Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹47,315 (10.1%)Rejected-AOC CHAIGARIA MAHARANI UDAIPUR GOMATI DISTRICT 7005576239 | 700557 | ₹5.1 L+₹47,315 (10.1%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.3 L
EMD Value
₹10,609
Closing Date
10 Jul 2026, 3:00 pmClosed
Executive Engineer, Div-II, AMC
O/O the Executive Engineer, Div-II, AMC
Construction of pucca drain starting from H.O Tarasangkar Debbarma to main road at Marak Para near Kalimandir, under ward no.06, AMC
2026_SAMC_74285_1
10/Div-II/AMC/2026-27
Open Tender
Civil Works
Percentage
60 days
Under ward no -06, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹10,609
2 Sept 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil | - | Cum | 231.6 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 3 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick
aggregate 20 mm nominal size) | 6 | Cum | 9,938.6 | ₹59,631.6 |
| 4 | First class brick work in foundation and plinth
including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ) | - | Cum | 9,845.2 | - |
| 5 | 12 mm cement plaster of mix in/cl. Neat cement punning. In Cement mortar 1:4 (1 cement : 4 fine sand) | 138 | Sqm | 281 | ₹38,778 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns etc. for mass concrete with steel formwork | 36 | Sqm | 401.2 | ₹14,443.2 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 742.5 | Kg | 103.9 | ₹77,145.75 |
| 8 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 6.75 | Cum | 12,073.8 | ₹81,498.15 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_75603.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
DNIet10.pdf
Tender Documents • 2.81 MB
BOQ_75603.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .