| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC | ₹36.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.3 LRejected-AOC | ₹38.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹38.6 LRejected-Finance | ₹38.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹44.5 LRejected-Finance | ₹44.5 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical DOCUMENTS NOT PROPERLY SIGNED |
| Sl No | Description | Qty | Unit | BINUKUMAR N L6 | Prakash S L5 | VISHNU R P L4 | Praveen T.T L3 | Y SANTHOSHKUMAR L1 | S SAJEEV L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix C - Workshop Renovation and related works | |||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 300 | sqm | 20 ₹6,000 | 10 ₹3,000 | 7 ₹2,100 | 8.75 ₹2,625 | 8.25 ₹2,475 | 8.57 ₹2,571 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 76.8 | cum | 367.72 ₹28,239.79 | 350 ₹26,878.95 | 295 ₹22,655.12 | 335 ₹25,727 | 319.92 ₹24,568.90 | 332.42 ₹25,528.86 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 76.8 | cum | 325.55 ₹25,001.26 | 300 ₹23,039.10 | 250 ₹19,199.25 | 296 ₹22,731.91 | 283.23 ₹21,751.21 | 294.3 ₹22,601.36 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.99 | cum | 8,109.18 ₹89,111.78 | 7,500 ₹82,417.50 | 6,800 ₹74,725.20 | 7,379 ₹81,087.83 | 7,054.99 ₹77,527.29 | 7,330.7 ₹80,557.06 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 75.25 | cum | 8,528.9 ₹6.4 L | 8,300 ₹6.2 L | 7,200 ₹5.4 L | 7,761 ₹5.8 L | 7,420.14 ₹5.6 L | 7,710.13 ₹5.8 L |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 184.72 | sqm | 779.84 ₹1.4 L | 700 ₹1.3 L | 580 ₹1.1 L | 710 ₹1.3 L | 678.46 ₹1.3 L | 704.98 ₹1.3 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 555.25 | kilogram | 125 ₹69,406.88 | 100 ₹55,525.50 | 98 ₹54,414.99 | 105 ₹58,301.78 | 99.98 ₹55,514.39 | 103.89 ₹57,685.44 |
| 1.01 | OD255237/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Min. cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix is not payable or recoverable separately. All work upto plinth level | 8.61 | cum | 11,131.56 ₹95,809.34 | 10,000 ₹86,070 | 11,000 ₹94,677 | 10,130 ₹87,188.91 | 9,684.46 ₹83,354.15 | 10,062.93 ₹86,611.64 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 25.91 | sqm | 1,030.96 ₹26,707.02 | 900 ₹23,314.50 | 770 ₹19,946.85 | 938 ₹24,298.89 | 896.94 ₹23,235.23 | 931.99 ₹24,143.20 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
15 Oct 2025, 4:30 pmClosed
Executive Engineer
Special Buildings Division Public Office Compound
GENERAL-Sainik School Kazhakoottam - Construction of New Class Room Building - Phase I-Works-General Civil Work
2025_PWD_805830_1
PWD/BLDG/TR/2097/2025_5_1_1/1
Open Tender
Civil Works - Buildings
365 days
Special Buildings Division Public Office Compound
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
3 Jan 2026
6 Oct 2025
18 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
Amount
Appendix C - Workshop Renovation and related works
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD255237/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Min. cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix is not payable or recoverable separately. All work upto plinth level
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
OD255238/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Min. Cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix is not payable or recoverable separately. All work above plinth level upto floor V level
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
6.4.1:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand)
22.14.3:Grading roof for water proofing treatment with:Cement mortar 1:4 ( 1 cement : 4 coarse sand )
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
OD249155/2024-2025:Providing and fixing precoated galvanised iron profile PUF sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 30 mm overall thickness and external face consists of 0.40 mm and internal face consists of 0.30 mm thick sheets having total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheets are sandwiched with a core which is an insulated panel and is made of polyurethane PIR mineral wool. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x110mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
12.51.1:Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screwscomplete :Ridges plain (500-600 mm)
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
S SAJEEV (BID ID -2384192)
Praveen T.T (BID ID -2391592)
VISHNU R P (BID ID -2390696)
Prakash S (BID ID -2389881)
BINUKUMAR N (BID ID -2384199)
Bidder Name
Praveen T.T
BINUKUMAR N
Prakash S
VISHNU R P
S SAJEEV
Y SANTHOSHKUMAR
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1341806.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid