Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | -35.90% | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 L+₹54,776.67 (9.55%)Admitted-Fee/PreQual/Technical/Finance | -29.78% | ₹6.3 L+₹54,776.67 (9.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.0 L+₹1.2 L (21.7%)Admitted-Fee/PreQual/Technical/Finance | -22.00% | ₹7.0 L+₹1.2 L (21.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.8 L+₹2.0 L (35.7%)Admitted-Fee/PreQual/Technical/Finance | -13.00% | ₹7.8 L+₹2.0 L (35.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.9 L+₹2.1 L (37.3%)Admitted-Fee/PreQual/Technical/Finance | -12.00% | ₹7.9 L+₹2.1 L (37.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.9 L
EMD Value
₹17,900
Closing Date
8 Sept 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Laying and fitting of main/ distribution pipe line under the up-gradation/retrofitting of WSS Achambur (scheme id 40008452) (under JJM).
2026_PWD_19458_1
Short E-tender- 82 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
15 days
Achambore
Refer to NIT
3 documents required · 3 mandatory
₹90
Payable To Executive Engineer PHE Division Kargil
₹17,900
15 Sept 2026
29 Aug 2026
9 Sept 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All kind of soil 70% | 178.5 | Cum | 360 | ₹64,260 |
| 1.02 | Ordanary rock 15% | 38.25 | Cum | 750 | ₹28,687.5 |
| 1.03 | Hard Rock (by Chesling) 15% | 38.25 | Cum | 1,700 | ₹65,025 |
| 2Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 2.01 | All kind of soil 70% | 365.4 | Cum | 360 | ₹1,31,544 |
| 2.02 | Ordanary rock 15% | 78.3 | Cum | 850 | ₹66,555 |
| 2.03 | Hard Rock (by Chesling) 15% | 78.3 | Cum | 1,800 | ₹1,40,940 |
| 3Laying and fitting of pipes (PN-16 and PE-100) complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. | |||||
| 3.01 | HDPE Pipe 25mm dia | 240 | RM | 23 | ₹5,520 |
stage.html
html • 0.03 MB
finance_46113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.55 MB
BOQ_46113.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .