| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-AOC | ₹3.0 L Quoted ₹3.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.2 LRejected-AOC | ₹3.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JOHNY YOHANNAN L2 | Johny K P L1 |
|---|---|---|---|---|---|
| 1.00Maintenance | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6,428.5 | sqm | 21.1 ₹1.4 L | 19.99 ₹1.3 L |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 2 | hour | 400.42 ₹800.84 | 379.36 ₹758.72 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 36 | sqm | 155.66 ₹5,603.76 | 147.47 ₹5,308.92 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 3 | each | 638.93 ₹1,916.79 | 605.33 ₹1,815.99 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 6 | each | 1,066.14 ₹6,396.84 | 1,010.08 ₹6,060.48 |
| 1.01 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 15 | each | 438.07 ₹6,571.05 | 415.04 ₹6,225.60 |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 10 | each | 784.14 ₹7,841.40 | 742.9 ₹7,429 |
| 1.01 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | 5,000 | Litre | 0.59 ₹2,950 | 0.56 ₹2,800 |
| 1.01 | OD51073/2025-2026:Cleaning septic tank including removing RCC covering slab and cleaning the night soil to
another area,replacing the sewer line rectification RCC slab cleaning the surroundings | 9 | cum | 4,911.81 ₹44,206.29 | 4,653.52 ₹41,881.68 |
Tender Value
₹2.8 L
EMD Value
₹6,985
Closing Date
14 Oct 2025, 2:00 pmClosed
Assistant Executive Engineer
O/O Assistant Executive Engineer PWD Buildings sub division Munnar
GENERAL-Pre-monsoon for office Building 2025-2026-Pre-monsoon for office Buildings under PWD Building Section Adimali 2025-2026-General Civil Work
2025_PWD_805860_1
PWD/BLDG/TR/10198/2025_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Adimali
Please refer Tender documents.
12 documents required · 12 mandatory
₹620
₹6,985
5 Feb 2026
6 Oct 2025
16 Oct 2025
6 Oct 2025
14 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1341899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid