| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | ₹9.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11.6 LRejected-Finance | ₹11.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹11.6 LRejected-Finance | ₹11.6 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.7 L
EMD Value
₹28,000
Closing Date
15 Apr 2026, 5:00 pmClosed
GM-(CIVIL)
Main Administrative Building Sector-6 Noida
D/o Village (C/o Girls Toilet in Primary School and C/o Kitchen in Junior High School in Village Wazidpur) Noida
2026_NOIDA_1132193_1
18/DGM(C)/SM-WC-09/ET/2025-26
Open Tender
Civil Works
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,416
NOIDA
₹28,000
13 May 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
15 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect diffrent utilities like sewar line ,Water supply line ,Electric cable,Telephone cable, Gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of engineer in charge All kinds of soil. | - | cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (Zone-III) drived from natural sources : 8 graded stone aggregate 40 mm nominal size drived from natural sources). | - | cum | - | - | |
Brick work with Common Brunt clay F.P.S( Non-modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement :4 coarse sand) | - | cum | - | - | |
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | - | cum | - | - | |
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level | - | cum | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - | |
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Kms, from the site of work and including watering, dressing etc. labour and T&P etc. required for the proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a distance of 50 M. out side the periphery of area cleared. | - | cum | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete. | - | sqm | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform. | - | sqm | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumers and cantilevers. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD.pdf
Tender Documents • 5.08 MB
BOQ_2112993.xls
BOQ • 0.30 MB
Capability.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid