Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
18 Jun 2026, 5:00 pmClosed
VDO
Digod
Suraksha Diwar Nirman Karya Paalwal Sati Mata Mandir ke Samne Digod
2026_PRD_567211_2
ZKT2627WSOB00221
Open Tender
Civil Works
Percentage
365 days
GP Digod
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDRISL
₹6,000
14 Jul 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of soil up to a depth of 1.5 meters for foundations, trenches, or drains; ramming the bed; watering; dressing sides; removing excavated soil; backfilling voids after foundation work; and disposing of surplus soil up to a distance of 50 meters (applicable for hard, clayey, or gravelly soil). (Item No. 2b) | - | cum | 178.46 | - |
| 2 | Laying cement concrete (1:4:8 mix) for road foundations, including the use of needle and surface vibrators; mixing with 40mm crushed stone aggregate; and finishing to the required grade, camber, and super-elevation. Note: If hand-broken aggregate is used instead of 40mm machine-crushed stone aggregate, the same quantity will be paid for, but the rate will be reduced by 30%. (Item No. 10a) | 1 | cum | 3,582.8 | ₹3,579.22 |
| 3 | Supply and placement of Reinforced Cement Concrete (RCC) of 1:1.5:3 mix for roof slabs, chhajjas (sunshades), beams, lintels, etc.; including compacting, curing, and finishing the surface with 1:3 cement mortar; and including scaffolding (but excluding the cost of steel and shuttering). (Item No. 13b) | 1 | cum | 5,539.8 | ₹5,534.26 |
| 4 | Providing and fixing centering and shuttering (formwork) for RCC roofs, slabs, chhajjas, lintels, etc., up to a height of 4.5 meters, and subsequent removal, in accordance with specifications (using steel shuttering). (Item No. 93b) | - | sqm | 216.3 | - |
| 5 | Cutting, bending, placing, and tying reinforcement steel for RCC work, including supply of material. (Item No. 61) | - | kg | 85.92 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.23 MB
Tendernotice_2.pdf
PDF • 10.18 MB
BOQ_1008960.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .