Staff (including per diem allowance)
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Sub-Professional Staff (To be assessed byconsultant as per requirment of assignment)
Assistant Highway Engineer
Assistant Bridge Engineer
Assistant Survey Engineer
Assistant Material engineer Engineer
Assistant Environmental Engineers
CAD/MX Expert
Technical Assistant
Support Staff Note: To be assessed by consultant as per requirment of assignment
Office manager
Typist
Office boy
Night watchman
Transportation
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc A. For use of consultants
Duty Travel to site (Fixed cost)
Trips
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (3 Copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft notification for land acquisition as per State Act ( 3 copies each)
LA & Clearances II Report
Survey and Investigation
Survey and Investigation
Topographic Survey including hirecharges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile or equivalent technology
B. Investigation (Fixed cost)
Road and Bridge Inventory
BBD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring)
Boring in all type of soils (other than hard rock)
Boring in hard rock
Estimate of Costs for Expatriate Consultants (Name and position to be filled in below columns by the bidder) Remuneration of Expatriate Staff including per diem allowances
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - International Airfares (Fixed costs) (To be filled by the bidder in below columns)
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)(fixed cost)
Total Cost of TBSPS Road
Agnitio Infrastructure Projects Pvt. Ltd.
Planning & Infrastructural Development Consultants Pvt. Ltd.
LION ENGINEERING CONSULTANTS
INDIA INTERNATIONAL INFRASTRUCTURE ENGINEERS LIMITED
TECHNICAL CONSULTANCY SERVICES
PIONEER INRA CONSULTANTS PVT. LTD.
GLOBAL INFRA SOLUTIONS
GMD Consultants
L N MALVIYA INFRA PROJECTS PVT LTD
Voyants Solutions Private Limited
Subudhi Technoengineers Pvt Ltd
Marc Technocrats Private Limited
Holtec Consulting Private Limited
SOWiL Limited
Casta Engineers Pvt Ltd
Almondz Global Infra Consultant Limited
MSV INTERNATIONAL INC
Xplorer Consultancy Services Pvt. Ltd.
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .