GENERAL MANAGER (M&C)
TENDER DOCUMENTS FOR BI-ANNUAL RATE CONTRACT FOR HIRING OF DIFFERENT TYPES OF PETROL / DIESEL VEHICLES AT GIPCL-BARODA PLANT.
272378
MAT/MM/TRANSPORT ARC/GIPCL/2025-27
Open
Power/Energy Projects/Products/Services
Works
Vadodara
₹2,950
GM (M&C), Gujarat Industries Power Co. Ltd. and payable at Vadodara
₹1 L
3 Feb 2026
3 Feb 2026
3 Feb 2026
24 Feb 2026
3 Feb 2026
Estimated cost of Tender
(Rupees One Crore Twenty-Four Lakh Twenty
Thousand One Hundred Sixteen and Paise
Submission of EMD, Tender fee and On or before due date during office hours at
other supporting documents for technical 17 :30 hours
Bid in physical form.
1. Amendment / corrigendum of the tender document, forms, schedules, etc. may be done
any time by the GIPCL during the period of publication of tender in the website. The
Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders without assigning any reason
3. The Bidders are required to quote the rate strictly as per the schedule of quantities &
rates and conditions mentioned in the tender document, adhering to scope of work,
General terms & conditions and special conditions of contract as well.
4. The Bidders are required to submit their Bids online only through the website
https://www.nprocure.com in the form of %age i.e. “At Estimated Value OR
_____%age below the estimated value OR______% age above the estimated value.
5. The EMD & other supporting documents are to be submitted in physical form only at the
following address:
General Manager (M&C)
Gujarat Industries Power Company Limited
P.O.Petrochemical –
Dist: Baroda (Gujarat)
Phone Nos.: (Direct) 2234252, EPABX (0265) 2232768, 2232213,
Extn: 4252, E-Mail: purchase @gipcl.com
GUJARAT INDUSTRIES POWER COMPANY LIMITED
Tender No: MAT/MM/TRANSPORT ARC/GIPCL/2025-27
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an installed
capacity of 1084.4 MW comprising of various conventional and renewable projects.
GIPCL commissioned its first power project ; a 145 MW gas based combined cycle
power plant in 1992 at Vadodara. It expanded its capacity 165 MW Naptha and gas
based Combined Cycle Power Plant at Vadodara in 1997. GIPCL has commissioned
1MWp Distributed Solar Power Projects at two locations in Gujarat viz. at Village: Amrol,
The Company intends to award Bi-Annual Service Contract for the work of Hiring of
different types of Petrol and Diesel vehicles for a period of two years at Baroda and is
therefore inviting open tenders online (e-Portal) from experienced & resourceful
2. SCOPE OF WORK :
2.1 The scope of work covers provision of Casual and Regular hired vehicles for purpose
of GIPCL. Refer Section D “Special Conditions of Contract” for detailed scope of work.
2.2 The bid submitted by the bidder not covering the total scope of work and services as
detailed out in the tender document shall be liable for rejection.
2.3 Quantum of job mentioned against all items in the price bid are indicative only & may
vary as per site requirement & not to be construed as maximum or guaranteed
quantity. The quantities shown in the price bid are approximate quantities for the
contract period and they may vary as per job requirements.
2.4 All the miscellaneous activities pertaining to specific work to be executed for
satisfactory performance is in the scope of contractor in his quoted rates.
3 GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read and comply
with the instructions and the Terms & Conditions contained in the tender documents.
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any alteration,
erasures or overwriting shall be liable to make the tender invalid unless the same is
neatly carried out and attested over the full signature of Bidder. The decision of the
Company to interpret the information and rates filled in by the Bidder shall be final and
binding on the Bidder.
3.3 The Bidders are requested to make themselves fully conversant with the General
Conditions of Contract, Special Conditions of Contract, Technical Specifications, Site
conditions, Safety & Health Aspects and Norms to be observed etc. before submitting
their bids so that no ambiguity arises in these respects subsequent to submission of
3.4 Before quoting the rates, the Bidder must visit site and should go through the
specifications, scope of work etc. and get himself fully conversant with them. The Bid
should include cost of mobilization and cost to adhere to all Safety Norms as
described in the tender. No relaxation or request for revision of quoted/accepted rates
shall be entertained subsequent to the opening of Bid on account of mobilization or
3.5 Bidder has to submit all the information as per required Bid document. Failure to
furnish all the information as per required Bid documents or submission of a Bid
containing deviations from the contractual terms and conditions, specifications and
requirements, shall be rejected.
3.6 The Bids shall be submitted within the time frames set out in the Notice Inviting Tender
(‘NIT’) and Bids submitted thereafter shall not be accepted and considered.
3.7 The tender documents shall not be transferable.
3.8 The Bidders are expected to examine all instructions, forms, terms & specifications in
the Bid documents and to get fully acquainted themselves with all the conditions and
matters which may affect the subject matter of the work/tender or the cost thereof. If
any Bidder finds any discrepancies or omissions in the specifications and documents
or any doubt in true meaning or interpretation of any part, he shall seek necessary
clarifications in writing if required.
3.9 Conditional offers shall not be considered and liable to be rejected.
3.10 The Company reserves the right to extend the deadlines for submission of the Bids by
giving amendments.
3.11 During evaluation of Bids the Company may, at its discretion ask the Bidder (s) for
clarification of their Bid. The request for clarification and the response shall be in
writing and no change in prices or substance of the Bid shall be sought, offered or
3.12 The Company reserves the right to amend/ modify the Bidding documents at any time
prior to the deadline for submission of Bids, either at its own discretion or in response
to the clarification requested by a prospective Bidder. In such case, the Company may
in its discretion extend the deadline for submission of Bids in order to facilitate the
prospective Bidders for incorporating the effect of the amendment in their Bids.
3.13 The Bidders shall bear all costs and expenses associated with the preparation and
submission of their respective Bids, to attend meetings or conferences, if any,
including any pre award discussion with the successful Bidder, technical and other
presentations etc. and the Company shall not be liable for any expense thereof.
3.14 If the successful Bidder is consortium/joint deed of undertaking of company, the
Consortium leader/Bidder shall accept joint and several responsibilities and liabilities
for all obligations under the Contract. Timely and satisfactory completion of the work
and strict adherence to the allotted time frames for jobs shall be the essence of the
3.15 The Company reserves the right to qualify/disqualify any applicant without assigning
3.16 The Bidder shall be disqualified if any untrue statement or misrepresentation is made
in the Bid forms, attachments and other supporting documents submitted by the
4 ELIGIBILITY CRITERIA FOR BIDDERS
The following criteria shall be adopted for qualifying the Bidders for further proceeding.
4.1 Bidder should possess minimum Three years of experience during last five years
in similar nature of jobs like Transport Services and should enclose proof of the same.
Bidder shall submit necessary evidence for the same like self-attested copies of work
orders/Work Execution/Work Completion certificates from clients. The work
completion certificate shall comprise of Order value & Executed value. Bidders should
have executed the work directly. The work executed as a sub-contractor or subletting
agency shall not be taken in to consideration.
4.2 Bidder should produce evidence of having experience of successfully completed
similar works as defined hereunder during last five years ending last day of the
month previous to the one in which tender is invited, satisfactory progress of ongoing
works etc. secured from clients along with self-attested copies of documentary evidence
preferably photo copies of work experience. The experience should be either of the
One similar completed/executed work each costing not less than the amount
equal to Rs. 37 Lakhs excluding tax and duties.
Two similar completed/executed works each costing not less than the
amount equal to Rs. 24.50 Lakhs excluding tax and duties.
Three similar completed/executed works each costing not less than the
amount equal to Rs. 18.50 Lakhs excluding tax and duties.
4.3 Bidder should specifically mention fulfilling of above criteria in his offer along with details
of work orders & work completion/execution certificates issued by clients.
4.4 Tender fee: Rs.2950/- (Rs. Two Thousand Nine Hundred Fifty only). By Demand Draft/
RTGS in favor of GIPCL payable at Vadodara.
EMD: The EMD shall be accompanied in the form of DD/RTGS or Bank Guarantee given
by Bank as described in subsequent clause no.
4.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
4.6 Attested copies of relevant documents duly signed & seal on each & every page
shall be submitted. GIPCL may verify the documents, experience certificates issued by
concern authority. After opening of technical Bid, if any required attested documents
found missing in the Technical Bid submitted by the Bidder, the tender inviting authority
may inform to that Bidder by E-mail to submit the missing required documents within
stipulated time limit. If Bidder/Bidders fail to submit within stipulated time, their Bid will
be declared technically disqualified and no further correspondence will be entertained.
4.7 Bidder should have average annual turnover of Rs 1.00/- crore during last three
financial years. Bidder shall furnish annual audited financial statement duly
certified by Chartered Accountant for the last three financial years to demonstrate
the financial healthiness of the company. The balance Sheet and Profit and Loss
Account must be in the name of the company. Any type of MOU for this purpose will
not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does
not require audit, the bidder shall submit the turnover certificate from Chartered
4.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN), & GST
registration number. Copies of the same shall be submitted.
4.9 The net worth of the bidder should be positive as evidenced from audited accounts
of last financial year.
4.10 In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements /credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
4.11 If Bidder or its Partner(s) or Director(s) is /are/was in any Litigation(s), Court Case(s) or
Arbitration(s), either completed or under progress during last three (03) years or Black
Listed / Deregistered / Stopped or banned from dealing in the past by any Govt, of
Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported companies /
undertakings / organizations, Bid of that party may be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regard as final and binding
on the Bidder without any demur and that no further correspondence shall be done in
this regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure / Form attached.
4.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” as amended in Annexure / Form attached.
• If any Major Violation of any safety law(s) / Rule(s) is / are found during the
preceding Three (3) years, Bid of that party will be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regard as final and
binding on the Bidder without any demur and that no further correspondence shall
be done in this regard at any stage.
• If any of the details submitted in the prescribed Annexure / Form to the Bid is/are
found to be false, incorrect at any time in future, then the Contract awarded to that
Bidder / Contractor shall be liable to be terminated forthwith without any notice /
correspondence and Bidder agrees and undertakes to accept decision of GIPCL in
this regards as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Further, Performance /
Security Deposit will also be liable to be forfeited. Any dues to GIPCL from the
Bidder / Contractor shall be recovered from the pending bills or any other dues
payable to the Bidder / Contractor, if any or otherwise through any other recourse
available under the Laws
• The Bidder shall submit all the evidences, documents, attested copies of work
orders & work completion certificates etc… as a proof with EMD &Tender Fee and
also provide the requisite details online for meeting the prequalification
requirements. GIPCL will verify the experience, performance, capability & strength
of Bidders, independently for executing the job. GIPCL may visit the site & consult
the owner of the industry/property where similar job is executed by the Bidder.
GIPCL reserves the right to accept/cancel/reject any/all Bids without assigning any
reason thereof. The tenders of qualified Bidder/Bidders shall only be considered for
further evaluation.
4.13 Site Visit is mandatory prior to submission of bid to understand the scope of work,
working conditions, site conditions, equipment’s, tools & tackles, labor deployment,
associated risk, surrounding etc.
5 LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to the
Bid exchanged by the Bidder and the Company, shall be written in the English language.
Any printed literature furnished by the Bidder, written in another language shall be
accompanied by an English translation for the purpose of interpretation of the Bid.
6 EARNEST MONEY DEPOSIT (EMD) and TENDER FEE
6.1 An EMD of Rs.1,00,000/- and Nonrefundable Tender fee Rs. 2,950/- shall accompany
with Bid. Tender fee shall be submitted through RTGS / in the form of a crossed bank
Demand Draft in favor of Gujarat Industries Power Co. Ltd. only.
6.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor of
Gujarat Industries Power Company Limited from any Schedule Public Sector Bank or
Schedule Private Sector Bank as per Performa of BG enclosed with this e-tender.
Alternatively, The EMD & Tender Fee may also be submitted through RTGS/online
mode of payment by the bidders as per the Bank details given below:-
BANK NAME:- INDIAN OVERSEAS BANK
BRANCH :- JAWAHAR NAGAR (0473) BRANCH
IFSC CODE :- IOBA0000473
NAME :- GUJARAT INDUSTRIES POWER COMPANY LIMITED
Also, EMD & Tender fee may be submitted through online payment gateway of
company’s website: www.gipcl.com (online Payment Form) as per detail provided
in Section-F (Annexure-M) herein under
6.3 In case EMD is paid in the form of BG, the same shall be valid for a period of 180 days
after the due date for submission of the bid.
6.4 The EMD of the successful bidder will be returned after payment of Security Deposit by
successful bidder.
6.5 The earnest money deposit will be refunded to the unsuccessful BIDDER as soon as
the tender is finalized and after award of LOI/Work Order. Any bid not accompanied with
EMD and Tender fee will be rejected. Tender fees and EMD should be submitted to
6.6 No interest shall be payable on EMD.
6.7 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance or (ii)
withdraws his tender before the validity date of the tender.
6.8 SCHEDULE OF EMD & TENDER FEES
EMD &Tender fee and other documents dully
Address for Submission:
signed to be submitted in physical form on or
General Manager (M&C)
before due date of closing of the tender
Gujarat Industries Power Company Limited
P.O.Petrochemical –
Dist: Baroda (Gujarat)
Phone Nos.: (Direct) 2234252, EPABX
Extn: 4252, E-Mail: purchase @gipcl.com
7 SUBMISSION OF BIDS
A. MODE OF SUBMISSION
The bids shall be submitted online at the e-portal system within the dates specified in
the NIT along with the details of tender fees, EMD in two parts as under:
a) Pre qualification and Techno-commercial Bid without price.
• Price Bid shall be submitted only in soft form through website
https://www.nprocure.com
• Note: Estimate includes cost of all manpower, equipment, vehicles,
consumables, tools & tackles, transportation, Safety statutory
compliance, mobilization etc...
• Goods & Service tax shall be paid extra at actual as per prevailing rates as
declared by Central Government on submission of documentary evidence.
• Bidder shall have to quote the rates in the form of %age. i.e. “At
Estimated Value OR _____%age below the estimated value
OR______% age above the estimated value.”
• GIPCL reserve the right to conduct e-reverse auction through (n) Procure
• If two or more bidders who have quoted at par with the SoR Rate, Work Order is
to be awarded to the bidder who is having higher average annual turnover during
last three financial years, if reverse auction is not conducted by GIPCL.
• The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
• Price bid submitted in hard copy shall not be considered for opening.
B. METHOD OF TENDERING/SIGNATURE ON BIDS
i. The Bid must contain the postal address like name, residence and place of business of
the person or persons submitting the Bid and must be signed and sealed by the Bidder
with his usual signature. The name of all persons signing the documents shall also be
typed or printed below the signature on each page.
ii. Bid by a consortium/joint deed of undertaking of company/partnership firm must be
furnished with full names of all partners and be signed with the partnership name,
followed by the signature and designation of one of the authorized partners or other
authorized representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
iii. Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or other
person or persons authorized to Bid on behalf of such Corporation/Company. A certified
copy of the board resolution/power of attorney authorizing such partner or
representative shall also be submitted.
iv. The Bidder's name stated on the proposal shall be the exact legal name of the firm.
v. Erasures or other changes in the Bid Documents shall be initialed by the person signing
vi. Bids not conforming to the above requirements of signing shall be disqualified.
8 MODIFICATION AND WITHDRAWAL OF BIDS
a) The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b) No Bid shall be modified subsequent to the deadline for submission of Bids.
c) No Bid shall be withdrawn in the interval between the deadline for submission of Bids
and the expiration of the period of bid validity.
9 POLICY FOR BIDS UNDER CONSIDERATION
a) Bid shall be deemed to be under consideration immediately after opening of the bid and
till official intimation of award/rejection made by the Company to the Bidders.
b) While the Bids are under consideration, Bidders and / or their representative or other
interested parties are advised to refrain from contacting by any means, the Company.
The Engineer, if necessary, will obtain clarifications on the Bids by requesting for such
information from any or all the Bidders, in writing as may be necessary. The Bidder will
no be permitted to change the price or substance of the Bid after the Bid has been
10 EFFECT AND VALIDITY OF THE BID
a) The Bid should be kept valid for acceptance for a period of one hundred and eighty
(180) calendar days from the last date of submission of Bids.
b) The submission of any Bid along with the required documents and specifications shall
constitute an agreement that the Bidder shall have no cause of action or claim, against
the Company for rejection of his Bid. The Company shall always be at liberty to reject
or accept any Bid or Bids at his sole discretion and any action will not be called into
question and the Bidder shall have no claim in that regard against the GIPCL.
11 OPENING OF BIDS
11.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case may be,
in presence of Bidder's representatives whenever such a procedure has been specified.
Otherwise the tender will be opened by the authorized officers of GIPCL.
11.2 Preliminary Examination:
The Company will examine the Bids for any computational errors, for sureties furnished
by bidder, for authentication of documents submitted and completeness of the Bids.
Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price will
be corrected & will be binding to the bidders
(b) If there is a discrepancy between the Total Bid Amount and the sum of total prices, the
sum of total prices shall prevail and the Total Bid Amount will be corrected & will be
binding to the bidders.
12 EVALUATION & COMPARISON OF BIDS
12.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest
evaluated Bid in conformity with the specifications of the tender documents.
12.2 The Technical Bids will be examined for minor matters regarding qualification of bids.
Subsequent to correspondence with the respective bidders, the decision of Tender
Committee will be final.
12.3 All responses to requests for clarifications shall be in writing and shall be presented to
the Company through e-mail or in a sealed envelope on or before the given date
requested by the Company. If the Technical clarifications sought by the Company do
not reach the Company on or before due date, the Bid will be rejected.
12.4 The comparison of all the Bids shall be carried out with reference to the scope of work
as per the technical specification. Any deviation/omission shall be evaluated at highest
quoted price of the deviation/omission quoted by any of the Bidder. In case a separate
price (for omission) is not given by any other Bidder, a reasonable price of the same
shall be taken & the same shall be binding to the Bidders.
12.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par. The loading
shall be carried out at an interest rate of 2% above PLR of SBI.
12.6 A Bid to be substantially responsive shall be one which on evaluation confirms to all the
terms, conditions and specifications of the Bid documents without any material deviation
or reservation.
12.7 For the above referred purpose, a ‘material deviation’ shall be one which:
a) Which affects in any substantial way the scope, quality or performance of the contract,
b) Which limits in any substantial way and in a manner inconsistent with the Bid
documents, GIPCL’s right or the Bidder’s obligations, under the contract,
c) Whose rectification would affect unfairly the competitive position of other Bidders
presenting substantially responsive bids.
13 RIGHT OF REJECTION OF TENDERS
13.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding process
and reject all Bids at any time prior to award of contract, without thereby incurring any
liability to the affected Bidder or Bidders or any obligation to inform the affected Bidder
or Bidders regarding the same.
13.2 Any Tender without EMD and Tender fee will be treated as non-responsive and shall be
rejected at the outset & no further correspondence shall be entertained regarding this.
13.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if such
Bidder has quoted an abnormally low rate in the Bid document/price Bid.
14 AWARD OF CONTRACT
14.1 GIPCL will award the contract to that bidder whose quotation has been determined to
be substantially responsive and evaluated as the lowest quotation in conformity with the
requirements of the specifications and documents contained herein, provided further
that the bidder is determined and evaluated to be qualified to perform the contract
satisfactorily.
14.2 The successful bidder shall be intimated of his selection through the Letter of Intent or
Letter of Award/ Work Order which shall be sent to him through e-mail, courier, fax or
registered mail.
14.3 GIPCL reserves the right to cancel/short close the contract during the contract period
without assigning any reason.
14.4 GIPCL reserves the right to split the contract quantity between vendors.
15 CONTRACT PERIOD
15.1 The contract will be for a period of 02 years from the date of actual commencement of
operation of the contract as stated in the Work Order (‘Contract Period’).
15.2 GIPCL reserves the right to extend the Contract Period up to 3 months on the same
rates and terms and conditions without any price escalation and entering into any new
15.3 The said Contract Period can be extended if mutually agreed upon by both the parties
up to one year and in such a case a revised work order shall be issued at the same
rates and terms & condition or at negotiated rates acceptable by both parties i.e. the
Company & the Contractor.
16 ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
17 Clarification of Bidding Documents
If any Bidder requires any further information or clarification in the Bidding Documents,
may notify the Company before one week of last date of submission of online Bid, in
writing or by E-mail at the GIPCL's mailing address [email protected]
as indicated in the 'Invitation to Bids'. The GIPCL's response (including an explanation
of the query) will be sent in writing or by E-mail to all prospective Bidders who have
received the Bidding Documents.
18 TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict adherence
to the time schedule for performing the specified 'Works'.
19 UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATION
The Bidder is required to carefully examine the specifications and documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies or
omissions in the specifications and documents or is in doubt for any meaning of any
part, he shall request in writing for an interpretation/ clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable through
cheque/RTGS only.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
Tender No: MAT/MM/TRANSPORT ARC/GIPCL/2025-27
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
Sr. Description
01. Tender documents are available only in electronic format and same can be
downloaded from the website https://www.nprocure.com and
https://gipcl.nprocure.com and it can be also viewed from Company’s website
02. Price should be submitted online through the website https://gipcl.nprocure.com only.
No physical submission of price bid will be entertained as it should be furnished on-
03. Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate (Class III) as per Information Technology Act-2000,
using which they can sign their electronic bids. Bidders can procure the same from
any of the license certifying Authority of India or can contact (n)code solutions- a
division of GNFC Limited, who are licensed Certifying Authority by Government of
04. All bids should be digitally signed. The bidders are required to contact at the below
mentioned address for detailed training on on-line tendering and also for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Infotower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India)
E-mail: [email protected], website: www.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for on line submission of bid in order to avoid non
E- REVERSE AUCTION:
1) GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
2) E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b) Minimum
three (03) lowest bidders, whichever is higher, shall be invited for participation in e-
Reverse Auction through n-procure platform.
3) Opening Price, Detrimental value and duration for the e-Reverse Auction shall be
informed to the qualified bidders before start of e-Reverse Auction.
4) After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
5) To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
https://e-auction.nprocure.com that the bidder shall be allowed to participate the e-
Reverse Auction
6) In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required
for participating in online e-reverse bidding, then the Bidder can contact the following
office for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding e
tendering registration process.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
Tender No: MAT/MM/TRANSPORT ARC/GIPCL/2025-27
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security/Performance Bank Guarantee, the successful Bidder, to
whom the work is awarded, shall be required to furnish a Performance Bank Guarantee
(PBG)/Contract security deposit (SD) in favour of Gujarat Industries Power Company
Limited of an equivalent amount of ten percent (10%) of the “Annual Contract Price
excluding taxes and duties” in the format attached in SECTION-F, and it shall
guarantee the faithful performance of the 'Contract' in accordance with the terms and
conditions specified in these documents and specifications. Contract security
deposit/PBG shall be submitted strictly within twenty one days from the date of
LOI or work order, whichever is earlier. The PBG/ Security Deposit shall be valid up to
retention period of four months from the contract completion date. The Guarantee
amount shall be payable to the Company in Bidder's home currency without any
condition whatsoever.
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Retention Period' after
completion of contract and on fulfilling contractual obligations throughout the retention
period. However, any delay in submission of SD will result in equivalent late release of
entire SD after guarantee period.
Bid security/EMD should be refunded to the successful bidder on receipt of Performance
2. RECOVERY CLAUSE:
(a) In case of any damage of equipment/machinery due to negligence of contractor or any
other reasons attributed to contractor the decision of Head of Management regarding
the amount of recovery shall be final and binding subject to a maximum of 10% of
contract value. Recovery will be affected from the monthly bills and/or retention
money/security deposit.
(b) If the contractor fails to execute the work as per directions of HoD Security within the
time frame given in work order and as per day to day instructions by HoD Security /in-
charge, GIPCL shall get the work done by third party at the risk & cost of the contractor
with 10% additional overhead charges of GIPCL.
3. DEDUCTIONS FROM CONTRACT PRICE:
All costs, charges or expenses that GIPCL may have paid, for which, under the contract
the contractor is liable, shall be recovered by the GIPCL. The contractor shall pay all
such claims within 15 days of claim failing which the same shall be deducted from the
bills of contractor.
Income Tax shall be deducted from your bills as per IT rules prevailing from time to time.
Successful bidder will have to submit the copy of PAN CARD along with invoice.
5. TERMINATION OF CONTRACT BY GIPCL:
Contractor shall be responsible to complete the jobs within agreed time schedule and
in case contractor fail to complete the job, GIPCL shall recover from his bill, Security
Deposit and / or whatsoever for expenses incurred to complete the job with additional
10% overhead charges.
In case if contractor’s services are not found satisfactory with respect to mobilization,
time bound completion of work, workmanship & safety (OHSAS policy of GIPCL) etc
then GIPCL has right to terminate the contract at any time by giving you 15 days
advance notice without assigning any reason and will make the alternate arrangement
at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages after
giving 15 days advance notice to the contractor if any of the following events occur –
(a) Contractor is adjudged as insolvent.
(b) Contractor has abandoned the contract.
(c) Contractor fails to proceed with the work with due diligence as per requirements of
(d) Contractor has neglected or failed persistently to observe or perform any of the
acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
(e) Contractor repetitively violating the safety norms for more than three incidents.
(f) Any major contradiction of applicable labour laws.
(g) Any major deviations from contractual terms and conditions including quality of
(h) GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG
6. FAILURE & TERMINATION:
(a) If the CONTRACTOR after receipt of written notice from the GIPCL requiring
compliance, with such further drawings and / or the GIPCL instructions fails within
seven days to comply with the same, the GIPCL may employ and pay other
agencies to execute any such work whatsoever as may be necessary to give effect
thereto and all costs incurred in connection therewith shall be recoverable from the
CONTRACTOR by the GIPCL on a certificate by the GIPCL as a debt or may be
deducted by him from any money due or to become due to the CONTRACTOR.
(b) If the contractor fails to execute the work or fails to mobilize the resources, services
and equipments as per directions of GIPCL within the time frame given and/or
violating the GIPCL’s safety rules & regulations, GIPCL shall get the work done by
third party at the risk & cost of the CONTRACTOR with additional 10% overhead
charges of GIPCL and all costs incurred in connection therewith shall be
recoverable from the CONTRACTOR by the GIPCL as a debt or may be deducted
by him from any money due or to become due to the CONTRACTOR.
7. SETTLEMENT OF DISPUTES:
(a) Any disputes or difference of opinion between parties arising out of the contract to
the extent possible shall be settled amicably between the parties. If amicable
settlement cannot be reached all the disputed issues shall be resolved through
arbitration before a Sole Arbitrator appointed by Managing Director, GIPCL
according to the provisions of The Arbitration & Conciliation Act-1996, as amended
from time to time. The place of arbitration shall be at Vadodara/ Surat or any other
place within state of Gujarat.
(b) Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless the
decision of the Arbitration proceedings is obtained.
8. INTERPRETATION OF CLAUSE:
In case of disputes as regards interpretation of any of the clauses or specification, the
decision of Head of Management (HOM)-GIPCL will be final and binding on the
9. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund Act,
Payment of Bonus Act, Labor Law Act, maternity benefit act in respect of employees
engaged by him for the work and shall have to maintain necessary records. In case any
amount becomes due to be payable by him to his employees or to the Government
under the above rules, regulation, Acts.
10. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party
workmen due to any act omission / indiscretion on your part while undertaking the work
and contractor shall fully abide by the statutory requirements of the employee's
compensation act. GIPCL shall not be liable for any compensation due to accident,
death or injury to any of contractor’s workmen or any third party due to negligence, act
or omission on your part.
11. FACILITIES TO BE PROVIDED BY GIPCL:
The Company shall provide the subsidised canteen facility at site.
12. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other
Party in writing of such conditions and the performance shall be suspended as per
mutual agreement.
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control of
the Party and not foreseeable by the Party and shall include events of floods,
explosions, riots, wars, hurricane, epidemics, any other Act of God, quarantine
restrictions, terrorism, government actions and provided always that such acts result in
the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all actions,
proceedings, claims, demands, losses, costs, damages and expenses whatsoever
which may be brought against or suffered by GIPCL which it may sustain, pay or incur
as a result of or in connection with the performance/ purported performance/ non-
performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any direction
or order is issued by court at any point of time the contractor shall comply with and
implement such direction or order whether passed at the time of award of contract or
during the pendency of contract. Further, the Contractor shall indemnify the GIPCL
against all consequences arising and affecting GIPCL owing to the compliance of the
orders by the Contractor.
14. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the Courts
at Baroda/Surat shall have jurisdiction regarding the same.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
Tender No: MAT/MM/TRANSPORT ARC/GIPCL/2025-27
SPECIAL CONDITIONS OF CONTRACT
1. DETAILED SCOPE OF WORK
1.1 The vehicles will be hired on both regular and casual basis to meet the operational
requirements of the organization. Regular hire vehicles will cater to daily and fixed
conveyance needs at the Corporate Office, Vadodara, while casual hire vehicles
will be deployed as required for official visits and project-related assignments at
1.2 Regular Hire.
The details of the required vehicles are provided in the table below:-
Requirement of Vehicles: Regular Basis
Sr. Description Qty. Duty Hours
(a) Diesel – Swift Dzire – AC or equivalent, Capacity- 04 Nos. Ten (10)
(b) Diesel Jeep / Bolero / Ertiga – (Hard Top) AC or 01 No. Twenty four
equivalent, (24) Hours
Capacity- 7Seater
(c) Petrol Ambulance Van AC with Ambulance 01 No. Twenty four
Passing in RC Book For 24 Hours. (24) Hours
1.3 Casual Hire.
The details of the required vehicles are provided in the table below:-
Requirement of Vehicles: Casual Basis
Sr. Description UOM Duty Hours Other Charges
(a) Diesel – Swift Dzire – AC Nos 10 hrs 250 Kms (i) Charges per
or equivalent. Duty) for per day Kms for extra
Capacity- 5 Seater local duty (12 hrs Kms, exceeding
Duty) for 80 Kms.
(b) Diesel Innova ACor Nos outstation
equivalent SUV, Capacity- duty (ii) Detention
7Seater charges per hour
(up to 06 Hrs).
(c) Diesel Maruti Suzuki Nos (iii) Detention
Ertiga AC or equivalent charges for
Capacity-7 Seater hour i.e. Night
1.4 The Bidder shall provide different types of vehicles in good roadworthy condition.. The
following eligibility criteria, shall be applicable during the proposed contract:-
(a) The vehicle provide under the contract, whether for regular or casual (as and
when required) must not be older than one year from the commencement of the
contract period. For example, if the contract starts on 15 April 2026, then the model
of vehicle supplied must have been registered within the last 12 months.
(b) The vehicles shall be provided on a turnkey basis, complete with drivers. The
responsibility for operation, maintenance, and compliance shall rest with the contractor.
All vehicles deployed for both local and outstation duties must have valid taxi permits
issued by the RTO, and the AC Ambulance Van must be ambulance-passed in the
Registration Certificate (RC) Book.
1.5 The vehicle engaged for ten (10) hours should report at 08:30 a.m. sharp for duty at
GIPCL – VADODARA. Office working hours for vehicles will be from 08:30 to 18:30
hours. For duty more than the above prescribed hours, extra payment will be made as
per the agreed rates.
1.6 The Bidder shall increase or decrease No. of vehicles in accordance with the
requirement of GIPCL from time to time.
1.7 The Bidder shall provide petrol/Diesel AC Ambulance Van with Ambulance Passing in
RC Book up to date road-worthy and good condition in all respect with First Aid box,
oxygen cylinder with attachment and stretcher at his own cost.
1.8 The vehicles are to be utilized for transportation of man & materials of GIPCL in local
and / or outstation area.
1.9 In case contractor intends to hire limited vehicle from other party/person, he will have to
produce a power of attorney from owner of the vehicle, and an affidavit from owner duly
attested by a notary public. Authorizing the contractor to ply the vehicle(s) on hire and
covering all liabilities under various central / state / municipal Acts / rules & regulations
1.10 The driver should be educated enough to write the Log Book properly. He shall fill up
the logbook for every trip and shall be required take signature of authorized user /
representative of the Company everyday. If the logbook is incomplete, charges will not
1.11 The condition of the taxies provided shall be up-to-date and in tip-top condition
including facilities such as seat covers, car tape, Air condition unit, spare wheel,
tool kit, wipers etc. The Driver must possess a Mobile Phone in working condition
& the details thereof shall be intimated to the concerned officers well in advance.
Fueling of hired vehicle shall be carried out prior to reporting for duty and there
must be adequate arrangement for fuel-lubricant with the driver of the hired
2. DETAILS OF OPERATION:
2.1 The Bidder shall provide & operate all types of vehicles in a good running condition with
2.2 The Bidder shall operate all vehicles at his own cost with full responsibilities whatsoever,
including fuel, maintenance, RTO taxes, Insurances, interstate permission, charges.
However, toll tax, parking & GST shall be reimbursed by GIPCL at actual on submission
of original paid challan / receipts.
2.3 Vehicles normally shall ply in VADODARA City and outstation trips as may be required
from time to time.
2.4 In case of change in requirement of number of vehicles by GIPCL, the Bidder shall
execute the requirement within twenty four (24) hour’s notice i.e. Bidder shall provide
additional vehicle or withdraw vehicle during this stipulated time.
2.5 The Bidder shall provide casual vehicle as per GIPCL’s requirement for which a booking
will be given by 5.30 p.m. for next working day by GIPCL authorized person.
2.6 Only Sundays as observed by GIPCL will be treated as holiday for the bidder. If, in case,
vehicle/s used on that day, charges as per casual rate will be applicable. These do not
apply to vehicles hired for twenty four (24) hours duty.
2.7 In case of emergency, GIPCL may intimate for vehicles required after office hours by
intimating over contact phone no. given by the Bidder. The Bidder has to give timely
response in such emergency situation.
2.8 The Bidder shall employ drivers having minimum experience of Five years and having
a valid driving license to drive commercial / taxi throughout the period of the contract.
2.9 Contractor will not assign or subcontract the work awarded to them without the
Company’s written permission. Contractor shall ensure that the drivers engaged by
them for driving the taxies are competent, knowledgeable about RTO regulations, holds
appropriate valid license as per rules, the drivers will be co-operative, amicable, clean,
well dressed, well behaved, well mannered (“Standard of Performance”) and shall
promptly carry out instructions given by the representatives or authorized users of the
Company from time to time. In case of any failure on the part of the driver to adhere to
the Standard of Performance and to carry out these instructions, the contractor shall
promptly replace him to the satisfaction of the Company or in case of failure to do so,
Company will be free to engage any other taxi for that day at contractor’s costs and
risks, the contract shall be determined immediately and can become ground for
termination by the Company with no further payment.
2.10 Driver should be sufficiently experienced to drive on highways and city, he must be in
possession of Taxi and driving license while driving. The Contractor shall deploy his
personnel after verifying their credential. Contractor will also issue photo identity card to
2.11 The Bidder shall see that the drivers on duty wear neat & clean clothes / uniform and if
GIPCL finds the services / conduct of the driver unsatisfactory, the Bidder will replace
the driver within forty eight (48) hours as per the advice of GIPCL.
2.12 The Bidder shall assume all liabilities and responsibilities arising out of the act,
commission / omission or negligence on the part of driver and GIPCL will not be liable
at all in these respects. If required by GIPCL, Bidder shall unconditionally and
immediately replace driver/s. The bidder shall indemnify and keep indemnified GIPCL
for any and all such cost, expenses, charges and liabilities incurred or suffered by
GIPCL on account of any such eventuality.
2.13 The Bidder shall ensure that vehicles provided and operated in a battery area should
be fitted with a spark arrestor / safety muffler and PUC certificate etc.
2.14 The Bidder’s drivers shall observe all rules and regulations relating to discipline, safety
and such other norms of GIPCL which are in force from time to time.
2.15 The Bidders shall provide mobile phones of the drivers which shall be in working
condition at all the times.
2.16 The Bidders shall provide water bottle & news paper in all outstation vehicle trips.
Bid Evaluation: Evaluation of qualified price bid shall be done based on rate / total
value of rate of Annexure-IV & Annexure - V.
3. CONTRACT PERIOD
3.1 This rate contract shall be valid for a period of two years i.e. from 15th April,
to 14th April, 2028, and on completion of contract period it will stand as terminated,
however, performance shall be reviewed after three (3) months from the date of award
of the contract. If, the performance is not found satisfactory then the GIPCL shall have
right to terminate the same, otherwise the same shall be continued for a further period
of twenty one (21) months on the same rates, terms and conditions.
3.2 GIPCL reserves the right to extend the contract for further period of three months on the
same terms & conditions after completion of contract period.
3.3 GIPCL also reserve the right to extend the contract for further period of 01 year (after
extension of three months period) with mutually agreed upon by both GIPCL &
3.4 During the currency of the contract or extended period, contract can be terminated by
either party by giving one month notice in writing without assigning any reason
4. TERMS OF PAYMENT
4.1 GIPCL shall pay the bill every months as per agreed rate plus Government taxes
applicable from time to time for providing transport service effectively and efficiently for
the fulfillment of this agreement.
4.2 The Bidder shall submit the bills with original logbook within five (5) working days after
completion of each calendar month and shall be paid within twenty (20) days after
receipt of the bills by GIPCL.
4.3 Vehicle hired for a continuous period of fifteen (15) days or more will be considered as
hired on monthly basis, whereas, if, hired for less than fifteen (15) days, it will be
considered as hired on casual basis and payment for that vehicles will be made
accordingly. Where the vehicle is used / detained for less than half an hour, for the
purpose of calculation of charges, it will be ignored and if it exceeds half an hour, then
one-hour charge shall be payable.
4.4 The Bidder shall maintain a separate logbook for each vehicle provided to GIPCL and
shall make entry of start / close kilometer with time in logbook for every trip undertaken
with the certification of user. Entry of kilometers made into the logbook, but not certified
by the user shall not be admissible for payment.
4.5 The Bidder’s invoicing to be based on total Kms. from GIPCL Office for all vehicles,
reporting directly at GIPCL Office at Vadodara.
4.6 If the vehicle is given duty to pick-up from city, directly before Office hours, the Kms.,
will be accounted from Bidder’s Office to pick up point and back to GIPCL.
4.7 If the vehicle is given duty to release point from GIPCL at the time of closing hours, the
Kms., will be accounted from GIPCL to release point and back to Bidder’s Office.
5. PRICE VARIATION
5.1 The rates quoted by the Bidder shall remain firm throughout the contract period. At
present November – 2025, price of petrol has been considered @ Rs.94.15 per ltr.
& for Diesel @ Rs.89.25 per ltr., for this bid purpose. If the price of petrol / diesel is
increased / decreased, the formula will be based on 1 ltr. of petrol / diesel for over
5.2 The formula is considering fuel average as 1 ltr fuel either petrol / diesel = 14 KM
5.3 The increase / decrease will be given on per kms., basis. For e.g. if the price of diesel /
petrol is increased by 28 paisa per ltr then 28 divided by 14 kms. = 02 paisa per kms.
Price variation will be on actual kms. usage only.
5.4 In case of any liabilities arising to GIPCL on account of default on your part in carrying
out various functions, the same will be deducted while your monthly running bills or
PBG, same shall be recovered by any other legal means available as per the law.
6.1 GST as applicable shall be paid by GIPCL extra at actual basis. Please submit the copy
of GST registration along with invoice.
6.2 Income Tax shall be deducted from your bills as per IT rules prevailing from time to time.
Please submit the copy of PAN Card with your invoice.
7. RIGHT OF REJECTION OF TENDERS:
7.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding process
and reject all Bids at any time prior to award of contract, without thereby incurring any
liability to the affected Bidder or Bidders or any obligation to inform the affected Bidder
or Bidders regarding the same.
7.2 Any Tender without EMD will be treated as non-responsive and shall be rejected at the
outset & no further correspondence shall be entertained regarding this.
7.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if such
Bidder has quoted an abnormally low rate in the Bid document/price Bid.
8.1 Breakdown. In case of breakdown of any vehicle/s or if the vehicle is not found
roadworthy condition than the same shall be replaced by the Bidder within two (02)
hours of time of failure. GIPCL shall impose penalty @ Rs.900/- (Rupees Nine Hundred
Only) per such occasion per vehicle. If, GIPCL incurs any additional expenditure on
account of alternate arrangement for that day, the same shall also be recovered from
the contractor bills / Bidder’s Security Deposit (SD) / monthly pending bills.
8.2 Defect in Service. GIPCL shall deduct from Bidder’s bill Rs.200/- (Rupees Two
Hundred Only) per occasion by way of penalty for any type of error or defect in
providing services.
8.3 Rash or Negligent Driving. GIPCL shall deduct a penalty of Rs 500/- in case
the driver is found to exceed speed limit/rash/negligent driving/willful default of traffic
rules and signals. This shall be accompanied by a written complaint and proof by the
user. The imposition of penalty will be at discretion of HoD Security. GIPCL reserves
the right to terminate the contract in case of repeated offences in this regard.
8.4 Smoking/Use of Tobacco /Gutkha/Alcohol/Intoxicants. Use of intoxicants
including alcohol, tobacco and all its by products is strictly prohibited. Any infringement
would be penalized to a tune of Rs 2000/-, GIPCL reserves the right to terminate the
contract in case of repeated offences in this regard.
9. LEGAL ASPECTS
9.1 The Bidder shall keep all vehicles in operational condition adequately insured, duly
registered with concerned RTO, renew PUC, license valid at all times during the period
of contract. Copies of each document shall be maintained in the vehicle all times and
the same shall be submitted to GIPCL Authorised officer.
9.2 The Bidder shall obtain necessary comprehensive insurance policies for all vehicles in
respect of all the insurable liabilities under the Motor Vehicles Act., the Employees’
Compensation Act (for drivers and conductors), Fatal Accident Act, Personal Injuries
Act., Natural Hazardous, Riots / arson etc and copy of the policy shall be submitted to
GIPCL Authorized officer.
9.3 The Bidder shall at all times indemnify and keep indemnified GIPCL and its Officers,
Servants, Guests and their family members, assignees, heirs and agents against all
third-party claims, whatsoever, including but not limited to property losses / damages,
personal accident, injury or death of persons of any subcontractor and / or servants or
agents of the Bidder and / or damage to property of GIPCL arising out of the use of the
hired vehicles.
9.4 The Bidder shall also obtain necessary license, registrations as may be required under
the applicable laws.
9.5 This being a job contract for providing transportation services, the Bidder shall be the
principal employer for all purpose for drivers, conductors and any other employees
employed by the Bidder for the purpose of providing services under this contract.
9.6 GIPCL shall be entitled to recover full amount with all other consequential cost, charges
and expenses from Bidder, which GIPCL incurs, on account of compliance of any
statutory provision for breach of any terms and condition of the contract.
9.7 The Bidder shall submit a copy of RTO book and insurance policy and each requisite
license and registration certificate with respect to Motor Vehicle Act within one week
time from the award of the contract. The Bidder shall also be responsible to maintain
necessary record & register required as per various acts.
9.8 No employee, agent or sub-agent of the Bidder shall smoke or light anything within the
premises of GIPCL and carry matchbox / lighter or any other explosive and/or
inflammable material inside the Plant. Provisions of this clause shall be observed by the
driver, conductor etc at the time of driving the vehicle. Breach of this condition will be
viewed very seriously by GIPCL and GIPCL can impose penalty or even terminate the
contract on repetition of breach of this condition.
9.9 The Bidder shall issue Identity cards with recent photographs to their employees
engaged by them with instructions that they shall display the Identity Card while on duty
and shall produce the same on demand to GIPCL.
9.10 The Bidder shall not directly or indirectly assign or sub-let total/any part of the contract
to any other party or agency.
10. ADDITIONAL PRE QUALIFICATION CRITERIA
10.1 If Bidder or its Partner(s) or Director(s) is /are/was in any Litigation(s), Court Case(s) or
Arbitration(s), either completed or under progress during last three (03) years or Black
Listed / Deregistered / Stopped or banned from dealing in the past by any Government
of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported companies
/ undertakings / organizations, Bid of that party will be liable to be rejected. Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final and binding
on the Bidder without any demur and that no further correspondence shall be done in
this regard at any stage Section-II / Form attached.
10.2 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of Safety
Laws and Regulations” as amended in Section-I / Form attached.
If any of the details submitted in the prescribed Annexure / Form to the Bid is/are found
to be false, incorrect at any time in future, then the Contract awarded to that Bidder /
Contractor shall be liable to be terminated forthwith without any notice / correspondence
and Bidder agrees and undertakes to accept decision of GIPCL in this regards as final
and binding on the Bidder without any demur and that no further correspondence shall
be done in this regard at any stage. Further, Performance / Security Deposit will also be
liable to be forfeited. Any dues to GIPCL from the Bidder / Contractor shall be recovered
from the pending bills or any other dues payable to the Bidder / Contractor, if any or
otherwise through any other recourse available under the Laws.
11. STATUTORY REQUIREMENTS
11.1 The Bidder shall be fully responsible against any accident / injury to or death of their
personnel while on duty working whether in premises of GIPCL or outside GIPCL shall
not be responsible or liable for any such accident / injury / death either in terms of
compensation or any other form of liability. The Bidder shall meet with all other statutory
requirements & regulations as per existing laws.
12.1 The Bidder shall be liable in respect of any demand or compensation payable by Law
in respect of consequences of any accident or injury to any workman or other person
employed & shall indemnify and keep indemnified GIPCL against all such damage,
compensation against all claims.
12.2 GIPCL shall not be liable for any compensation payable by Law in respect of any
demand, any accident or injury to contractor’s workman / representative.
12.3 In case of any liability arise to GIPCL, on account of failure on the part of contractor; the
same shall be adjusted from contractor’s due payment.
13.1 The Bidder representative will visit to GIPCL premises everyday to check performance
& will report to GIPCL Authorized Officer.
13.2 The Bidder’s Sr. Executive shall visit GIPCL periodically to review performance and get
feedback from Authorized Officer of GIPCL.
13.3 GIPCL reserves the right to inspect at any times the books and record maintained by
the contractor under this contract.
14. SAFETY CLAUSE
14.1 The Bidder shall observe all the safety and security rules and regulation of GIPCL which
are at present in force and which may come into force during the pendency of the
contract. Any violation of any rules and regulations will entail penalty and in case of
grave violation of the terms of this contract, GIPCL may exercise the option of
termination of the contract.
14.2 The Bidder employees shall not damage any property of GIPCL. The contractor agrees
and undertakes that in case of default the damages as assessed by the Authorized
Officer of GIPCL, whose assessment shall be final and binding to the Bidder and the
same amount shall be recovered from the Bidder.
15. UNDERTAKING
I have thoroughly read and understood tender notice for ARC of transport for GIPCL –
VADODARA. I fully endorsed all aspects of this tender notice and hereby undertake to
confirm these provisions in the letter in spirit.
Place: Name & Designation of Officer Seal
Name of Authorized persons: ________________________________
GUJARAT INDUSTRIES POWER COMPANY LIMITED
ANNEXURE- IV for SCHEDULE OF RATE FOR OUR REGULAR
Sr. Item Description Estimated UOM Unit Total Total Amount
Sr. Item Description Estimated UOM Unit Total Total Amount
No.s Qty.In Rate Amount In Rs. Yearly
Monthly Monthly
1 Diesel Swift Dzire – AC or equivalent Sedan, 5-
Seater – with AC up to 1500 Kms per Month (10 4 Nos.
hours Duty) for local duty 39371 157484
1a Charges per Kms for extra Kms, exceeding
1b Detention charges per Hr. (up to 6 hrs.) beyond Per
18:30 hours hours
1c Detention charges for exceeding 06 hour i.e. Night Night
2 Diesel Jeep / Bolero / Ertiga – (Hard Top) AC or
equivalent SUV,
Capacity- 7Seater- Charges per month for utilization
upto 1500 kms ( 10 hours Duty) for local duty 53152 53152
2a Charges per KM for extra kms. Exceeding 1500 kms 250 Kms 15.75 3937.5
3 Petrol Ambulance Van - AC with Ambulance
passing in RC book For 24 hours - Minimum
Charges per month 1 Nos.
up to 500 kms & 24 hours 38978 38978
3a Charges per KM for extra kms. Exceeding 500 kms 20 Kms 0.98 19.6
Total Estimated amount for a year without GST
Total Estimated amount for two year without GST
GST will be paid on actual amount payable by GIPCL.
Penalty as per decision of the controlling office of the company will be imposed for each
occasion of noncompliance / fault.
Rates quoted should be firm & final (except fuel price variation). Above rates derived
with unit rate of Petrol Rs 94.15 per liter and Diesel Rs 89.25 per liter.
Place: Name & Designation of Officer Seal
GUJARAT INDUSTRIES POWER COMPANY LIMITED
ANNEXURE- V for SCHEDULE OF RATE FOR OUR CASUAL BASIS
Sr. Item Description Qty.In UOM Unit Total Total Amount
Sr. Item Description Qty.In UOM Unit Total Total Amount
No. Nos Rate Amount In In Rs. Yearly
1 Diesel Swift Dzire – AC or equivalent Sedan, 5-
Seater – with AC up to 80 Kms per day (10 hours Nos.
Duty) for local duty 2657.58 26575.8
1a Diesel Swift Dzire – AC or equivalent Sedan, 5-
Seater – with AC up to 250 Kms per day (12 hours Nos.
Duty) for outstation duty 3366.27 84156.75
1b Charges per Kms for extra Kms, exceeding Kms
(80 Kms or 250 Kms)
1c Detention charges per hour (up to 06 Hours) 20 Per
1d Detention charges for exceeding 06 hour i.e. Night 10 Night
halt Halt 246.07 2460.7
2 Diesel Innova or equivalent SUV, 7-Seater with
AC up to 80 Kms per day (10 hours duty) for local Nos.
2a Diesel Innova or equivalent SUV 7-Seater – with
AC up to 250 Kms per day (12 hours Duty) for Nos.
outstation duty 5610.45 28052.25
2b Charges per Kms for extra Kms, exceeding Kms
(80 Kms or 250 Kms)
2c Detention charges per hour (up to 06 Hours) 10 Per
2d Detention charges for exceeding 06 hour i.e. Night 05 Night
halt Halt 295.29 1476.45
3 Diesel Maruti Suzuki Ertiga or equivalent MUV
7 Seater with AC up to 80 Kms per day (10 hours Nos.
Duty) for local duty 2952.87 5905.74
3a Diesel Maruti Suzuki Ertiga or equivalent MUV
7 Seater with AC up to 250 Kms per day (12 hours Nos.
Duty) for outstation duty 5118.31 51183.1
3b Charges per Kms for extra Kms, exceeding Kms
(80 Kms or 250 Kms)
3c Detention charges per hour (up to 06 Hours) 10 Per
3d Detention charges for exceeding 06 hour i.e. Night 5 Night
halt Halt 295.29 1476.45
Total Estimated amount for a year without GST
Total Estimated amount for two year without GST
NOTE: Above Vehicle Required on Casual Basis (As and When required). GST will be paid
on actual amount payable by GIPCL
Place: Name & Designation of Officer Seal
GUJARAT INDUSTRIES POWER COMPANY LIMITED
APPLICABLE GST TAX SLAB BID:
SR. NO. DESCRIPTION APPLICABLE GST
1 ANNEXURE-IV FOR SCHEDULE OF RATE FOR
REGULAR REQUIREMENT
2 ANNEXURE-V SCHEDULE OF RATE FOR CASUAL
Kindly note that all bidders shall mention specifically GST rate applicable in the above-
mentioned Annexure. GIPCL may consider GST as inclusive if they do not mention / left
blank GST column as herein above.
Place: Name & Designation of Officer Seal
PROFORMA FOR CONTRACT TRANSPORT-CUM-PERFORMANCE
GUARANTEE BY SELLER / CONTRACTOR.
(To be executed on non-judicial stamped paper of approximate value)
To be executed on non-judicial stamped paper of approximate value)
B.G. No. Date :
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO:
A N O L I , Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred to
as “The company / Owner” w h i c h expressions shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns) has
entered into a contract with M/s ………………………………../ hasplaced as
purchase order on M/s …………………………. hereinafter referred to as
“Contractor(s) / Seller(s)” which expression shall u n l e s s repugnant to the
subject or context includes their legal representatives, successors and assigns)
for ……………………………. on the terms and conditions as set out inter alia,
in the Company’s contract No./ P.O.No.…………..date …………and various
documents forming part thereof hereinafter referred to as the “said
contract” which expression include all amendments, modifications and/ or variations
thereto and where as the Contractor(s)/ Seller(s) has agreed for due
execution of the entire contract and guarantees its performance including any
parts executed through any other agencies/ subcontractors AND WHERE AS one
of the conditions of the “said contract” is that “contractor(s)/seller(s) shall furnish
to the owner a Bank Guarantee from a bank for ….% (……….percent) of the total
value of the “said contract” against due and faithful performance of the “said
contract” including performance guarantee obligations of the
contractor(s)/seller(s)for execution/ supplies made under the “said contract.
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating that
in the opinion of the Company, which is final & binding, the amount claimed
is due by reason of default made by the Contractor(s)/ Seller(s) in performing any
of the terms & conditions of the said Contract including defect liability obligations,
in fulfilling the performance guarantee obligation or loss or damage caused to or
would be caused to or suffered by the Company by reason of any breach by the
said Contractor (s)/ Seller(s) of any of the terms & conditions of the contract. Any
such demand made on the Bank by the owner shall be conclusive as regards the
amount due and payable by the Bank under this guarantee. However our liability
under this guarantee shall be restricted to
Rs.……………….(Rupees………………………only).
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s)/ Seller(s) in any
suit or proceeding pending before any office, court or tribunal relating thereto our
liability under this present guarantee being absolute and unequivocal. The payment
so made by us under this bond shall be a valid discharge of our liability for
payment there under. Our liability to pay is not dependent or conditional on the owner
proceeding against the Contractor(s)/ Seller(s).
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution orchange of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all respect
and for all purposes be binding and operative until payment of all money due or
liabilities under the said contract(s)/ Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power Company
Limited (GIPCL) that Gujarat Industries Power Company Limited (GIPCL) shall be at
liberty, without the Bank’s consent and without affecting in any manner the Bank’s
obligation under this Guarantee, from time to time, to:
a) Vary and / or modify any of the terms and conditions of the Agreement.
b) Extend and / or postpone the time for performance of the obligations of the
Contractor under the Agreement.
c) Forbear or enforce any of the rights exercisable by Gujarat Industries Power
Company Limited (GIPCL) against the Contractor under the terms and
conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any
other security held by Gujarat Industries Power Company Limited (GIPCL) to secure
the performance of the obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge
the Bank from liability hereunder, shall have any effect and the Bank hereby waives
any right it may have to apply such law, so that in all respects its liability hereunder
shall be irrevocable and, except as stated herein, unconditional in all respects.
8. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the OWNER/PURCHASER
and further agrees that if this guarantee is extended for a period as mutually agreed
between bidder & owner/purchaser, the guarantee shall be valid for a period so
extended provided that a written request for such extension is received before the
expiry of validity of guarantee.
9. W e ……………Bank further agree with the Company that the company shall have
the fullest liberty without our consent and without affecting in any manner our
obligations hereunder to vary any of the terms and conditions of the said
Contract(s)/ Order(s) or to extend the time of performance by the said Contractor(s)
Seller(s) from time to time or to postpone for any time or from time to time any of
the powers exercisable by the Company against the said Contractor(s)/ Seller(s)
and to forbear or enforce any of the terms and conditions relating to the said
Contract(s)/ Order(s) and we shall not be relieved from our liability by reason of
any such variation, or extension being granted to the said Contractor (s) /
Seller(s) or for any forbearance, act or omission on the part of the Company
or any indulgence by the Company to the said Contractor(s)/ Seller(s) or by any
such matter or thing whatsoever which under the law relating to sureties would, but
for this provision, have affect of so relieving us.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force till..……..Unless
a demand or claim under this Guarantee is made on us within three months from
the date of expiry we shall be discharged from all the liabilities under this
Date………. ………………………….Bank
Corporate Seal of the Bank By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Note: BGs to be furnished from any of the banks listed at Annexure -VI of Volume I.
PROFORMA FOR EARNEST MONEY DEPOSIT – (EMD)
(To be executed on non-judicial stamped paper of appropriate value)
B.G. No. Date :
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate
Office at PO: R A N O L I , Dist.Vadodara – 391 350, Gujarat State, India (hereinafter called
“The Company Owner” which expression shall unless repugnant to the subject or
context includes its legal representatives, successors and assigns) has issued tender
---------- (hereinafter called “the said tender”) to M/s.
……………………………(hereinafter called the said Tenderer(s)” which expression shall
unless repugnant to the subject or context includes their legal representatives, successors
and assigns and as per terms and conditions of the said tender, the
tenderer shall submit a Bank guarantee for Rs.………. (Rupees
……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this guarantee without
any demur, merely on a demand from the Company stating that in the opinion of the
company which is final and binding, the amount claimed
is due because of any withdrawal of the tender or any material alteration to the
tender after the opening of the tender by way of any loss or damage caused to or would be
caused or suffered by the Company by reason of any breach by the said tenderer(s) of any
of the terms and conditions contained in the said tender or failure to accept the letter
of Intent Agreement or that the amount covered
under this Guarantee is forfeited. Any such demand made on the Bank by the owner shall
be conclusive as regards the amount due and payable by the Bank under this guarantee,
However, our liability under this guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the tenderer (s) in any suit or proceeding
pending before any office, court or tribunal relating thereto our liability under this present
guarantee being absolute and unequivocal. The payment so made by us under this bond shall
be a valid discharge of our liability for payment there under. Our liability to pay is not
dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of constitution or
insolvency of the said tenderer(s) but shall in all respect and for all purposes be binding
and operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power Company Limited
(GIPCL) that Gujarat Industries Power Company Limited (GIPCL) shall be at liberty, without the
Bank’s consent and without affecting in any manner the Bank’s obligation under this Guarantee,
from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor
under the Agreement.
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company Limited
(GIPCL) against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any other
security held by Gujarat Industries Power Company Limited (GIPCL) to secure the performance
of the obligations of the Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge
the Bank from liability hereunder, shall have any effect and the Bank hereby waives any right it
may have to apply such law, so that in all respects its liability hereunder shall be irrevocable and,
except as stated herein, unconditional in all respects.
8. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the finalization
of the said tender and that it shall continue to be enforceable till the said tender is finally
decided and order placed on the successful tenderer(s) and or till all the dues of the
company under or by virtue of the said tender have been fully paid and its claims satisfied or
discharged or till a duly authorized officer of the company certifies that the terms and
conditions of the said tender have been fully and properly carried out by the said tenderer (s)
and accordingly discharges the guarantee.
9. That the Owner Company will have full liberty without reference to us and
without affecting this guarantee to postpone for any time or from time to time the exercise of
any of the power of the owner under the tender.
10. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of Bid).
Bank Corporate Seal of the Bank By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Note: BGs to be furnished from any of the banks listed at Annexure- VI of Volume I.
LIST OF BANKS FOR EMD AND BANK GUARANTEE
1. All Nationalized Banks
5. Kotak Mahindra Bank
6. IndusInd Bank
9. Federal Bank
10. Bandhan Bank
11. Standard Chartered Bank
PERFORMA CERTIFICATE
(No claim, No arbitration)
General Manager (M&C)
Gujarat Industries Power Company Limited,
P.O. Ranoli – 391
Dist. Vadodara - Gujarat.
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We
accept this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract
and extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will
not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items
certified in the bills.
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the
works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out
above referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the
statutory requirements. We hereby indemnify GIPCL from any disputes arising in
future related to payment of labours, Provident Fund, etc.. and confirm that all
liabilities of settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
DOCUMENTS FOR PRE-QUALIFICATION BID FOR ARC OF TRANSPORT– GIPCL
01 Name of TRANSPORT Agency / Bidder
& Location of Registered / Head Office.
02 Local Office in Baroda city with Address,
Telephone Nos. and Mobile No. is must.
03 Name of the Proprietor with contact No.
04 Date & Place of Registration of
Agency / Bidder (with supporting
(Minimum Five Years experience)
05 PAN NO. (with supporting
06 GST Certificate (with supporting
07 The Police Clearance Certificate for the
08 Annual Turnover *
(Please attach latest copy of Appendix-
A) Minimum average turnover to be
approx. Rs. One Crores.
09 Total number of Branches in Gujarat. As
well as in India.
10 Work order and Performance
certificates from three different Clients.
11 Present List of servicing clients details
as per attached format.
12 Any other additional information’s.
13 Deviation sheet, if any deviation is taken
to the conditions of Tender documents.
(If any deviation is not taken than also
attached deviation sheet indicating NO
• Copy of Audited A/c’s must be attached.
Date: Name & Signature of Bidder & official seal
LIST OF CLIENTS
NAME & LOCATION OF CLIENTS TRANSPORT PERIOD
No. NAME OF HOD
WITH PHONE NUMBER
REGULAR CASUAL FROM TO
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm, agree
and undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies
shall be strictly followed for all types of works at the site during the period of the Contract, if awarded to
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that I
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the last three(
03) years. There are no ongoing/pending legal matter(s) with any of the Govt. of Gujarat Undertakings /
GoG supported Companies, including GIPCL.
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. / Authorities
and Govt. of Gujarat supported companies / undertakings / organizations for the last three( 03) years.
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard
shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
DEVIATION SHEET
Schedule of Deviation from Technical Specification and Commercial Terms
All the deviations from the terms & conditions of contract shall be filled by BIDDER clause by
clause in this schedule.
Sr. No.s SECTION CLAUSE NOS. AS PER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s
Tender enquiry. The bidder further confirms that in the events any other data and information
presented in the BIDDER’s proposal and accompanying documents are at variance with
specific requirements laid out in the OWNER’s Tender Document, then the latter shall govern
and will be binding on the BIDDER for quoted price.
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide
No.s information here.
a. Registered Office Address
b. Address for correspondence.
c. E – mail ID:
Contact Details
Contact Person Name
Year of establishment
SIGNATURE …………………
DESIGNATION ……………..
(On bidder’s Firm’s Letter Head)
I / We ______________________________________________ authorized signatory of
M/s _____________________________________ here by certify that M/s
_________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender for the work of
Biannual Rate Contract for running of Industrial Canteen at the Plant premises located
at GIPCL, AT & POST: PETROCHEMICALS, DIST: VADODARA - 391
Seal of the Firm Signature of the Bidder
With Designation
(On bidder’s Firm’s Letter Head)
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm, agree
and undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall
be strictly followed for all types of works at GIPCL site during the period of the Contract, if awarded to me.
Further, I ……..Name of Party/Company…… also hereby confirm, declare and undertake that there has
not been any major Safety Violation and any single Fatal Accident at any site(s) during the execution of
the contract/contracts awarded to me during the period of preceding Three years.
Signed and Stamped by the
Authorized Signatory
(On bidder’s Firm’s Letter Head)
Declaration for Contractual Disputes/ Litigations
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that I/We
have not been engaged in any Industrial Dispute(S) or have invoked legal recourse e.g. Arbitration and/or
litigation against any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations for the last Five (05) years. There are no ongoing/pending legal
matter(s) with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including GIPCL.
I/We also confirm that M/s …………….. ……. Have not been Blacklisted/ deregistered / listed under stop
Deal by any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported companies
/ undertakings / organizations , including GIPCL for the last Five (05) years.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard
shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
(On bidder’s Firm’s Letter Head)
of M/s _____________________________________ here by certify that M/s
_________________________________________ has not been black listed,
deregistered as under by any Government / Semi Government / Public Sector
Undertaking / Private sector in last Five years.
Seal of the Firm Signature of the Bidder
With Designation
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of EMD/SD, Advance for Ash, Advance for DM
(The link is visible as horizontal highlighted in “orange” shade below Tenders - News & Update
3. After clicking the link the new page will open. On this page, No need to enter User Name and
Password. Directly click on “Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will be self-
explanatory. It is desired that all the information may be filled correctly so that the payment
made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and then
proceed. E.g. some information like Party code is not available to vendor or GST No. not available
Optional Note: Although mentioned as above can be proceeded with “Not available”, It will be
appreciated that regular vendors may obtain the party code from Materials Dept. or Concerned
Person, so that the vendor can be identified. The same party code may be used for future
transactions also.
After entering the details, click on SUBMIT Button.
5. The vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway, the
charges* as below will be applicable, which has to be borne by Vendor/Party making the
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
GUJARAT INDUSTRIES POWER COMPANY LIMITED
PO: PETROCHEMICAL, DIST: BARODA –
Reference PO Number Date:
Integrity Pact No. : Contract Period
To create an environment where Business Confidence is built through best business practices and
Is fostered in an atmosphere of trust and respect between providers of goods and services and their
users for the benefit of stakeholder, society and the nation.
GIPCL'S COMMITMENT PARTY'S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure / recommendation from
business and professions outside GIPCL to influence its decision.
To ensure maximum transparency to the Not to use intimidation, threat, inducement or
Satisfaction of all stakeholders. pressure of any kind on GIPCL or any of it's
To fulfill the terms of agreement / contract and to To be prompt and reasonable in fulfilling the
consider objectively the viewpoints of other contract, agreement and legal obligations.
To ensure regular and timely release of To provide goods and / or services timely as
payments for works done/services provided per agreed quality and specifications.
To ensure that no improper demand is made by To maintain the general discipline in our
Employees or by anyone on our behalf. dealings and transactions.
To give maximum possible assistance to all the To be truthful and honest in furnishing
Vendors / Suppliers / Service Provider and others information.
to enable them to complete the works in time.
To provide all necessary information to suppliers Not to divulge to others any information,
/ contractors relating to contract / job to facilitate business details about GIPCL made available
them to complete the contract / job successfully during the course of business relationship
in time. without the written consent of GIPCL.
To ensure that no hurdles are caused to vendors Not to enter into cartel / understanding
/ suppliers / contractors in execution of whether formal or informal so as to influence
agreement / contract / work . the price.
Seal & Signature Seal & Signature
(GIPCL's Authorized Signatory) (Party's Authorized Signatory)
Designation : Designation :
(Note: It is voluntary on the part of the second party to sign the Ethics Pact, but efforts are made by GIPCL
Management to convince it to sign the same. For this purpose, the second party (i.e.
Contractor / vendor / supplier / service provider) is at liberty to suggest changes in the contents of the
Ethics Pact to suit its comfort level.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER DOCUMENT-VEHICLE HIRING.pdf
SCHEDULE OF RATE(SoR).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .