Tender Value
₹5.9 Cr
EMD Value
₹3 L
Closing Date
21 May 2026, 4:00 pmClosed
Additional Chief Engineer (P&C)
Design, Engineering, Manufacturing, Supply, Erection, Testing & commissioning of 01 Nos. of 220/66kv Transformer Bays at 220kv Dahej ss and 01 No of 220/66kv Transformer Bay at 220kv Zagadiya ss Under Bharuch Tr. circle on EPC basis excluding Civil works
297977
ACE(P&C)/Contract/TR bays Dahej & Zagadiya/E-424
Open
Electrical Works
Works
Vadodara
34 documents required · 29 mandatory · 5 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹3 L
1 May 2026
1 May 2026
1 May 2026
21 May 2026
1 May 2026
Seal & Signature of Bidder
CLAUSE TITLE PAGE
TENDER SPECIFICATION NUMBER
NOTICE INVITED TENDER
[I] GENERAL CONDITION OF CONTRACT (GCC)
1 GENERAL PARTICULARS
2 SCOPE OF THE PROPOSAL AND WORK
3 BIDDING COSTS
4 DETAILS OF DOCUMENTS
5 KNOWING THE BID DOCUMENTS
6 CLARIFICATIONS ON BID DOCUMENTS
7 AMENDMENT OF BIDDING DOCUMENT
8 LANGUAGE OF BID
9 LOCAL CONDITIONS
10 DOCUMENTS COMPRISING THE BID
12 BID SECURITY/EMD
13 FORMAT OF BID
25 SIGNATURE OF BIDS
15 SEALING AND MARKING OF BIDS
16 DEADLINE FOR SUBMISSION OF BIDS
18 MODIFICATION AND WITHDRAWAL OF BIDS
19 INFORMATION REQUIRED WITH THE PROPOSAL
20 OPENING OF BIDS BY OWNER
21 PURPOSE OF EVALUATION OF BIDS
22 POLICY FOR BIDS UNDER CONSIDERATION
23 PRELIMINARY EXAMINATION
Seal & Signature of Bidder
24 AWARD CRITERIA
25 OWNER’S RIGHT TO ACCEPT ANY BID AND TO REJECT
ANY OR ALL BIDS
26 NOTIFICATION OF AWARD
27 SIGNING OF CONTRACT
28 DEFINITION OF TERMS
31 LANGUAGE AND MEASURES
33 TAXES AND DUTIES
34 TAXES, PERMITS & LICENCES
35 PRICE INCLUSIONS (INCLUDING TAXES & DUTIES)
36 CONTRACT PERFORMANCE GUARANTEE
38 PERFORMANCE GUARANTEE
39 TIME SCHEDULE
40 TIME – THE ESSENCE OF CONTRACT
41 PENALTY FOR DELAY
42 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
43 PRESENTATION OF BILLS
45 PAYMENT SCHEDULE
46 DEDUCTIONS FROM CONTRACT PRICE
47 TERMS OF PAYMENT
48 TAKING DELIVERY AND INSURANCE
50 CONTRACT QUALITY ASSURANCE
51 ERECTION TOOLS AND TACKLES
53 CONTRACT DOCUMENTS
54 USE OF CONTRACT DOCUMENTS AND INFORMATION
Seal & Signature of Bidder
55 CONSTRUCTION OF THE CONTRACT
56 JURISDICTION OF CONTRACT
57 EXECUTION OF CONTRACT
58 ENFORCEMENT OF TERMS
59 COMPLETION OF CONTRACT
60 REPLACEMENT OF DEFECTIVE PARTS AND
61 PATENT RIGHTS AND ROYALTIES
62 DEFENCE OF SUITS
63 LIMITATION OF LIABILITIES
64 ENGINEER’S DECISION
65 POWER TO VARY OR OMIT WORK
66 ASSIGNMENT AND SUB-LE TTING OF CONTRACT
67 CHANGE OF QUANTITY
68 PACKING, FORWARDING AND SHIPMENT
69 COOPERATION WITH OTHER CONTRACTORS AND
CONSULTING ENGINEERS
70 NO WAIVER OF RIGHTS
71 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND
LIABILITY OF THE CONTRACTOR
72 PROGRESS REPORTS
74 RISK DISTRIBUTION-TRANSFER OF TITLE
75 LIABILITY FOR ACCIDENTS AND DAMAGES
76 DEMURRAGE, WHARFAGE, ETC
77 FORCE MAJEURE
78 SUSPENSION OF WORK
79 CONTRACTOR`S DE FAULT
80 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
81 FRUSTRATION OF CONTRACT
82 GRAFTS AND COMMISSIONS ETC.
83 SETTLEMENT OF DISPUTES
Seal & Signature of Bidder
85 RECONCILIATION OF ACCOUNTS
87 TERMINATION OF CONTRACT
88 TO CANCEL THE CONTRACT
89 MATCHING END COST
90 VENDOR REGISTRATION
GENERAL INFORMATION (TECHNICAL)
1 GENERAL INFORMATION (TECHNICAL)
2 INSPECTION AND TESTING OF EQUIPMENT
3 OTHER CONDITIONS
[II] ERECTION CONDITIONS OF CONTRACT
2 REGULATION OF LOCAL AUTHORITIES AND STATUTES
3 OWNER’S LIEN ON EQUIPMENT
4 ACCESS TO SITE AND WORKS ON SITE
5 CONTRACTOR’S SITE ESTABLISHMENT
6 CO-OPERATION WITH OTHER CONTRACTORS
7 DISCIPLINE OF WORKMEN
8 CONTRACTOR’S FIELD OPERATION
9 PROGRESS REPORT
10 MAN-POWER REPORT
11 PROTECTION OF WORK
12 EMPLOYMENT OF LABOUR
13 FACILITIES TO BE PROVIDED BY THE OWNER
14 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
15 LINES AND GRADES
16 FIRE PROTECTION
Seal & Signature of Bidder
18 PRE-COMMISSIONING TRIALS AND INITIAL
19 MATERIALS HANDLING AND STORAGE
20 CONSTRUCTION MANAGEMENT
21 FIELD OFFICE RECORDS
22 CONTRACTOR’S MATERIALS BROUGHT TO SITE
23 PROTECTION OF PROPERTY AND CONTRACTOR’S
25 UNFAVOURABLE WORKING CONDITIONS
26 PROTECTION OF MONUMENTS AND REFERENCE
27 WORK & SAFETY REGULATIONS
28 CODE REQUIREMENTS
Seal & Signature of Bidder
CLAUSE NO. TITLE PAGE
[III] SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL PARTICULARS
3 EARNEST MONEY DEPOSIT (EMD)
4 DECLARATION BY BIDDER
5 QUALIFYING REQUIREMENT
6 ADDITIONAL DOCUMENTS
7 COMPLETION PERIOD
8 INSTRUCTIONS BEFORE SUBMITTING YOUR BID.
9 ADDENDUM TO THE TECHNICAL SPECIFICATIONS.
10 SPECIAL NOTES
12 PROGRESS REPORT
13 BIDDERS RESPONSIBILITY
15 CLARIFICATION
19 SD CUM PERFORMANCE GAURANTEE DEPOSIT 88 to
21 CERTIFICATE FOR TECH COMPLIANCES
23 CONTRACT AGREEMENT
24 BANK GUARANTEE FOR EMD
25 PERFORMANCE BANK GUARANTEE
26 FORM OF BANKER’S UNDERTAKING
27 INDEMINITY BOND
28 A/T ACCEPTANCE LETTER
31 ANNEXURE – IA
32 MANUFACTURER’S AUTHORIZATION
33 SAFETY CHECK LIST
34 CONFIRMATION DETAILS OF BIDDER
35 COMPLETION PERIOD
36 FINANCIAL CAPABILITY
37 LATEST INCOME TAX CLEARANCE CERTIFICATE
38 MEMORANDUM/ARTICLES OF ASSOCIATION
39 BOARD RESOLUTION
40 DETAILS OF HUMAN RESOURCES
41 DETAILS OF FIRM (ANNEXURE-1,2&3)
42 INTEGRITY PACT
43 BANK GUARANTEE ( EXTENSION OF VALIDITY )
44 BANK GUARANTEE(AMENDMENT OF VALUE OF B.G.AMOUNT )
45 BANK GUARANTEE ( For enhancement in value & extension of BG)
46 SAFETY CUM INDEMNITY BOND
47 ANNEXURE-A OUR ENDEVOUR - Safety a habit
Seal & Signature of Bidder
NOTICE INVITED TENDER
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
RACE COURSE, VADODARA - 390
The ACE (Procurement & Contracts) GETCO for and on behalf of Gujarat Energy Transmission
Corporation Ltd., having its Corporate Office at Sardar Patel Vidyut Bhavan, Race Course, Vadodara
– 390 007, hereafter called as “GETCO”, intends to invite Tender for Design, Engineering,
Manufacturing, Supply, Erection, Testing & commissioning of 01 Nos. of 220/66kv Transformer Bays
at 220kv Dahej ss and 01 No of 220/66kv Transformer Bay at 220kv Zagadiya ss Under Bharuch Tr.
circle on EPC basis excluding Civil works.
Sr. No. Description
ACE(P&C)/Contract/TR bays Dahej & Zagadiya
Design, Engineering, Manufacturing, Supply,
Erection, Testing & commissioning of 01 Nos. of
220/66kv Transformer Bays at 220kv Dahej ss
2 Name of Sub station
and 01 No of 220/66kv Transformer Bay at 220kv
Zagadiya ss Under Bharuch Tr. circle on EPC
basis excluding Civil works.
11,800.00 (Including GST Rs.1800) by
3 Tender Fee (non-refundable)
RTGS/NEFT/Online only
4 Estimated Cost including GST in Rs. Rs.5,87,71,481.20
(1. Payment of EMD should be accepted by
RTGS / NEFT / online or Demand draft
5 Earnest Money Deposit amount in Rs. or Banker’s cheque or Pay order or Bank
For BG Validity will be 06 (Six) Months from the
date of submission of tender.)
6 Time period 15 (Fifteen) Months from Date of LOA.
On line (E-tendering) tender/ offer
7 submission last date up to 16.00 hours 21-05-2026
only (This is mandatory)
Physical submission of all the relevant
8 documents, last date up to 15.00 hours. No physical submission
By RPAD or SPEED POST only.
Date of opening of Tender fee, EMD
9 cover and QR bid physical as well as on Immediately
– line opening at 16.00 Hours.
10 Date of opening of Price Bids: Shall be intimated separately.
firm basis except for supply of substation
structure materials (including nut-bolts)
180 Days from the date of Opening of Technical
13 Type of Tender Item Rate Basis
Additional Chief Engineer (Procurement & Contracts)
Bidder may please note that under no circumstances whatsoever tender submission date as
specified in the NIT shall not be extended. Scope of work are clearly mentioned in tender.
For any clarity bidder may ask in pre bid query only otherwise GETCO reserves the right to
take the decision during detailed engineering/execution.
Seal & Signature of Bidder
GENERAL TERMS AND CONDITION OF CONTRACT
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/
‘OWNER’ intends to receive bids for Design, Engineering, Manufacturing, Supply, Erection,
Testing & commissioning of 01 Nos. of 220/66kv Transformer Bays at 220kv Dahej ss and
01 No of 220/66kv Transformer Bay at 220kv Zagadiya ss Under Bharuch Tr. circle on EPC
basis excluding Civil works as per detailed in the accompanying specifications in
accordance with Terms and Conditions herein. The bids shall be prepared and furnished
as per these Instructions.
Definition of terms:
Note: ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd
Vadodara or any of its group companies i.e. GUVNL, GSECL, MGVCL, DGVCL,
PGVCL, UGVCL and shall include its legal representatives, successors and
1.2 Any Bidder from a country which shares a land border with India will be eligible to bid
only if the Bidder is registered with the Competent Authority as per order no.
F.No.6/18/2019-PPD (Order Public Procurement no.1) dated 23/07/2020 and
F.No.6/18/2019-PPD (Order Public Procurement no.2) dated 23/07/2020, issued by
Public Procurement Division, Department of Expenditure, Ministry of Finance,
Government of India (DoE Order).
However, the aforesaid condition for registration of Bidders from countries (even if
sharing land border with India) shall not be applicable to Bidders from such countries to
which Government of India has extended lines of credit or in which Government of India
is engaged in development projects.
For the aforesaid purpose,
(i) “Bidder” means any person or firm or company, including any member of a consortium
or joint venture (that is an association of several persons, or firms or companies), every
artificial juridical persons not falling in any of the descriptions of bidders stated
hereinbefore, including any agency branch or office controlled by such person,
participating in a procurement process
(ii) “Bidder from a country which shares a land border with India” for this purpose means:
a. An entity incorporated, established or registered in such a country; or
b. A subsidiary of an entity incorporated, established or registered in such a country; or
c. An entity substantially controlled through entities incorporated, established or
registered in such a country; or
d. An entity whose beneficial owner is situated in such a country; or
e. An Indian ( or other) agent of such an entity; or
f. A natural person who is a citizen of such a country; or
g. A consortium or joint venture where any member of the consortium or joint venture
falls under any of the above
(iii) The beneficial owner for the purpose of (ii) (d) above will be under:
Seal & Signature of Bidder
1. In case of a company or Limited Liability Partnership, the beneficial owner is the natural
person(s), who, whether acting alone or together , or through one or more juridical person,
has controlling ownership interests or who exercises control through other means
a. “Controlling ownership interest” means ownership of or entitlement to more than twenty-
five percent of shares or capital or profits of the company
b. “Control” shall include the right to appoint majority of the directors or to control the
management or policy decisions including by virtue of their shareholding or management
rights or shareholders agreement or voting rights;
2. In case of a partnership firm, the beneficial owner is the natural person(s) who, whether
acting alone or together, or through one or more juridical person, has ownership of
entitlement to more than fifteen percent of capital or profits of the partnership;
3. In case of an unincorporated association or body of individuals, the beneficial owner is the
natural person(s), who, whether acting alone or together, or through one or more juridical
person, has ownership of or entitlement to more than fifteen percent of the property or
capital or profits of such association or body of individuals;
4. Where no natural person is identified under (1) or (2) or (3) above, the beneficial owner is the
relevant natural person who holds the position of senior managing official
5. In case of a trust, the identification of beneficial owner(s) shall include identification of the
author of the trust, the trustee, the beneficiaries with fifteen percent or more interest in the
trust and any other natural person exercising ultimate effective control over the trust through
a chain of control or ownership.
An Agent is a person employed to do any act for another, or to represent another in dealings
with third person.
Further, the successful Bidder shall not allowed to subcontract works to any contractor from a
country which shares a land border with India unless such contractor is registered with the
Competent Authority.
The Bidder shall in its bid submit a certificate in compliance to DoE order as per the given format.
Further, the firm has to be a ‘Class-I local supplier’ as defined under Public Procurement
(Preference to Make in India) Order, 2017 issued by Department for promotion of Industry
and Internal Trade (DPIIT), Ministry of Commerce and Industry, Government of India vide order
dated 15/06/2017, its revision dated 04/06/2020 (PPP-MII Order) read in conjunction with
‘Public Procurement (Preference to Make in India) to provide for Purchase Preference
(linked with local content) in respect of Power Sector’ order dated 28/07/2020 issued by
Ministry of Power (MoP Order) and subsequent modifications/amendments if any
Firms who are not ‘Class-I local supplier ‘ shall not be eligible to bid.
Registration desirable by DPIIT is must be valid till the expiry of validity of offer. Mere
application for registration will not be consider and bid is liable to rejected.
Eligible Bidder should submit the aforesaid registration documents and if not applicable, the
undertaking is to be submitted along with bid, stating that bidder are not falling under requirement
of registration as per DPIIT Guideline and will follow applicable DPIIT Guideline and appropriate
guideline regarding import of material as per DPIIT in toto.
Seal & Signature of Bidder
2.0 Scope of the proposal and Work
2.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility,
completely covering all the equipments and installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein
the following:-
a) Detailed Supply, Engineering and detailed calculation.
b) Complete manufacture including shop testing.
c) Providing engineering drawings, data, operation manual, etc for the Owner’s approval.
d) Packing and transportation from the manufacturer’s works to the Site.
e) Receipt storage, preservation and conservation of equipment & at the Site.
f) Pre-assembly, if any, insurance, erection, testing and commissioning of all the
equipments/accessories etc.
g) Reliability tests and performance guarantee tests on completion of commissioning.
2.2 No deviation whatsoever to certain conditions of the bidding documents permitted by the
Owner and therefore, the Bidders are advised that while making Bid Proposals and
quoting prices these conditions may appropriately be taken into consideration. Bidders
are required to furnish a certificate in this regard as per the format provided in Special
Conditions of Contract in a separate sealed envelope containing Bid security, which shall
accompany the Technical Bid. Any Bid not accompanied by such certificate shall be
rejected by the Owner and shall not be opened.
2.3 Bids not covering the above cited entire scope of works may be treated as incomplete
and hence rejected.
2.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled in
the required schedule of Bid Proposal Sheets.
2.5 This specification covers the detailing, designing, engineering, manufacturing, testing at
works, packing, supply, storage, insurance and handling at site, Design, Engineering,
Manufacturing, Supply, Erection, Testing & commissioning of 01 Nos. of 220/66kv Transformer
Bays at 220kv Dahej ss and 01 No of 220/66kv Transformer Bay at 220kv Zagadiya ss Under
Bharuch Tr. circle on EPC basis excluding Civil works.
2.6 The work includes Design, Engineering, Manufacturing, Supply, Erection, Testing &
commissioning of 01 Nos. of 220/66kv Transformer Bays at 220kv Dahej ss and 01 No of
220/66kv Transformer Bay at 220kv Zagadiya ss Under Bharuch Tr. circle on EPC basis
excluding Civil works as stated hereunder & detailed in the Schedules so as to
complete the project as per approved bill of quantities and layout drawings.
(I) Scope of work : ( Electrical)
Design, Engineering, Manufacturing, Supply, Erection, Testing & commissioning of 01 Nos. of
220/66kv Transformer Bays at 220kv Dahej ss and 01 No of 220/66kv Transformer Bay at 220kv
Zagadiya ss Under Bharuch Tr. circle on EPC basis excluding Civil works for the followings;
Seal & Signature of Bidder
220KV SWITCHYARD 66KV SWITCHYARD
NOS. OF NOS. OF
NAME OF BAY NAME OF BAY
220KV LINE BAYS 0 66KV LINE BAYS
BAYS(HV BAYS) BAYS(LV BAYS)
Bus Coupler 0 Bus Coupler
PT BAY 0 PT BAY
66/11kV Tr. Bay
Complete Sub-Station including hardware & software for local control station along with
associated equipments as defined in tech specifications.
(A) Other activities for 220kV Sub-Station.
(i) Complete relay & protection system including design, engineering, calculations etc.
(ii) Air conditioning system – For control room (split A/C)
(iii) LT Switchgear (A/C & D/C Distribution board)
(iv) Batteries & battery chargers for
(v) Control Cables
(vi) Fire detection & Alarm system for Building
(vii) Mandatory Spares
- As specified in BOQ & tech specification part –II.
(viii) Other associated equipments, accessories etc. as per layout.
(ix) Structures:
G.I. Lattice structure drawings for 220/66KV gantry structures (Towers & Beams),
Equipment structures (whose drawings are available with GETCO) Drawings will be
supplied by GETCO & to be erected as per GETCO’s standard drawing, given to
successful bidder including, transportation, handling, storage, insurance & erection.
Design of structure (Whose Drawings are not available with GETCO) to suit the
equipments being supplied by bidder is to be carried out according to base dimension
of foundation standardized by ‘GETCO’ for 220kV which will be given to successful
a) Complete Earthing system including Earth mat. and protection against direct
stroke of lightning.
b) Execution of earthing work includes supply of all earthing materials.
a) Yard Lighting of the switchyard.
b) Illumination design to be done as per CBIP manual.
c) Illumination of CR building.
Seal & Signature of Bidder
d) Scope is as per BOQ & Specifications as per Part –II
e) This is being an Turnkey project therefore any item , accessories, work etc
required for completion and successful operation of entire project shall be
considered in the scope.
Contractor has to provide all engineering drawings, data calculations etc for owners
approval as specified in part –I, GCC, general Information. (Tech) – Clause No.
2.6 PROJECT PARTICULARS
Name of the Project: 220/66KV TR bays at 220kv Dahej & 220kv Zagadiya SS
Project Particulars 220kV Dahej SS 220kv Zagadiya SS
System Voltage 220/66 KV 220/66 KV
System of Earthing Solidly Earthed Solidly Earthed
Rated frequency 50 HZ ± 5% 50 HZ ± 5%
Control voltage 220 V DC ± 10% 110 V DC ± 10%
Average Soil resistivity 20 Ω-mtr. 28 Ω-mtr.
Nearest Railway station Bharuch Ankleshwar
Nearest Airport Surat Surat
Long: 72°35'12"E Long: 72°74'00"E
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be
responsible/ liable for these costs irrespective of the course and conclusion of this
4.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of
a. General Conditions of Contract (GCC-Part I)
b. Erection Conditions of Contract (ECC-Part I)
c. Special Conditions of Contract (SCC-Part I)
d. Technical Specifications (TSP-Part II – Electrical)
e Technical Specifications(TSP-Part III-civil)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder has to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the
conditions and contents therein, which may in any manner, affect the scope & content
of work and the costs thereof. Submission of a Bid not substantially responsive to the
Bid Document in all respects and/or failure to furnish all information required by the Bid
Document may entail rejection of the Bid at the Bidder’s risk.
Seal & Signature of Bidder
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
specifications or is in doubt as to the true meaning of any part, he shall make a request,
in writing not later than one week before the date of submission of bid, to the owner in
triplicate. The owner will issue explanations, interpretations and clarifications as deemed
fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time
stipulated in the Bid invitation, All such explanations, interpretations and clarifications
from the Owner shall be deemed as part of Bid Documents and shall invariably
accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee
(s) or his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending
Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who
have received the Bidding Document at the address contained in the letter of request for
issue of Bidding document from the Bidders. Owner will bear no responsibility or liability
arising out of non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment
into account in preparing their bids, the Owner may, at his discretion, extend the deadline
for the submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose
such documents as a part of the bid.
8.0 PREPARATION OF BIDS
Language Of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the
Bid, exchanged by the Bidder and the Owner, shall be written in the English language,
provided that any printed literature furnished by the Bidder may be written in another
language so long as accompanied by an English translation of its pertinent passages.
Failure to comply with this may disqualify a bid. For purposes of interpretation of the bid,
the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. verbatim
without adding any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and
factors which may have any effect on the execution of the Contract covered under these
Seal & Signature of Bidder
documents and specifications. The Owner shall not entertain any request for
clarifications from the bidders, regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting the proposals. No claim for financial adjustment to the
Contract awarded under these specifications and documents will be entertained by the
owner. Neither any change in the time schedule of the Contract nor any financial
adjustments arising thereof shall be permitted by the Owner, which are based on the
lack of such clear information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the goods to be
supplied and services to be rendered, a brief description of goods and services, quantity
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets
the Qualification Requirements as detailed in Special Conditions of Contract and GCC.
10.3 All Tender Documents/ formats are to be returned completed in all respects and
signed by the Company Authorized Signatory wherever specified.
All Bid documents duly signed & sealed shall be submitted with technical bid.
10.4 The Bid Guarantee shall be furnished in a separate cover in accordance with clause at
11.0 Bid Price:
F.O.R. Destination prices for Goods, the price for erection, testing and commissioning,
price for associated civil, structural works and other services it proposes to furnish under
the contract, EXCLUDING GST and Cess along with the total bid price.
GST shall be applicable at the rate of 9% CGST plus 9% SGST or 18% IGST,
or as applicable to composite supplies in the nature of Works Contract
applicable from time to time will be paid within the original contractual
delivery period. However, the Classification Codes (i.e. HSN or SAC) for
each item of different segments or portions of the Works Contract, shall be
specified separately, for information and technical identification purpose
11.2 Detailed break up, covering all the price components of unit prices as well as total bid
provided by the bidder. This break up shall be entered separately in the following
A) For all goods offered:
Prices quoted should be FIRM and on F.O.R. Destination basis (i.e. any of the stores of
COMPANY in Gujarat). However, the Tenderer should indicate in Price Bid, the break-
Seal & Signature of Bidder
up of Total Unit F.O.R. Destination Price stating the Unit Ex-works price, freight, packing
& forwarding charges, Insurance Charges, separately in price bid, which is a must. The
rate of GST shall be 9% CGST plus 9% SGST or 18% IGST or as applicable to
composite supply in the nature of Works Contract, applicable from time to time.
ii. This tender is to be treated as a contract for composite supply under the category of
Works Contract, which is, as per the provisions of Section 2(30), read with, Section
2(119), further read with, Paragraph 6(a) of the Schedule II, to the CGST Act, 2017 and
similar provisions, applicable under UTGST Act, 2017 and the IGST Act, 2017. However,
the classification Codes (HSN/SAC) for each item under different segments or portions
of the Works Contract, shall be specified separately for the knowledge and transparency
purpose which shall have no bearing on price or taxation payment.
iii. The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-______). The price bid submitted in physical mode shall not be considered.
iv. The Tenderer should invariably indicate the total unit end cost price considering all
their costs / calculations in the Price bid itself for each item and all sub-items if any. This
is a must. Cost components hidden / furnished elsewhere will not be considered and will
be ignored out rightly.
v. Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the
bidder intends to supply the goods / services, meaning thereby the bidder has to supply
the goods / services from the relevant declared / registered place of supply only.
11.3 The bidder’s separation of price components in accordance with above clause No:
will be solely for the purpose of the facilitating the comparison of Bids by the owner, for
contract price amendment due to quantity variation and for on account payments (in
case of award) and shall not in any way limit the Owner’s rights.
11.4 The Price quoted by the bidder shall remain firm during the contract period
and shall not be subject to variation on any account or for change in
11.5 The Bidder shall specifically note that the Tenders are invited on item rate base.
12.0 Bid Security/EMD:
12.1 The bidder shall furnish, as a part of its bid EMD, bid security for an amount of Lacs to
be paid as under:
a) 50% OR 100% In the form of crossed DD drawn in favor of Gujarat Energy Transmission
Corporation Limited payable at Vadodara.
b) Remaining 50% amount in form of BG from approved banks of GETCO having validity
of Six months from the date of bid opening of Technical Bid.
c) Payment by Cheque / Coop Bank Guarantee/ Company Guarantee is not
d) Validity Period: - The offer should be valid for a minimum period of 180 days
from the date of opening of Technical bid.
12.2 The bid security is required to protect the owner against the risk of Bidder’s conduct,
which would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The
bid guarantee shall be made payable to the Owner without any condition whatsoever.
Seal & Signature of Bidder
12.3 Any bid not secured in accordance with above will be rejected by the Owner as non-
responsive. No exemptions are made in the furnishing of the security.
12.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of
tender or three months from the date of submission of tender whichever is later.
12.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee
12.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the
bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works (
including supplies within thirty days of letter of award of contract )
13.0 Format of Bid:
13.1 The Bidder shall prepare two copies of the bid, clearly marking each “Original bid” and
“Copy of Bid”, as appropriate. In the event of any discrepancy between them the original
shall govern. All the documents furnished in original document shall be furnished in other
copies of Bids.
13.2 The original and all copies of the bid shall be typed or written in indelible ink and shall
be signed by the Bidder or a person or persons duly authorized by the Bidder to sign the
Contract. The letter of authorization shall be indicated by written power-of-attorney
accompanying the bid. All pages of the bid, except for un-amended printed literature,
shall be initiated by the person or persons signing the bid.
13.3 The Bidders must submit the qualifying data in one original and one duplicate copy as
required in this Instructions to Bidders in separate envelopes sealed and enclosed in the
envelope submitting proposals, super scribed as under :
QUALIFYING DATA FOR THE SUPPLY AND ERECTION
ACE(P&C)/Contract/TR bays Dahej & Zagadiya/E-424
The bid shall contain no interlineations, erasures or overwriting except as
necessary to correct errors made by the Bidder, in which case such corrections
shall be initiated by the person or persons signing the bid.
13.4 Bids shall be submitted as under:
Cover-I Earnest Money Deposit (Bid-Security), as per relevant clause of SCC
duly signed and Contractor’s covering letter. Tender fee details (as per
Cover-II Qualifying Requirements. (Electrical & Civil)
Seal & Signature of Bidder
Cover-III Technical Bid (Electrical )
Cover-IV Technical Bid (Civil )
Note: The Prices are to be filled online only. Price Bids are not to be
submitted with physical documents.
All Bid documents duly signed & sealed shall be submitted with technical bid.
Must contain conditions and schedules of Part- III without prices and Technical Data
Requirement Sheets (Cover I, II, III will be collectively called Technical Bid).
All Bid documents duly signed & sealed shall be submitted with technical bid.
14.0 Signature Of Bids:
14.1 The bid must contain the name, residence and place of business of the person or
persons making the bid and must be signed and sealed by the Bidder with his usual
signature. The names of all persons signing should also be typed or printed below the
14.2 Bid by a partnership must be furnished with full names of all partners and be signed with
the partnership name, followed by the signature(s) and designation(s) or the authorized
partner(s) or other authorized representative(s).
14.3 Bids by Corporation/Company must be signed with the legal name of the
Corporation/Company by the President/Managing Director or by the Secretary or other
person or persons authorized to bid on behalf of such Corporation/Company in the
14.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
14.5 If it is found that two or more persons who are connected with one another either
financially or as a principal and agent have bid under different names without disclosing
their connection then such bids will be liable for rejection. Satisfactory evidence of
authority of the person signing on behalf of the Bidder shall be furnished with the bid.
14.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
14.7 Bids not conforming to the above requirements of signing may be disqualified and EMD
15.0 Sealing and marking of bids:
15.1 Cover-I 1. Bid No.
2. Due date for opening
3. Reference of tender fee & earnest money deposit
Cover-II 1. Bid No.
2. Due date for opening.
Seal & Signature of Bidder
3. Qualifying Requirements (Electrical & civil).
Cover-III 1. Bid No.
2. Due date for opening
3. Technical bid (Electrical)& (CIVIL) reference and required certificates
Cover-I, Cover-II ,Cover-III shall be individually sealed and super scribed as indicated
above and should be enclosed in the main cover duly sealed and super scribed as
Tender for …………………………………… against Bid No…………… due
on…………… containing Cover-I, Cover-II, Cover-III of this tender.
The original Bid and accompanying documents clearly marked “Original” plus one copy
for Cover I, II, III shall be submitted by the Bidder at the date, time and place specified.
In the event of any discrepancy between the original and the copies, the original shall
The Bid shall be submitted by RPAD or through speed post services at the Office
of the ACE (P & C) GETCO, Bids submitted should be posted with due allowance for
any postal delay. The Bids received after the Due Date and Time of opening are liable
to be rejected. Telegraphic/Telex/Fax/e-mail Bids shall not be entertained.
15.2 The Bidders shall seal the original and each copy of the bid in an inner and an outer
envelope, duly marking the envelopes as “original” and “copy”.
15.3 a. Addressed to the Owner at the following address:
The Additional Chief Engineer (P & C ) - GETCO
8th Floor, Sardar Patel Vidyut Bhavan, Race Course,
b. Bear the name of package bid enquiry number, name of the work and the words. “DO
NOT OPEN BEFORE……………………
15.4 The inner envelope shall indicate the name and address of the Bidder to enable the bid
to be returned unopened in case it is declared “late” or “rejected”.
15.5 If the outer envelope is not sealed and marked as required by Clause No: 15.1 the Owner
will assume no responsibility for the bid’s misplacement or premature opening.
15.6 The Bid Security conditions must be submitted in a separate sealed envelope.
16.0 Deadline for submission of bids :
16.1 Bids submitted by telex/telegram will not be accepted. No request from any Bidder to the
Owner to collect the proposals from airlines, cargo agent etc. shall be entertained by the
16.2 Bids must be received by the Owner at the address specified under Clause No: 15.3,
not later than the time & date mentioned in the Invitation to Bid.
16.3 The Owner may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner
Seal & Signature of Bidder
and Bidders previously subject to the deadline will thereafter be subject to the deadline
17.1 Any bid received by the Owner after the time and date fixed or extended for submission
of bids prescribed by the Owner, will be rejected and not considered for evaluation.
18.0 Modification and withdrawal of bids :
18.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written
notice of the modification or withdrawal is received by the Owner prior to the deadline
prescribed for submission of bids.
18.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and
dispatched in accordance with the provisions of clause No: 15.0. The envelope should
clearly indicate whether the modification is for the Technical bid or the Price bid. No bid
modifications notice by Telex/Grams/Fax shall be entertained by the Owner.
18.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for
submission of bids.
18.4 No bid may be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture
of its bid security.
19.0 Information required with the proposal:
19.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of
each principal item of equipment proposed to be furnished and erected. The bid should
also contain drawings and descriptive materials indicating general dimensions, materials
from which the parts are manufactured, principles of operation, the extent of pre-
assembly involved, major construction equipment proposed to be deployed, method of
erection and the proposed erection organizational structure.
19.2 The above information shall be provided by the Bidder in the form of separate sheets,
drawings, enclosed etc. in two copies along with soft copy.
19.3 Any bid not containing sufficient descriptive material to describe accurately the
equipment proposed may be treated as incomplete and hence rejected. Such descriptive
materials and drawings submitted by the Bidder will be retained by the Owner. Any major
departure from these drawings and descriptive material submitted will not be permitted
during the execution of the Contract without specific written permission of the Owner.
19.4 Oral statements made by the Bidder at any time regarding quality, quantity or
arrangement of the equipment or any other matter will not be considered.
19.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to
provide additional information and data as deemed necessary by the Bidder.
19.6 The Bidder, along with his Proposal, shall submit a list of recommended erection
equipment and materials which will be required for the purpose of erection of equipment
and materials supplied under the Contract.
Seal & Signature of Bidder
19.7 In case the ‘Proposal’ information contradicts specification requirements, the
specification requirements will govern, unless otherwise brought out clearly in the
technical commercial deviation schedule.
BID OPENING AND EVALUATION
20.0 Opening of bids by owner:
20.1 The Owner will open the bids in the presence of Bidder’s representatives who choose to
attend on the date and time mentioned for opening of bids in the Invitation to Bid or in
case any extension has been given thereto, on the extended bid opening date and time
notified to all the Bidders who have purchased the bidding document. The Bidder’s
representatives who are present shall sign a register evidencing their attendance.
20.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as
the Owner, at his discretion may consider appropriate, will be announced in the
Technical Bid Opening.
20.3 The price bids of all the “Techno-Commercial” Responsive Bidders shall be opened in
the presence of representatives (up to two per firm) of such bidders who choose to be
present. The date & time of opening the Price Bid shall be intimated to all such qualified
bidders by Fax/Telex, at least one week in advance besides inviting final price bid if
found appropriate after evaluation of Technical bids.
20.4 The Bidder’s name, Bid Price, all discounts if any, modifications in the Price Bid and any
such other details as the Owner, at his discretion, may consider appropriate, will be
announced/ furnished in the Price Bid Opening.
20.5 No electronic recording/transmitting devices will be permitted during Bid opening.
21.0 Purpose of evaluation of bids:
21.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the
technical responsiveness of the bid for the complete scope of the proposal, as covered
under these specifications and documents. All technically responsive bids shall then be
examined to determine the lowest evaluated commercially and technically responsive
22.0 Policy for bids under consideration:
22.1 Bids shall be deemed to be under consideration immediately after opening of Technical
Bid and until such time official intimation of award/rejection is made by the Owner to the
Bidders. While the Bids are under consideration, Bidders and/or their representatives
and other interested parties are advised to refrain from contacting by any means, the
owner and/or his employee’s representatives on the matters related to Bids under
22.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his
own ask the Bidder for a clarification of its bid. The request for clarification and the
response shall be in writing and no change in the price or substance of the bid shall be
sought, offered or permitted.
Seal & Signature of Bidder
23.0 Preliminary Examination:
23.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished,
whether the documents have been properly signed, and whether the bids are generally
23.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price shall
be corrected. If there is a discrepancy between the total bid amount and the sum of total
costs, the latter shall prevail and the total bid amount will be corrected accordingly. If
there is a discrepancy between words and figures, the amount advantageous to the
Owner will prevail. If the Bidder does not accept the correction of the errors as above,
his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder should
other. In the case of any inconsistency in the prices furnished in the specified prices
schedules to be identified in Bid Form for this purpose, the Owner shall be entitled to
consider the highest price for the purpose of evaluation and for the purpose of award of
Contract use the lowest of the prices in these schedules.
23.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness
of each bid to the Bidding Document. For purpose of these Clauses, a substantially
responsive bid is one which conforms to all the terms and conditions of the Bidding
Document without material deviations. A material deviation is one which affects in any
way the prices, quality, quantity or delivery period of the equipment, completion of works
or which limits in any way the responsibilities or liabilities of the Bidder of any right of the
Owner as required in these specifications and documents. The Owner’s determination
of a bid’s responsiveness shall be based on the contents of the bid itself without recourse
to extrinsic evidence.
23.4 A bid determined as not substantially responsive will be rejected by the Owner and may
not subsequently be made responsive by the Bidder by correction of non-conformity.
23.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid
which does not constitute a material deviation, provided such waiver does not prejudice
or affect the relative ranking of any Bidder.
24.0 Award Criteria
24.1 The owner will award the contract to the successful Bidder, whose bid has been
determined to be substantially responsive and has been determined as the lowest
evaluated bid, providing further that the Bidder is determined to be qualified to perform
the contract satisfactorily. The Owner shall be the sole judge in this regard.
24.2 In case of award of Contract on a bidder there shall be separate contracts one for Civil
works, second for supply of goods and third for the erection & services works in
24.3 Further, the Owner reserves the right to award separate contracts to two or more parties
in line with the terms and conditions specified in the accompanying Technical
Specifications.
Seal & Signature of Bidder
25.0 Owner’s right to accept any bid and to reject any or all bids:
25.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding
process and reject all bids at time prior to award of contract, any without thereby incurring
any liability to the affected Bidder or Bidders or any obligation to inform the affected
Bidder or Bidders of the grounds for the Owner’s action.
26.0 Notification of award:
26.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the
Owner will notify the successful Bidder in writing by registered letter or cable or telex or
FAX, to be confirmed in writing by registered letter, that its bid has been accepted.
26.2 The notification of award will constitute the formation of the Contract.
26.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause No: 36 & 38, the Owner will promptly notify each unsuccessful Bidder and will
discharge its bid security, pursuant to Clause No: 12.00.
27.0 Signing of contract:
27.1 At the same time as the Owner notifies the successful Bidder that his bid has been
accepted, the Owner will send the Bidder the detailed of Award, incorporating all
agreements between the parties.
27.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the
same with date and return it to the Owner.
27.3 The Bidder will prepare the Contract Agreement as per the proforma prescribed and the
same will be signed within 30 (Thirty) days of notification of Award.
28.0 DEFINITION OF TERMS
28.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor
as per the Contract Agreement signed by the parties, including all attachments and
appendices thereto and all documents incorporated by reference therein.
28.2 ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd Vadodara or any
of its group companies i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and
shall include its legal representatives, successors and assigns.
28.3 ‘Contractor’ or ‘Manufacturer’ shall mean the Bidder whose bid is accepted by the Owner
for the award of the Works and shall include such successful Bidder’s legal
representatives, successors and permitted assigns.
28.4 ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the Works
or any person to whom any part of the Contract has been sublet by the Contractor with
the consent in writing of the Engineer and will include the legal representatives,
successors and permitted assigns of such person.
28.5 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer
from time to time for the purpose of the Contract.
Seal & Signature of Bidder
28.6 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment,
stores and materials to be provided by the Contractor under the Contract.
28.7 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per
the Specifications and complete erection, testing and putting into satisfactory operation
including all transportation, handling, unloading and storage at the Site as defined in the
28.8 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of
the Contract and such other schedules and drawings as may be mutually agreed upon.
28.9 Site’ shall mean and include the land and other places on, into or through which the
works and the related facilities are to be erected or installed and any adjacent land,
paths, street or reservoir which may be allocated or used by the Owner or Contractor in
the performance of the Contract.
28.10 The term ‘Contract Price’ shall mean the Firm price quoted by the Contractor in his bid
with additions and/or deletions as may be agreed and incorporated in the Letter of Award
and the contract agreement for the entire scope of the works.
28.11 The term ‘Equipment Portion’ of the Contract price shall mean the ex-works value of the
equipment/Materials supplied include structures, town materials insulators, conducting
28.12 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of
the works including erection, testing and putting into satisfactory operation including
successful completion of performance and guarantee tests to be performed at Site by
the Contractor including cost of insurances.
28.13 ‘Manufacturer’s Works’ or ‘Contractor’s Works’, shall mean the place of work used by
the manufacturer, the Contractor, their collaborators/associates or Sub-Contractors for
the performance of the Contract.
28.16 Site Engineer ‘Inspector’ shall mean the Owner owner’s Engineers or any person
nominated by the time to inspect the equipment; stores or Works under the Contract
and/or the duly authorized representative of the Owner.
28.17 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official
notice issued by the Owner notifying the Contractor that his bid has been accepted.
28.18 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the
28.19 ‘Date of Contract’ shall mean the date on which Notice of Award of Contract/Letter of
Award has been issued.
28.20 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
28.21 A ‘Week’ shall mean continuous period of seven (7) days.
28.22 Writing’ shall include any manuscript, type written or printed statement, under or over
signature and/or seal as the case may be.
Seal & Signature of Bidder
28.23 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’,
‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’,
‘Accepted’, ‘Permitted’, or words and phrases of like importance are used the approval,
judgment, direction etc. is understood to be a function of the Owner/Engineer.
28.24 Test on completion shall mean such tests as prescribed in the Contract to be performed
by the Contractor before the work is taken over by the Owner.
28.25 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required
to determine and demonstrate capacity, efficiency, and operating characteristics as
specified in the Contract Documents.
28.26 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance
of the Works performed under the Contract, after successful commissioning/completion
of Performance and Guarantee Tests, as specified in the accompanying Technical
Specifications or otherwise agreed in the Contract.
28.27 ‘Guarantee Period’/’Maintenance Period’ shall mean the period during which the
Contractor shall remain liable for repair or replacement of any defective part of the works
performed under the Contract.
28.28 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man-
ship which cannot be detected during inspection, testing etc, based on the technology
available for carrying out such tests.
28.29 ‘Drawing’, ‘Plans, shall mean all:
a) Drawings furnished by the Owner/Consultant as a basis of Bid/Proposals.
b) Supplementary drawings furnished by the Owner/Consultant to clarify and to define
in greater detail the intent of the Contract.
c) Drawings submitted by the Contractor with his bid provided such drawings are
acceptable to the Owner/Consultant.
d) Drawings furnished by the Owner/Consultant to the Contractor during the progress
of the work; and
e) Engineering data and drawings submitted by the Contractor during the progress of
the work provided such drawings are acceptable to the Engineer/Owner.
28.30 ‘Codes’ shall mean the following including the latest amendments and/or replacements,
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
Seal & Signature of Bidder
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the
subject matter of the Contract.
28.31 Words imparting the singular only shall also include the plural and vice –versa where the
context so requires.
28.32 Words imparting ‘Person’ shall include firms, companies, corporations and associations
or bodies of individuals, whether incorporated or not.
28.33 Terms and expressions not herein defined shall have the same meaning as are assigned
to them in the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act
(1872) and failing that in the General Clauses Act (1897) including amendments thereof,
In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance
28.34 GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means
IGST Act, GST(Compensation to the State for Loss of Revenue) Act, CGST Act,
UTGST Act and SGSCT Act, 2017and all related ancilliary legislations.
28.35 Works contract means a Contract for composite supply and covered under the
definition of Works Contract as defined under Section 2(119) of the CGST Act,
2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST Act,
2017and the IGST Act,
29.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by
provisions in other parts of the Contract.
The goods supplied under this Contract shall conform to the standards mentioned in the
Technical Specifications, and, when no applicable standard is mentioned, to the
authoritative standard appropriate to the goods and such standards shall be the latest
issued by the concerned institution
31.0 LANGUAGE AND MEASURES
Seal & Signature of Bidder
All documents pertaining to the Contract including specifications, schedules, notices,
correspondences, operating and maintenance instructions, drawings or any other writing
shall be written in English language. The Metric System of measurement shall be used
exclusively in the Contract.
32.0 Price Basis:
32.1 The Price shall be quoted on firm basis except for supply of substation structure
materials (including nut-bolts) for which Price variation will be applicable.
32.2 The Price quoted by the bidder shall remain fixed for all the items except substation
structure materials (including nut bolts); during the bidder's performance of the contract
and shall not be subject to variation on any account save for change in quantity. A bid
submitted with an adjustable price quotation shall be treated as non-responsive and
For substation structure material:
The latest revised PV formula is as under:
P0 SBLR SBIR Zn W
100 SBLRo SBIRo Zno W0
P = Price payable as adjusted in accordance with the above formula.
P0 = Price quoted/confirmed.
SBLR0 = Price of Steel Blooms- Retail (refer notes)
This price is as applicable for the month, ONE month prior to the date of
SBIR0 = Price of Steel Billets- Retail (refer notes)
This price is as applicable for the month, ONE month prior to the date of
Zn0 = Price of Electrolytic high grade zinc (refer notes)
This price is as applicable for the month, ONE month prior to the date of
Wo = All India average consumer price index number for industrial workers, as
published by the Labour Bureau, Ministry of Labour, Govt. of India (Base:
2016 = 100) (Refer notes)
This index number is as applicable for the month, THREE months prior to the
date of tendering.
For example, if date of tendering falls in November 2023, the applicable prices of Steel
Bloom-Retail (SBLR0), Steel Billets-Retail (SBIR0) and Zinc (Zn0) should be for the month
October 2023 and all India average consumer price index number (W0) should be for the
month of August
Seal & Signature of Bidder
The above prices and indices are as published by IEEMA vide circular reference number
IEEMA (PVC)/TLT- 2022/_/_ ONE month prior to the date of tendering
SBLR = Price of Steel Bloom-Retail (refer notes)
This price is as applicable for the month, TWO months prior to the date of
SBIR = Price of Steel Billets-Retail (refer notes)
This price is as applicable for the month, TWO months prior to the date of
Zn = Price of Electrolytic high grade zinc (refer notes)
This price is as applicable for the month, TWO months prior to the date of
W= All India average consumer price index number for industrial workers, as
published by the Labour Bureau, Ministry of Labour, Govt. of India
(Base: 2016 = 100) (refer notes)
This index number is as applicable for the month, FOUR months prior to the
date of delivery.
21.1 The price variation amount in the ex-works price of fabricated structure members
(including bolts & nuts) calculated by the above formula shall not be subject to any ceiling,
21.2 The price variation formula will be applicable from the date of inspection / waival of
inspection for the material offered.
21.3 The price variation will be applicable during contractual delivery period only. However,
any decrease in the price variation during delayed period shall be applicable.
21.4 Price variation shall not be allowed beyond the original delivery date unless specifically
stated in the time extension letter. As a rule, no price adjustment shall be allowed for the
period of delay for which the supplier is responsible; however purchaser will be entitled
for any decrease in the prices during this delayed period.
21.5 In case of non-publication of applicable indices on a particular month, which happens to
be the applicable month for price variation purpose, the published indices prevailing
immediately prior to the particular month shall be applicable.
21.6 If the price adjustment amount works out to be positive, the same is payable to the
contractor by the owner and if it works out to be negative, the same is to be recovered
by the owner from the contractor.
21.7 No price variation will be allowed on the freight and insurance component of FOR
destination prices.
21.8 The supplier has to submit PV bills (Negative / Positive) along with supporting documents
/ IEEMA circulars necessary for calculation of PV bills along with bills for payment against
SR Notes. To claim the price variation successful bidder has to submit the supporting
documents duly notary certified copy of IEEMA circulars, PV calculation sheet etc. along
with their invoices.
Seal & Signature of Bidder
21.9 The base date for the above Price Variation formula will be first day of the month prior to
opening month of the Tender.
21.10 In the above price variation formula, subscript “0” refers to indices as on 30 days prior to
the date of Bid opening (referred to base date indices). Subscript “1” refers to the indices
as on 60 days prior to date of inspection / waival of inspection of the material offered.’
33.0 Taxes and Duties:
Goods and Service Tax (GST):
33. 1 The F.O.R. Destination prices are excluding GST and Cess as applicable which
will be paid extra on a given taxable goods and/or services within the original
contractual delivery period. The amount and % of GST and Cess as applicable
should clearly be indicated separately. (GST/Cess means all applicable
Tax/Cess under GST Laws. GST Laws means IGST Act, GST(Compensation to
the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017 and all related ancilliary legislations).
33. 2 You shall have to submit a C.A Certificate & duly authorized Signatory of
successful bidder, certifying that you have not claimed Refund of any applicable
GST and Cess, charged to COMPANY or shall not claim any such Refund, on a
future date, from the concerned Authorities and if, any Refund, in respect of such
GST and Cess, is claimed by you, it will be immediately passed on to the
COMPANY, without COMPANY making any specific Claim, for the same, either
from the Department or from you.
33. 3 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if
the rate of GST and Cess is not mentioned clearly unless the bidder has opted
for Compostion Scheme under GST Act, which should be clearly indicated in the
price bid. COMPANY may at its discretion consider such offer with presumption
of highest applicable rate of GST and Cess prevailing when the price quoted is
inclusive of GST and Cess.
33. 4 If the Supplier/Contractor has opted for the Composition scheme of GST, the
same must be clearly specified with valid Declaration & Certificate from
Department. In the event of withdrawal/cessation of the Supplier from
Composition scheme during the tenure of the contract, the rate mentioned in the
price bid shall be final and any additional GST will have to be borne by the
tenderer. In no case additional amount towards tax or otherwise will be paid /
reimbursed to supplier/contractor. Further Statutory Variation clause will not be
applicable in case of Supplier / Contractor has opted for Composition Scheme
33. 5 Supplier/Contractor should charge GST in Invoice at the rate as agreed to /
mentioned in acceptance of tender only and any deviation in the same shall not
be accepted. Further, any additional liability of GST (later on due to wrong
mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and
above as charged in the invoice shall be borne by the Supplier/Contractor.
However, any refund received by the supplier / contractor on account of GST
charged from the company; such refund shall have to be passed on to the
Seal & Signature of Bidder
company, along with interest if any. Such refund along with interest needs to be
passed on suo-moto by the supplier / contractor.
33. 6 Further, the Company has a right to recover the amount of GST along with penal
interest at the rate of 15% per annum if GST charged is not paid / short paid to
the government or fail to upload the details or uploads inaccurate particulars on
GSTIN portal by the Supplier / Contractor within the stipulated time limit.
33. 7 In case, Govt. revises the rate of GST rate / Code during the tenure of the
contract, the provision of GETCO’s statutory variation clause shall apply.
33. 8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due
to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the GST Act, subsequent to the
date of submission of the offer, the same should be passed on to COMPANY and
you should inform such changes to COMPANY from time to time.
33. 9 GST, other taxes and other levies and duties including custom duty solely in
respect of the transaction between the owner and the contractor under this
contract, if any, shall be included in the bid price. These shall also be indicated
separately wherever applicable as mentioned in the Tender .
33. 10 As regards the income Tax, surcharge on income tax and any other corporate
tax, including GST if any the owner shall not bear any tax liability whatsoever.
The bidder shall be liable and responsible for payment of such taxes as attracted
under the provisions of the law.
33. 11 Notwithstanding the tax liabilities as per the sub-clause 35.10 above the owner
shall have the right to make deduction at source from the amounts payable to the
contractor in respect of Income Tax (on the cost of items of supply included in
the works contract) as may be mandatory in terms of the law. The owner shall
not bear any liability in this regard but shall issue necessary certificate in respect
of such deduction made.
33. 12 Whenever concessional rate of GST is indicated by the bidders, it shall be
confirmed whether any increase in the rates that becomes applicable during the
performance of the contract would be absorbed by the supplier. Bidder shall note
that in case of absence of such confirmation; the tenders will be evaluated taking
into account the maximum rate of GST applicable.
33. 13 In case any tax or duty is newly introduced by the Government applicable for this
contract with effect from the next day of the date submission of the bid and if the
contractor is required to pay additional tax or duty, then the owner shall reimburse
the contractor the additional tax or duty so paid by the contractor against
submission by the contractor of documentary evidence to the satisfaction of the
owner. This provision will not be applicable to transaction between the contractor
and his sub-suppliers, sub-contractors for raw materials etc and will be applicable
only to the direct transactions between the contractors and owner. Besides the
Seal & Signature of Bidder
said statutory variation, no other statutory variation shall be payable by the
33. 14 The owner’s liability for all taxes and duties including GST under the contract
shall be limited to those indicated by the Bidder in the Bid Proposal Sheets,
subject to the statutory variations and variations as per Clause No. 35.4.
33. 15 If the cost to the Contractor during the performance of the ‘Contract’ shall be
increased or reduced by reasons of the making, passing or promulgation of any
law after the date of submission of bid or by any order, regulation or bye-law
having the force of law the amount of such increase or reduction shall be added
to or deducted from the “Contract Price” as the case may be for direct
transactions between contactor & owner. It is the Bidders responsibility to furnish
details of taxes, duties, levies etc. applicable as on the date of submission of the
33. 16 No claim for any increase towards the statutory variation regarding enhancement
of existing tax or duty or introduction of a new tax or duty applicable shall be
entertained by the Owner during the extended period of contract, if any, provided
the extension of the contract is required by causes attributable to the contractor.
However, the decrease in any taxes/duties shall be passed on to GETCO.
33. 17 The provision of statutory variation regarding enhancement of existing tax or duty
or introduction of a new tax or duty will be applicable only to the direct transaction
between the contractor and the owner.
33. 18 Before quoting, the bidder may ascertain from the concerned tax authorities of
Government for the applicability of Entry Tax, GST etc. in respect of this work
and include the same in the quoted price. No separate claim in this regard will be
entertained by the Owner, as it is the responsibility of the Bidder to pay all these
34.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully
assessed against the Owner or the Contractor in pursuance of the Contract. In
addition, the Contractor shall be responsible for payment of all Indian duties,
levies and taxes including GST lawfully assessed against the Contractor for his
personal income & property only.
35.0 Price Inclusions (including Taxes & Duties):
35.1 GOODS AND SERVICE TAX (GST): GST and Cess as applicable shall be
payable/ receivable as mentioned in clause no.33 of GCC supra
35.2 The prices quoted shall be all inclusive of freight, transportation, loading, –
unloading & stacking at site of materials supplied by Contractor as well as
owner supplied item if any
35.3 No extra payment toward any type of templates and erection tools /materials
Seal & Signature of Bidder
35.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and
Cess as applicable or in the event of introduction of new tax/cess or
cessation of existing tax/cess subsequent to suppliers offer if it takes place
within the original contractual delivery date will be to COMPANY’s account
subject to the claim being supported by documentary evidence. However, if
any decrease takes place after the contractual delivery date, the advantage
will have to be passed on to COMPANY.
35.5 Income Tax
Income-tax at source at the prevailing rate will be deducted from bills in
accordance with the provision of Income-Tax Laws and to that effect a certificate
will be issued to the contractor.
36.0 CONTRACT PERFORMANCE GUARANTEE
36.1 As a contract performance security, the successful bidder, to whom the work is awarded,
shall be required to furnish a performance guarantee as per clause No. 38 in form of
Bank guarantee from a Public Sector Indian bank/Scheduled, Commercial Bank in the
form to be furnished and it shall guarantee the faithful performance of the Contract in
accordance with the terms and conditions specified in these documents and
specifications.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the
a) The successful Bidder guarantees the successful and satisfactory operation of the
equipment furnished and erected under the Contract, as per the specifications and
b) The successful Bidder further guarantees that the equipment provided by him/his
sub-vendors and installed by him shall be free from all defects in design, material
and workmanship and shall upon written notice from the Owner fully remedy free of
expenses to the Owner such defects as developed under the normal use of the said
equipment within the period of guarantee specified in the relevant clause of the
General Terms and Conditions in the Part-I.
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire
contract. However, it is not to be construed as limiting the damages under clause entitled
“Equipment Performance Guarantee” in Technical Specifications, Part-II and damages
stipulated in other clauses in the Bid documents.
36.4 The Contract performance guarantee will be discharged without any interest on
successful completion of order and only after the performance guarantee condition is
fulfilled. The Contractor shall furnish Contract Performance Guarantee(s) for the proper
fulfillment of the Contract in the prescribed form within fifteen(15) days of “Notice of
Award of Contract”. The performance guarantee(s) shall be as per terms prescribed.
GUARANTEES & LIABILITIES
Seal & Signature of Bidder
37.1 The Contractor shall warrant that the whole project in accordance with the Contract
documents and free from defects in material/equipment and workmanship for a period
of twenty four (24) calendar months commencing immediately upon the satisfactory
commissioning of the Project and issuance of Taking Over Certificate (TOC). The
Contractor’s liability shall be limited to the replacement of any defective parts in the
equipment of his own manufacture or those of his Sub-Contractors under normal use
and arising solely from faulty design, materials and/or workmanship provided always that
such defective parts are repairable at the site and are not in meantime essential in the
commercial use of the equipment. Such replaced/defective parts shall be returned to the
Contractor unless otherwise arranged. No repairs or replacement shall normally be
carried out by the Engineer when the equipment is under the supervision of the
Contractor’s Supervisory Engineer.
37.2 In the event of any emergency where in the judgment of the Engineer, delay would cause
serious loss or damages, repairs or adjustment may be made by the Engineer or a third
party chosen by the Engineer without advance notice to the Contractor and the cost of
such work shall be paid by the Contractor. In the event such action is taken by the
Engineer, the Contractor will be notified promptly and he shall assist wherever possible
in making necessary corrections. This shall not relieve the Contractor of his liabilities
under the terms and conditions of the Contract.
37.3 If it becomes necessary for the Contractor to replace or renew any defective portions of
the works the provision of this clause shall apply to portion of the works so replaced or
renewed until the expiry of twelve (12) months from the date of such replacement or
renewal. If any defects are not remedied within a reasonable time, the Engineer may
proceed to do the work at the Contractor’s risk and cost but without prejudice to any
other rights which the Owner may have against the Contractor in respect of such defects.
37.4 The repaired or new parts will be furnished and erected free of cost by the Contractor. If
any repair is carried out on his behalf at the site, the Contractor shall bear the cost of
37.5 The cost of any special or general overhaul rendered necessary during the maintenance
period due to defects in the equipment or defective work carried out by the Contractor,
the same shall be borne by the Contractor.
37.6 The acceptance of the equipment by the Engineer shall in no way relieve the Contractor
of his obligations under this clause
37.7 In the case of those defective parts, which are not repairable at site but are essential for
the commercial operation of the equipment, the Contractor and the Engineer shall
mutually agree to a program of replacement or renewal, which will minimize interruption
to the maximum extent in the operation of the equipment.
37.8 At the end of the guarantee period, the Contractor’s liability ceases except for latent
defects. For latent defects, the Contractor’s liability as mentioned in Clause Nos.
through 37.7 above, shall remain till the end of 5 years from the date of completion of
guarantee period.
In respect of goods supplied by Sub-Contractors to the Contractor where a longer
guarantee is provided by such Sub-Contractor, the Owner shall be entitled to the benefits
of such longer guarantee.
37.9 The provisions contained in this clause will not be applicable: a) If the Owner has not
used the equipment according to generally approved industrial practice and in
Seal & Signature of Bidder
accordance with the conditions of operations specified and in accordance with operating
manuals, if any. b)In cases of normal wear and tear of the parts to be specifically
mentioned by the Contractor in the offer.
37.9 The Guarantee period for individual equipment / item indicated in the tender
specification remains unchanged and shall have to be adhering to as indicated
220KV & 66 KV CT & PT–You have to give assurance for trouble free and maintenance
free performance for a period of 60 Months from the date of receipt of stores. During this
period, the CTs /PTs shall be repaired/reconditioned/replaced free of cost immediately in
case of any trouble.
38.0 Performance Guarantee:-
“The successful bidder shall have to submit the performance guarantee in the form of
Bank Guarantee worth 10% of the total contract value (end cost) to cover the entire
execution. The Performance Bank Guarantee (covering the execution of the contract) will
be returned ONLY on successful commissioning & issuance of TOC including material
reconciliation & as built drawings and on receipt of the Bank Guarantee towards Warranty
worth 10% of the total contract value(end cost), which will be retained till completion of
the Guarantee period.
These Bank Guarantees shall be applicable for all the bidders irrespective whether they
are SSI/NSIC units.”
The above performance guarantee, to be submitted by successful tenderer, towards
execution period, is for the satisfactory execution of the contract.
Whereas the performance guarantee, to be submitted by successful tenderer, towards
warrantee, is for satisfactory performance of the materials which should be valid for
12/18/24/36/48/60 months from the date of commissioning OR 18/24/30/42/54/66 months
from the last date of delivery of supply whichever is earlier OR whatever applicable as
per technical specification
If the full Performance Guarantee amount / BG is not paid / submitted within
(Thirty) days after the receipt of the order , then the order will be outrightly
cancelled at the risk & cost of the Tenderer (at the discretion of the Corporation)
and without entering into any correspondences and this will be binding on the
39.0 Time Schedule:
39.1 The basic consideration and the essence of the Contract shall be strict adherence to the
time schedule for performing the specified works.
39.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
39.3 The completion schedule as stated in the special conditions of contract shall be one of
the major factors in consideration of the bids.
39.4 The owner reserves the right to request for a change in the work schedule during pre-
award discussions with successful bidder.
39.5 The successful bidder will be required to prepare detailed PERT Network/ detailed M.S.
Project Bar chart and finalize the same with the owner as per the requirement of Clause
Seal & Signature of Bidder
40.0 TIME – THE ESSENCE OF CONTRACT
40.1 The time and the date of completion of the Contract as stipulated in the Contract by the
Owner without or with modifications, if any, and so incorporated in the Letter of Award,
shall be deemed to be the essence of the Contract. The Contractor shall so organize his
resources and perform his work as to complete it not later than the date agreed to.
40.2 The Contractor shall submit a detailed PERT network/bar chart within the time frame
agreed consisting of adequate number of activities covering various key phases of the
work such as design, procurement, manufacturing, shipment and field erection activities
within fifteen (15) days of the date of Notification of Award. This network shall also
indicate the interface facilities to be provided by the Owner and the dates by which such
facilities are needed. The Contractor shall discuss the network so submitted with the
Owner and the agreed network shall form part of the Contract documents. During the
performance of the Contract, if in the opinion of the Engineer, proper progress is not
maintained, suitable changes shall be made in the Contractor’s operations to ensure
proper progress without any cost implication to the Owner. The interface facilities to be
provided by the Owner in accordance with the agreed network shall also be reviewed
while reviewing the progress of the Contractor.
40.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by
the Contractor as directed by the Engineer.
40.4 Subsequent to the finalization of the network, the Contractor shall make available to the
Engineer a detailed manufacturing programme in line with the agreed Contract network.
Such manufacturing programme shall be reviewed, updated and submitted to the
Engineer every month thereafter.
40.5 The above bar charts/manufacturing programme shall be compatible with the Owner’s
computer environment and furnished to the Owner on such media as may be desired by
40.6 If the progress is found low, GETCO reserves the right to get the work executed through
any other agency at the risk & cost of contractor without assigning any reason(s) and/or
41.0 PENALTY FOR DELAY:
41.1 The tenderer should note that the completion time allowed for carrying out the
work should be strictly observed. Any delay that may take place in supply,
erection and civil beyond Contractual period stated shall be subject to the
penalty at the rate of ½ % per week or part there of plus GST as applicable
on delayed portion, with a ceiling of 10 % of the total contract value plus
GST as applicable. For calculating the delayed portion date of actual
receipt of material at store shall be considered.
41.2 The penalty plus GST as applicable will be deducted from bills payable either
against this contract or from any Bank Guarantee or any other amount payable
under any other contract with the GETCO
41.3 In event of failure of the contractor to pay the amount of penalty as demanded, the owner
shall be entitled to deduct the amount of penalty for delay from the amounts
Seal & Signature of Bidder
payable to the contractors under any bills raised under this contract or any other
amount payable under any other contract with the GUVNL and its Subsidiary
companies i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL. It is
permissible for the owner to adjust the amount of penalty of delay against any Bank
Guarantee furnished by the contractor under this contract or any other contract with
GUVNL and/or its subsidiary companies.
“RIGHTS OF THE OWENER:
Whenever any claim or claims for payment of a sum of money arises out of or under the
contract against the contractor, the owner shall be entitled to withhold and also have a
lien to retain such sum or sums in whole or in part from the security, if any, deposited by
the contractor and for the purpose aforesaid, the Owner shall be entitled to encash and
withhold the amount of performance Bank Guarantee or other security, if any, furnished
as the case may be. The Owner shall also have a lien over the same pending finalization
or adjudication of any such claim. In the event of the security is insufficient to cover the
claimed amount or amounts, the Owner shall be entitled to withhold and have lien to
retain to the extent of the such claimed amount or amounts referred to above, from any
sum or sums found payable or which at any time-thereafter may become payable to the
contractor under the same contract or any other contract with the owner or GUVNL or
its Subsidiary companies pending finalization or adjudication of any such claim.
Lien in respect of claims in other contracts:
a) Any sum of money due and payable, to the contractor (including the security deposit)
under the contract may be withheld or retained by way of lien by the Owner against any
of its claim in respect of payment of a sum of money arising out of or under any other
contract made by the Contractor with the Owner or GUVNL or any of its subsidiary
b) It is an agreed that the sum of money so withheld or retained under this clause by the
Owner will be kept withheld or retained as such by the Owner till its claim arising out of
the same contract or any other contract is either mutually settled or determined by the
arbitrator or competent court, as the case may be, and the Contractor shall have no claim
for interest or damages whatsoever on this account or on any other ground in respect of
any sum of money withheld or retained under this clause and as may be duly notified to
the contractor.”
41.4 Tenderer shall have to supply all materials to match with the erection activities.
41.5 If the Contractor fails to successfully complete the commissioning within the time
fixed under the Contract, the Contractor shall pay to the Owner as penalty plus
GST as applicable a sum specified for each specified period of delay.
41.6 Equipment and materials will be deemed to have been delivered only when all its
components, parts are also delivered. If certain components are not delivered in time
the equipment and materials will be considered as delayed until such time the missing
parts are also delivered.
Seal & Signature of Bidder
41.7 For the purpose of penalty, contractual obligation shall be completion of all the Civil,
supply and erection contracts as per time schedule & value of these contracts shall be
“total contract value” (Sum of three individual contract value) for the working of penalty
in line with above relevant cl. No.41.1
42.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
42.1 In case the Contractor’s performance is delayed due to any act of omission on the part
of the Owner or his authorized agents, then the Contractor shall be given due extension
of time for the completion of the Works, to the extent such omission on the part of the
Owner has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the
Engineer shall be final.
42.2 In addition, the Contractor shall not be entitled to any claim whether demonstrable or
reasonable compensation if such delays have resulted in any increase in cost
43.0 Presentation of Bills
43.1 For supply : Monthly Bills for supply items for 80% value i.e. Ex-Works price with
100% F&I and GST in original with one copy shall be submitted to Dy. CAO
(Bills), at Corporate Office for passing and processing for payment at Corporate
Office. One copy of such bill is to be submitted to Engineer in-charge i.e.
concerned EE(Const) for their record & preparation of all relevant documents
For necessary payment against each consignment of material along with 100%
taxes, duties, F & I shall be duly recorded in the form of TRC & SR note by the field
office, which shall be now uploaded on Vendor Management System (VMS) Portal,
www.vms.guvnl.com including invoice, documents which are digitally signed by
Vendors / Suppliers. The supporting documents duly signed, stamped and
scanned are required to be uploaded. The VMS portal also provides ‘real time’
tracking of invoice status, to monitor the process of submissions and to receive
43.2 10% payment out of balance 20% shall be released on completion of Sub –Station work,
handing over and acceptance by the Site Engineers in charge after rectification work if
any and settlement of material account according to actual quantity utilized for
completion of work. Bill for this payment shall be raised to Dy. CAO (Bills), Corporate
Office with copy to concern Ex. Engr.(Const).
43.3 Balance 10% payment for supply shall be released only after finalization of material
account and passing of final bill only. The contractor has to submit the final bill along
with the material consumption statement and other required data of the work carried out
within 3 months from the date of completion of work.
43.4 For Erection & Civil works: Monthly R.A Bills for erection 90% value of work
executed and GST in original with one copy shall be submitted to concerned
EE(Const) for passing and processing for payment.
43.5 Balance 10% payment for erection shall be released only after finalization of material
account and passing of final bill only. The contractor has to submit the final bill along
Seal & Signature of Bidder
with the material consumption statement and other required data of the work carried out
within 3 months from the date of completion of work.
43.6 All the bills in accordance with the above clauses must be submitted with the following
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
43.7 For non-submission or part submission of above information, an additional 5% amount
of the respective RA bill shall be withheld and shall only be released at the time of final
CONTRACT SECURITY AND PAYMENTS
44.1 The payment to the Contractor for the performance of the works under the Contract will
be made by the Owner as per the guidelines and conditions specified herein. All
payments made during the Contract shall be on account payments only. The final
payment will be made on completion of all Works and on fulfillment by the Contractor of
all his liabilities under the Contract.
44.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
44.3 Further the payment shall be subject to fulfilling of following conditions:
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess
Act and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill as well as the final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and
evidence of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
45.0 Payment Schedule
Seal & Signature of Bidder
The tender BOQ is indicative. Supply & Erection of quantities shall be as per approved
Drgs. & BOQ and excess shall not be accepted.
45.1 Application for Payment
The Contractor shall submit application for the payment.
45.2 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed
at Site and of the equipment shipped/brought on to the site pursuant to the Contract up
to the date mentioned in the application and for the period covered since the last
preceding certificate, if any.
45.3 Every interim payment certificate shall certify the Contract value of the Works executed
up to the date mentioned in the application for the payment certificate, provided that no
sum shall be included in any interim payment certificate in respect of the works that,
according to the decision of the Engineer, does not comply with the Contract.
45.4 Mode of Payment
45.5 Payment due on dispatch of equipment shall be made by the Owner through Owner’s
Bank or directly to the Contractor as per the payment schedule.
45.6 The payment of test charges, if any, payment, taxes and duties (whenever admissible)
inland transportation (including port handling), insurance and the erection portion of the
Works shall be made direct to the Contractor by the Owner.
45.7 All payments under the Contract shall be made as stipulated in the Contract after signing
the Contract Agreement. The payments linked with the dispatch of materials shall only
be made after production of all dispatch documents as specified in the relevant Contract
conditions which will interalia include the Material Inspection Clearance Certificate
issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of
certificates by the Engineer, one for the quantum of work completed and the other for
the successful completion of quality check points involved in the quantum of work billed.
45.8 Billing and breakup: Price breakup for supply items will be considered only for billing
purpose & not for actual payment. Payment for equipments supplied shall be released
45.9 Inland Transportation & Insurance
Inland transportation (including port handling) and inland insurance charges shall be
paid to the Contractor on pro-rata to the value of the equipment received at site and on
production of the invoices by the Contractor. However, wherever equipment wise inland
transportation charges have been called for in the ‘Bid Proposal Sheets’ and have been
furnished by the Contractor, the payment of inland transportation charges shall be made
after receipt of equipment at site based on the charges thus identified by the Contractor
in his Proposal and incorporated in the Contract. The aggregate of all such pro-rata
payments shall however not exceed the total amount quoted by the Bidder in his bid and
payments shall however not exceed the total amount quoted by the Bidder in his bid and
incorporated in the Contract.
Seal & Signature of Bidder
46.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by the
Owner. All such claims shall be billed by the Owner to the Contractor regularly as and
when they fall due. Such bills shall be supported by appropriate and certified vouchers
or explanations, to enable the Contractor to properly identify such claims. Such claims
shall be paid by the Contractor within thirty (30) days of the receipt of the corresponding
bills and if not paid by the Contractor within the said period, the Owner may then deduct
the amount, from any monies due or becoming due by him to the Contractor under the
Contract or may be recovered by sections of Law or otherwise.
47.0 Terms of Payment
The payment for materials to be supplied and erected shall be made as under only after
execution of the contract documents/furnishing of Security Deposit and on execution of
substation work.
47.1 For supply
(i) 80% of supply value for each consignment of Sub-Station material including
accessories on submission of invoice along with 100% GST, duties, F & I shall
be paid from corporate office within 30 days from actual material receipt date
mentioned in SR Note after verifying the following documents.
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter wherever applicable.
E. E Way Bill, if applicable
(ii) 10% payment out of balance 20% shall be released from corporate office within
30 days on completion of Sub –Station work, handing over and preliminary
acceptance certificate issued by the Site Engineers in charge after rectification
work if any and settlement of material account according to actual quantity
utilized for completion of S/S. Supply to be made as per approved drawing/ BOQ
(iii) Balance10% of supply value shall be paid from corporate office on successful
commissioning of Sub-Station against completion certificate and only after
settlement of material account statement of items supplied, used, erected and
successful commissioning is settled for complete job and will be released within
30 days only after passing of final bill.
47.2 For erection and Civil works.
(i) 90% payment of amount claimed covering various activities such as excavation,
foundation, erection, earthing, stringing of bus bar and earthwire including
insulator hoisting works against R.A. bills duly certified by EIC within 30 days
from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid within 30 days against commissioning
of Sub-Station only after settlement of material account statement of items supplied,
used, erected and successful commissioning of Sub-Station line the same amount will
be release in final bill only and payment will be made only after passing of final bill.
Seal & Signature of Bidder
(ii) If net payable amount is more than Rs 5.0 Lacs, payment will be released from
circle office/corporate office.
(iii) Welfare Cess
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess
Act and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill as well as the final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and
evidence of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities
48.0 TAKING DELIVERY AND INSURANCE:
48.1 The contractor has to keep S/S materials in safe custody and transport to the respective
sites and will be fully responsible for any damage to or loss of all materials at any stage
during transportation or erection till taking over of the S/S by GETCO.
48.2 The Contractor has to open site store and ensure for safe custody of all the stored
materials at his own cost.
48.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over by
48.4 STORAGE-CUM-INSURANCE: -The contractor shall take suitable storage-cum-erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required
to complete the S/S. Contractor shall have to take comprehensive insurance policy against
any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the S/S by GETCO. The Contractor shall
deal directly and pursue the claim with the Insurance Company and shall be responsible in
regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful Contractor shall be furnished to Engineer-
In-Charge. In absence of the above insurance policy, R.A. Bill payment will be withheld.
48.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items, materials
and the GETCO shall be kept informed about it. Contractor shall replace the lost / damaged
materials / items promptly irrespective of the settlement of the claims by underwriter and
ensure that the work progress is as per agreed schedule. The loss, if any, such replacement
Seal & Signature of Bidder
will have to be borne by the Contractor and GETCO will not entertain any claim /
representation in this regard. However, it will be contractor's responsibility to insure the
entire Project till the S/S is taken over by the GETCO.
49.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid
price shall include all the costs in fulfilling all the insurance liabilities under the Contract.
49.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests
of the Owner against all perils detailed herein. The form and the limit of such insurance
as defined herein together with the under-writer in each case shall be acceptable to the
Owner. However, irrespective of such acceptance, the responsibility to maintain
adequate insurance coverage at all time during the period of Contract shall be of
Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of
his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor
shall, however, be authorized to deal directly with Insurance Company or Companies
and shall be responsible in regard to maintenance of all insurance covers. Further the
insurance should be in freely convertible currency.
49.2 Any loss or damage to the equipment during handling, transportation, storage, erection,
putting into satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or
lost. The transfer of title shall not in any way relieve the Contractor of the above
responsibilities during the period of Contract. The Contractor shall provide the Owner
with copy of all insurance policies and documents taken out by him in pursuance of the
Contract. Such copies of documents shall be submitted to the Owner immediately after
such insurance coverage. The Contractor shall also inform the Owner in writing at least
sixty (60) days in advance regarding the expiry/cancellation and/or change in any of
such documents and ensure revalidation, renewal etc., as may be necessary well in
49.3 The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation
risks, loss or damage in transit, theft, pilferage, earth quake, riot and strikes and
malicious damages, civil commotion, weather conditions, accidents of all kinds, etc. The
scope of such insurance shall be adequate to cover the replacement/reinstatement cost
of the equipment for all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the
extent of insurance cover and the amount of claim available from the underwriters, the
Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per Project requirements.
49.4 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the Owner may
from time to time, during the pendency of the Contract, ask the Contractor in writing to
limit the insurance coverage, risks and in such a case, the parties to the Contract will
agree for a mutual settlement, for reduction in Contract price to the extent of reduced
premia amount. The Contractor, while arranging the insurance shall ensure to obtain all
Seal & Signature of Bidder
discounts on premia which may be available for higher volume or for reason of financing
arrangement of the PROJECT.
49.5 The clause entitled ‘Insurance’, covers the additional insurance requirements for the
portion of the works to be performed at the Site.
50.0 Contract Quality assurance:
50.1 The Bidder shall include in his proposal the Quality Assurance Programme containing
the overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
50.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be
followed for the execution of the Contract will be mutually discussed and agreed and
such agreed Programme shall form a part of the Contract.
50.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items
are being supplied. Such details shall be accompanied by their list of previous supplies
made performance reports etc. However, in case of orders are placed, specific approval
shall be obtained from the owner for the vendor supplied materials. The quality
assurance program shall be furnished for each material separately for approval.
51.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles etc. which he proposes to bring to site for the purpose of
erection, handling, testing and commissioning including performance and guarantee
tests of the equipment. However such tools tackles brought to the site for purpose of
erection, handing testing & commissioning shall remain property of the contractor and
can be taken back after completion of the work.
52.0 Brand Names:
52.1 The specific reference in these specifications and documents to any material/equipment
by brand name make or catalogue number shall be construed as establishing standards
of quality and performance and not as limiting competition. However, Bidders may offer
other similar material/equipment provided they meet the specified standard, design and
performance requirements. The Bidder shall furnish adequate technical information
about such alternative material equipment to enable the Owner to determine its
acceptability. The Owner shall be the sole judge on the acceptability or otherwise of such
alternatively material/equipment.
52.2 The bidder shall note that standards for workmanship material and equipment, and
reference to brand name of catalogue numbers designed by the Owner in its Technical
Specifications are intended to be descriptive only and not restrictive. The Bidder may
substitute alternative standards, brand name and/or catalogue numbers in its bid,
provided that it demonstrates to the Owner’s satisfaction that the substitutions are
substantially equivalent or superior to those designed in the Technical Specification.
53.0 CONTRACT DOCUMENTS
53.1 The term Contract Documents shall mean and include the following which shall be
deemed to form an integral part of the Contract:
Seal & Signature of Bidder
a) Invitation to Bid including letter forwarding the Bidding Documents, General Terms
and Conditions of Contract and all other documents included under Part I and the
Special Conditions of Contract.
b) Specifications of the equipment to be furnished and erected under the Contract as
brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters
of clarifications thereto between the Contractor and the Owner prior to the Award
of Contract except to the extent of repugnancy.
d) All the materials, literature, data and information of any sort given by the Contractor
along with his bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and
special terms and conditions of Contract, if any.
53.2 In the event of any conflict between the above mentioned documents the matter shall be
referred to the Engineer whose decision shall be considered as final and binding upon
54.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
54.1 The Contractor shall not, without the Owner’s prior written consent, disclose the
Contract, or any provision thereof, or any specification, plan, drawing, pattern, sample
or information furnished by or on behalf of the Owner in connection therewith, to any
person other than a person employed by the Contractor in the performance of the
Contract. Disclosure to any such employed person shall be made in confidence and shall
extend only so far as may be necessary for the purpose of such performance.
54.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the
purpose of performing the Contract.
54.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or
in any other medium, photographs or other reproduction of the Works under this
Contract, or descriptions of the site, dimensions, quantity, quality or other information,
concerning the works unless prior written permission has been obtained from the Owner.
54.4 Any document, other than the Contract itself, enumerated in various Contract documents
shall remain the property of the Owner and shall be returned (in all copies) to the Owner
on completion of the Contractor’s performance under the Contract if so required by the
55.0 CONSTRUCTION OF THE CONTRACT
55.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to
be entered into will be treated as a works contract for Civil, Supply and Erection
work. However, Separation of the Contract into Supply of Goods, Services and
Civil Work, is only for convenience and better economical management and for
the ease of Accountancy but the entire Contract, is to be assessed under GST
Law, as a contract for composite supply under the category of Works Contract,
which is, as per the provisions of Section 2(30), read with, Section 2(119), further
Seal & Signature of Bidder
read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act,
2017 and similar provisions, applicable under the UTGST Act, 2017and the IGST
Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of
9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification
Codes for different segments or portions of the Works Contract, may be specified
separately, in the Supplies, with a final common Classification Code of Works
Contract Service.
55.2 In case of divisible supply and erection Contract, or where the Owner hands over his
equipment to the Contractor for executing, then the Contractor shall at the time of taking
delivery of the equipment/dispatch documents be required to execute an Indemnity Bond
in favour of the Owner in the form acceptable to the GETCO for keeping the equipment
in safe custody and to utilize the same exclusively for the purpose of the said Contract.
Samples of proforma for the Indemnity Bond will be furnished during award of Contract.
55.3 The Contract shall in all respects be construed and governed according to Indian Laws.
55.4 It is clearly understood that the total consideration for the Contract(s) has been broken
up into various components only for the convenience of payment under the Contract(s)
and for the measurement of deviations or modifications under the Contract(s).
56.0 JURISDICTION OF CONTRACT
56.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of
Vadodara shall have exclusive jurisdiction in all matters arising under this Contract.
57.0 EXECUTION OF CONTRACT:
57.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy
of the final agreement to the Contractor for his scrutiny and approval.
57.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the
acceptance of the Letter of Award, at the office the Owner at Vadodara on a date and
time to be mutually agreed. The Contractor shall provide for signing of the Contract,
Performance Guarantee, appropriate power of attorney and other requisite materials. In
case the Contract is to be signed beyond the stipulated time, the Bid Guarantee
submitted with the Proposal will have to be extended accordingly.
57.3 The Agreement will be signed in copies to be specified and the Contractor shall be
provided with one signed original and the rest will be retained by the Owner.
57.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings,
and descriptive materials submitted with the bid including soft copy, to form a part of the
Contract immediately after issue of Letter of Award .
57.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the
Owner with copies of agreement within fifteen (15) days after the signing of the
58.0 ENFORCEMENT OF TERMS
58.1 The failure of either party to enforce at any time any of the provisions of this Contract or
any rights in respect thereto or to exercise any option therein provided, shall in no way be
Seal & Signature of Bidder
construed to be a waiver of such provisions, rights or options or in anyway to affect the
validity of the Contract. The exercise by either party of any of its rights herein shall not
preclude or prejudice either party from exercising the same or any other right it may have
under the Contract.
59.0 COMPLETION OF CONTRACT
59.1 Unless otherwise terminated under the provisions of any other relevant clause, this
Contract shall be deemed to have been completed on the expiry of the guarantee period
as provided for under the clause entitled ‘Guarantee’
60.0 REPLACEMENT OF DEFECTIVE PARTS AND MATERIALS
60.1 If during the performance of the Contract, the Engineer shall decide and inform in writing
to the Contractor that the Contractor has manufactured any equipment, material or part
of equipment unsound and imperfect or has furnished any equipment inferior to the
quality specified, the Contractor on receiving details of such defects or deficiencies shall
at his own expense within seven (7) days of his receiving the notice, or otherwise, within
such time as may be reasonably necessary for making it good, proceed to alter,
reconstruct or remove such works and furnish fresh equipment/materials up to the
standards of the specifications. In case, the Contractor fails to do so, the Engineer may
on giving the Contractor seven (7) day notice in writing of his intentions to do so, proceed
to remove the portion of the works so complained of and at the cost of the Contractor
perform all such Works or furnish all such equipment/ material provided that nothing in
this clause shall be deemed to deprive the Owner of or affect any rights under the
Contract which the Owner may otherwise have in respect of such defects and
60.2 The Contractor’s full and extreme liability under this clause shall be satisfied by the
payment to the Owner of extra cost, of such replacement procured including erection as
provided for in the Contract, such extra cost being the ascertained difference between
the price paid by the Owner for such replacements and the Contract Price by portion for
such defective equipment/materials/works and repayments of any sum paid by he
Owner to the Contractor in respect of such defective equipment/material. Should the
Owner not so replace the defective equipment/materials the Contractor’s extreme
liability under this clause shall be limited to repayment of all sums paid by the Owner
under the Contract for such defective equipment/materials.
61.0 PATENT RIGHTS AND ROYALTIES
Royalties and fees for patents covering materials, articles, apparatus, devices,
equipment or processes used in the works shall be deemed to have been included in
the Contract Price. The Contractor shall satisfy all demands that may be made at any
time for such royalties or its and he alone shall be liable for any damages or claims for
patent infringements and shall keep the Owner indemnified in that regard. The
Contractor shall, at his own cost and expense, defend all suits or proceedings that may
be instituted for alleged infringement of any patents involved in the Works, and, in case
of an award of damages, the Contractor shall pay for such award. In the event of any
suit or other proceedings instituted against the Owner, the same shall be defended at
the cost and expense of the Contractor who shall also satisfy/comply with any decree,
order or award made against the Owner. But it shall be understood that no such
machine, plant, work, material or thing has been used by the Owner for any purpose or
any manner other than that for which they have been furnished and installed by the
Contractor and specified under these specifications. Final payment to the Contractor by
Seal & Signature of Bidder
the Owner will not be made while any such suit or claim remains unsettled. In the event
any apparatus or equipment, or any part thereof furnished by the Contractor, is in such
suit or proceedings held to constitute infringement, and its use is enjoined, the Contractor
shall at his option and at his own expense, either procure for the Owner, the right to
continue the use of said apparatus, equipment or part thereof, replace it with non-
infringing apparatus or equipment or modify it, so it becomes non-infringing.
62.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of
the Owner, for the failure, omission or neglect on the part of the Contractor to perform
any acts, matters, covenants or things under the Contract, or for damage or injury
caused by the alleged omission or negligence on the part of the Contractor, his agents,
representatives or his Sub-Contractors, or in connection with any claim based on lawful
demands of Sub-Contractors, workmen, suppliers or employees, the Contractor shall in
all such cases indemnify and keep the Owner, and the Engineer and/or his
representative, harmless from all losses, damages, expenses or decrees arising of such
63.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of
the Contractor from all his liabilities under the Contract. Such final payment shall be
made only at the end of the Guarantee/Warranty period, and till such time as the
Contractual liabilities and responsibilities of the Contractor, shall prevail. All other
payments made under the Contract shall be treated as on-account payments. The
aggregate liabilities are limited up to the total contract value.
64.0 ENGINEER’S DECISION
64.1 In respect of all matters which are left to the decision of the Engineer including the
granting or with-holding of the certificates, the Engineer shall, if required to do so by the
Contractor, give in writing a decision thereon.
64.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance
with the meaning and intent of the Contract, the Contractor may file with the Engineer,
within fifteen (15) days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance
of the Engineer’s decision and the decision shall become final and binding.
64.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there
shall be no delay in the execution of the works and the decision of the Engineer as
rendered shall be promptly observed.
65.0 POWER TO VARY OR OMIT WORK
65.1 No alterations, amendments, omissions, suspensions or variations of the Works
(hereinafter referred to as ‘variation’) under the Contract as detailed in the Contract
Documents, shall be made by the Contractor except as directed in writing by the
Engineer, but the Engineer shall have full powers subject to the provisions hereinafter
contained, from time to time during the execution of the Contract, by notice in writing to
instruct the Contractor to make such variation without prejudice to the Contract. The
Seal & Signature of Bidder
Contractor shall carry out such variation and be bound by the same conditions as far as
applicable as though the said variations occurred in the Contract Documents. If any
suggested variations would, in the opinion of the Contractor, if carried out, prevent him
from fulfilling any of his obligations or guarantees under the Contract, he shall notify the
Engineer thereof in writing and the Engineer shall decide forthwith whether or not, the
same shall be carried out and if the Engineer confirms his instructions, the Contractor’s
obligations and guarantees shall be modified to such an extent as may be mutually
agreed. Any agreed difference in cost occasioned by any such variation shall be added
to or deducted from the Contract Price as the case may be.
65.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be
given to the Contractor to enable him to work his arrangement accordingly, and in cases
where goods or materials are already prepared or any design, drawings or pattern made
or work done as per the contract requires to be altered, a reasonable and agreed sum
in respect thereof shall be paid to the Contractor.
65.3 In any case in which the Contractor has received instructions from the Engineer as to
the requirement of carrying out the alterations or additional or substituted work which
either then or later on, will in the opinion of the Contractor, involve a claim for additional
payment, the Contractor shall immediately and in no case later than thirty (30) days,
after receipt of the instructions aforesaid and before carrying out the instructions, advise
the Engineer to that effect. But the Engineer shall not become liable for payment of any
charges in respect of any such variations, unless the instructions for the performance of
the same shall be confirmed in writing by the Engineer.
65.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree,
in writing, so to the extent of any change in the price, before the Contractor proceeds
with the change.
65.5 In all the above cases, in the event of a disagreement as to the reasonableness of the
said sum, the decision of the Engineer shall prevail.
65.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full
power to instruct the Contractor, in writing, during the execution of the Contract to vary
the quantities of the items or groups of items in accordance with the provisions of clause
entitled ‘Change of Quantity’ in section GCC. The Contractor shall carry out such
variations and be bound by the same conditions as though the said variations occurred
in the Contract Documents. However, the Contract Price shall be adjusted at the rates
and the prices provided for the original quantities in the Contract.
66.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT
66.1 The Contractor may, after informing the Chief Engineer (Project) & getting written
approval, assign or sub-let the Contract or any part thereof other than for raw material,
for minor items or for any part of the plant for which makes are identified in the Contract.
Suppliers of the equipment not identified in the Contract or any change in the identified
suppliers shall be subject to approval by the Chief Engineer. The experience of
equipment vendors under consideration by the Contractor for this Contract shall be
furnished to the Chief Engineer for approval prior to procurement of all such
items/equipment. Such assignment/sub-letting shall not relieve the Contractor from any
obligation, duty or responsibility under the Contract. Any assignment as above, without
prior written approval of Chief Engineer, shall be void.
Seal & Signature of Bidder
In case of Erection activity, the contractor may after getting written approval from
CE(Project), assign or sublet any part of erection or as a whole . To do so contractor
have to apply for such subletting with a clear proposal stating details & experience of the
subletting agency, along with the tender or within 30 days from the date of LOI & decision
thereof will be conveyed within 30 days thereafter by GETCO. The proposed erection
agency shall have experience of executing similar job of voltage class of 66Kv & above
and value equivalent to erection portion during last five years. The decision of competent
authority in this regard shall remain final and binding to the agency.
66.2 For components/equipment procured by the Contractor for the purposes of the Contract,
after obtaining the written approval of the Owner, the Contractor’s purchase
specifications and enquiries shall call for quality plan to be submitted by the suppliers
along with their Proposals. The quality plans called for from the Vendors shall set out,
during the various stages of manufacture and installation, the quality practices and
procedures followed by the Vendors’ quality control organization, the relevant reference
document/standard used, acceptance level, inspection documentation raised, etc. Such
quality plans of the successful vendors shall be discussed and finalized in consultation
with the Engineer and shall form a part of the Purchase Order/Contract between the
Contractor and the Vendor. Within three weeks of the release of the Purchase
Orders/Contracts for such bought out items/components a copy of the same without
price details but together with detailed purchase specifications, quality plans and delivery
conditions shall be furnished to the Engineer by the Contractor.
67.0 CHANGE OF QUANTITY
67.1 During the execution of the Contract, the Owner reserves the right to increase or
decrease the quantities of items under the Contract but without any change in unit price
or other terms & conditions. Such variations unless otherwise specified in the
accompanying GCC and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the
Contract shall be limited to the extent of 30%(Thirty Percent) of the contract price by way
of suitable amendment to the contract.
67.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, In case the
unit rates are not available for the change in quantity, the same shall be subjected to
mutual agreement.
67.3 As this is an EPC contract, Design will be done by the Contractor. Responsibility of
material will be that of the contractor.
68.0 PACKING, FORWARDING AND SHIPMENT
68.1 The Contractor, wherever applicable, shall after proper painting, pack and crate all
equipment in such a manner as to protect them from deterioration and damage during
rail and road transportation to the Site and storage at the Site till the time of erection.
The Contractor shall be held responsible for all damages due to improper packing.
68.2 The Contractor shall notify the Owner of the date of each shipment from his works, and
the expected date of arrival at the Site for the information of the Owner.
68.3 The Contractor shall also give all shipping information concerning the weight, size and
content of each packing including any other information the Owner may require.
Seal & Signature of Bidder
68.4 The following documents shall be sent by registered post to the Owner within three days
from the date of shipment, to enable the Owner to make progressive payments to the
Application for payment in the standard format of the Owner
Pre-dispatch clearance certificate, if any
Test Certificate, wherever applicable
Insurance Certificate
68.5 The Contractor shall prepare detailed packing list of all packages and containers,
bundles and loose materials forming each and every consignment dispatched to Site.
The Contractor shall further be responsible for making all necessary arrangements for
loading, unloading and other handling right from his works up to the Site and also till the
equipment is erected, tested and commissioned. He shall be solely responsible for
proper storage and safe custody of all equipment.
69.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and
Consulting Engineers and freely exchange with them such technical information as is
necessary to obtain the most efficient and economical design and to avoid unnecessary
duplication of efforts. The Engineer shall be provided with three copies of all
correspondence addressed by the Contractor to other Contractors and Consulting
Engineers of the Owner in respect of such exchange of technical information, wherever
70.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees,
or agents nor any order by the Owner or the Engineer for payment of money or any
payment for or acceptance of, the whole or any part of the Works by the Owner or the
Engineer, nor any extension of time, nor any possession taken by the Engineer shall
operate as a waiver of any provision of the Contract, or of any power herein reserved to
the Owner or any right to damages herein provided nor shall any waiver of any breach
in the Contract be held to be a waiver of any other or subsequent breach.
71.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE
No interim payment certificate of the Engineer, nor any sum paid on account by the
Owner, nor any extension of time for execution of the Works granted by the Engineer
shall affect or prejudice the rights of the Owner against the Contractor or relieve the
Contractor of his obligation for the due performance of the Contract, or be interpreted as
approval of the Works done or of the equipment furnished and no certificate shall create
liability for the Owner to pay for alterations, amendments, variations or additional works
not ordered, in writing , by the Engineer or discharge the liability of the Contractor for
the payment of damages whether due, ascertained, or certified or not or any sum against
the payment of which he is bound to indemnify the Owner, nor shall any such certificate
nor the acceptance by him of any sum paid on account or otherwise affect or prejudice
the rights of the Owner against the Contractor.
72.0 PROGRESS REPORTS
Seal & Signature of Bidder
During the various stages of the work in pursuance of the Contract, the Contractor shall
at his own cost submit periodic progress reports as may be reasonably required by the
Engineer with such materials as, in approved MS PROJECT ,charts, net-works,
photographs, test certificates, etc. Such progress reports shall be on monthly base for
supply items & fortnightly for erection activities in the form and size as may be required
by the Engineer.
73.0 TAKING OVER
Upon successful completion of all the tests and commissioning by the Contractor, the
Engineer shall issue to the Contractor a Taking Over Certificate (TOC) as a proof of the
final acceptance of the equipment. Such certificate shall not unreasonably be withheld
nor will the Engineer delay the issuance thereof on account of minor omissions or defects
which do not affect the commercial operation and/or cause any serious risk to the
equipment. Such certificate shall not relieve the Contractor of any of his obligations
which otherwise survive, by the terms and conditions of the Contract after issue of such
In the event of completion of pre commissioning tests carried out jointly, if energization
of the substation is prevented for reasons not attributable to the successful bidder, the
Preliminary Acceptance Certificate shall be given within 30 days of pre commissioning
tests prior to Taking Over Certificate (TOC).
74.0 RISK DISTRIBUTION--TRANSFER OF TITLE
74.1 Transfer of title in respect of equipment and materials supplied by the Contractor to
GETCO pursuant to the terms of the Contract shall pass on to GETCO with negotiation
of dispatch documents.
74.2 This Transfer of Title shall not be construed to mean the acceptance and the consequent
“Taking Over” of equipment and materials. The Contractor shall continue to be
responsible for the quality and performance of such equipment and materials and for
their compliance with the specifications until “Taking Over” and the fulfillment of
guarantee provisions of this Contract.
74.3 This Transfer of Title shall not relieve the Contractor from the responsibility for all risks
of loss or damage to the equipment and materials as specified under the clause entitled
“Insurance” of this Section.
75.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant
until the successful completion of commissioning as defined elsewhere in the Bid
76.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
77.0 FORCE MAJEURE
77.1 Force majeure is herein defined as any cause which is beyond the control of the
Contractor or the Owner as the case may be, which they could not foresee or with a
Seal & Signature of Bidder
reasonable amount of diligence could not have foreseen and which substantially affects
the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war,
declared or undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause
notify the other in writing of such causes.
77.2 The Contractor or the Owner shall not be liable for delays in performing his obligations
resulting from any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable
time even though such cause may occur after Contractor’s performance of obligation
has been delayed due to other causes.
78.0 SUSPENSION OF WORK
78.1 The Owner reserves the right to suspend and reinstate execution of the whole or any
part of the Works without invalidating the provisions of the Contract. Orders for
suspension or reinstatement of the Works will be issued by the Engineer to the
Contractor in writing. The time for completion of the works will be extended for a period
equal to duration of the suspension.
78.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such
suspension of the works will be paid by the Owner, provided such costs are
substantiated to the satisfaction of the Engineer. The Owner shall not be responsible
for any liabilities if suspension or delay is due to some default on the part of the
Contractor or his Sub-Contractor.
79.0 CONTRACTOR`S DEFAULT
79.1 If the Contractor shall neglect to execute the works with due diligence and expedition or
shall refuse or neglect to comply with any reasonable order given to him, in writing by
the engineer in connection with the works or shall contravene the provisions of the
contract, the Owner may give notice in writing to the Contractor to make good the failure,
neglect or contravention complained of. Should the contractor fail to comply with the
notice within thirty (30) days from the date of serving the notice, then and in such case
the owner shall be at liberty to employ other workmen and forthwith to execute such part
of the works as the contractor may have neglected to do or if the Owner shall think fit,
without prejudice to any other right he may have under the contract to take the work
wholly or in part out of the Contractor’s hands and recontract with any other person or
persons to complete the works or any part thereof and in that event the Owner shall have
free use of all Contractor’s equipment that may have been at the time on the site in
connection with the works without being responsible to the Contractor for fair wear and
tear thereof and to the exclusion of any right of the contactor over the same, and If the
sum that the contractor is entitled to be paid plus the costs incurred by the Owner
in completing the works, exceeds the contract price or the entire works if entire
works have been completed or the price for part of the works if part of the works
have been completed, the contractor shall be liable for such excess.
Seal & Signature of Bidder
If such excess is greater than the sums due to the contractor, the contractor shall
pay the balance to the Owner and if such excess is less than the sums due to the
Contractor, Owner shall pay the balance to the Contractor. For facilitating such
payment, Owner shall encash the Bank Guarantees of Contractor available with
Owner/s and retain such other payments due to the contractor under the Contract
in question or any other Contract that the Owner/s may have with the Contractor.
Such payment of excess amount shall be independent of the liquidated damages for
delay which the Contractor shall have to pay if the completion of works is delayed.
79.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his
liability to pay liquidated damages for delay in completion of Works .
79.3 Such action by the Owner as aforesaid the termination of the Contract under this clause
shall not entitle the Contractor to reduce the value of the Contract Performance
Guarantee nor the time thereof. The Contract Performance Guarantee shall be valid for
the full value and for the full period of the Contract including guarantee period.
80.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
80.1 The Owner reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
Owner shall in such an event give fifteen (15) day notice in writing to the Contractor of
his decision to do so.
80.2 The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain cancellation of
all orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Owner, stop all further sub-contracting or purchasing activity related
to the work terminated, and assist Owner in maintenance, protection, and disposition of
the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable
and reasonable, dictated by the circumstances prevalent at the time of termination.
80.3 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless the Owner is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership,
the surviving partners, are capable of carrying out and completing the Contract the
Owner shall be entitled to cancel the Contract as to its in completed part without being
in any way liable to payment of any compensation to the estate of deceased Contractor
and/or to the surviving partners of the Contractor’s firm on account of the cancellation
of the Contract. The decision of the Owner that the legal representatives of the
deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and
complete the Contract shall be final and binding on the parties. In the event of such
cancellation the Owner shall not hold the estate of the deceased Contractor and/or the
surviving partners of the estate of the deceased Contractor and/or the surviving partners
of the Contractor’s firm liable to damages for not completing the Contract.
81.0 FRUSTRATION OF CONTRACT
81.1 In the event of frustration of the Contract because of supervening impossibility in terms
of Section 56 of the Indian Contract Act, parties shall be absolved of their responsibility
Seal & Signature of Bidder
to perform the balance portion of the Contract, subject to provisions contained in sub-
clause 84.3 below.
81.2 In the event of non-availability or suspension of funds for any reasons, whatsoever
(except for reason of willful or flagrant breach by the Owner) and/or Contractor then the
works under the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for
financing to the Contractor in accordance with the terms of the Contract within three
months of the event, the parties hereto shall be relieved from carrying out further
obligations under the Contract treating it as frustration of the Contract.
81.3 In the event referred to in sub-clauses 81.1& 81.2 above the parties shall mutually
discuss to arrive at reasonable settlement on all issues including amounts due to either
party for the work already done on quantum merit_ basis which shall be determined by
mutual agreement between the parties.
82.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of
the Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or
servant(s) or any one on his or their behalf in relation to the obtaining or to the execution
of this or any other Contract with the Owner, shall in addition to any criminal liability
which it may incur, subject the Contractor to the cancellation of this and all other
Contracts and also to payment of any loss or damage to the Owner resulting from any
cancellation. The Owner shall then be entitled to deduct the amount so payable from
any monies otherwise due to Contractor under the Contract.
Definition of terms:
“Tribunal” means the Gujarat Public Works Contracts Disputes Arbitration Tribunal
constituted under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
83.0 DISPUTE RESOLUTION MECHANISM
83.1 Amicable Settlement:
Any dispute, difference, controversy or claim between the Parties arising out of or relating
to this contract, including interpretation, breach, termination or validity (hereinafter
referred to as “Dispute”), shall, upon written request of either Party, be referred to the
authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good faith a resolution of
the Dispute within thirty (30) days of the service of the request.
83.2 Arbitration Under the Gujarat Public Works Contracts Disputes Arbitration Tribunal
If the Parties fail to amicably resolve the Dispute as per Clause 83.1 above, or if contrary
claims remain unresolved, then, notwithstanding anything to the contrary elsewhere in
the Contract, the same shall be referred to arbitration under the provisions of the Gujarat
Public Works Contracts Disputes Arbitration Tribunal Act, 1992 (hereinafter referred to
as “the Act”) as amended from time to time, and the rules framed thereunder. The
Seal & Signature of Bidder
decision, award and proceedings of the Tribunal shall be final, binding and conclusive
upon the parties, subject only to such remedies as may be available under the Act and
any other applicable law in force.
83.3 Continuity of Performance:
During the pendency of any Dispute or arbitration proceedings, both Parties shall
continue to perform their respective obligations under the Contract.
83.4 Non-Affectation of Powers:
Reference to any Dispute resolution procedure, including arbitration, shall not affect the
right of the Owner and/or Engineer-in-Charge to take possession of or utilize the
Contractor’s tools, plants, materials, stores or works as per the terms and conditions of
the Contract, nor shall it entitle the Contractor to stop the progress of work or affect the
Owner’s rights under the Contract to get work executed through alternate means, if so
required under the contract.
83.5 Limitation:
Neither Party shall be entitled to invoke dispute resolution or arbitration under this clause
later than thirty (30) days after the expiration of the defects liability period, unless
otherwise provided under the Act.
84.0 ARBITRATION
All arbitration matters are governed by Clause 83.0 above, in compliance with the
Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992 and GUVNL
84.1 All disputes or differences in respect of which the decision, if any, of the Engineer has
not become final or binding as aforesaid shall be settled by arbitration in the manner
hereinafter provided.
84.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the
Contractor and the Owner and the third to be appointed as an umpire by both the
arbitrators in accordance with the Indian Arbitration Act. If either of the parties fails to
appoint its arbitrator within sixty (60) days after receipt of a notice from the other party
invoking the Arbitration clause, the arbitrator appointed by the party invoking the
arbitration clause shall become the sole arbitrator to conduct the arbitration.
84.1.2 The arbitration shall be conducted in accordance with provisions of Indian Arbitration Act
1996 or latest amendment thereof.
84.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time
for making the award. In the event of any of the aforesaid arbitrators dying, neglecting,
resigning or being unable to act for any reason, it will be lawful for the party concerned
to nominate another arbitrator in place of the outgoing arbitrator.
84.3 The arbitrator shall have full powers to review and/or revise any decision, opinion,
direction, certification or valuation of the Engineer in accordance with the Contract, and
neither party shall be limited in the proceedings before such arbitrators to the evidence
or arguments put before the Engineer for the purpose of obtaining the said decision.
Seal & Signature of Bidder
84.4 No decision given by the Engineer in accordance with the foregoing provisions shall
disqualify him as being called as a witness or giving evidence before the arbitrators on
any matter whatsoever relevant to the dispute or difference referred to the arbitrators as
84.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged
to carry out their respective obligations under the Contract.
84.6 All questions, disputes or differences, whatsoever which may at any time arise between
the parties to this contract in connection with the contract or any matter arising out of or
in relation there to shall be referred to the “Gujarat public works contracts disputes
arbitration tribunal” as per the provisions of the Gujarat public works contracts disputes
arbitration tribunalact,1992.
The reference to arbitration proceedings under this clause shall not
a) Affect the right of the Engineer -in charge to take possession of all or any
tools, plants, materials and stores, in or upon the work or site therof or
belonging to the contractor or procured by him and intended to be used for the
execution of the work or any part thereof.
b) Preclude the Engineer-in charge from utilizing the materials purchased by the
Contractor in any work or from removing such materials to other place, during
the period the work is stopped or suspended in pursuance of notice given to
the contractor under General Conditions.
c) Entitle the contractor to stop the progress of the work or carrying out the additional
or altered work in accordance with the prevision of General Conditions for the work
where there is no specifications.
d) Preclude the GETCO from getting the work done by another agency.
Neither party is entitled to bring a claim to arbitration latest by thirty days after
the expiration of the defects liability period.
The provisions of the Arbitration Act,1992, Gujarat Public Works Contract
Disputes Arbitration Tribunal Act, 1992, and rules made there under shall
apply to the arbitration proceeding under this clause. “
85.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering
payments claimed and the payments received vis-à-vis the works executed, for
reconciliation of accounts with the Owner. The Contractor shall also prepare and submit
a detailed account of Owner Issue materials received and utilized by him for
reconciliation purpose in a format to be discussed & finalized with the Owner before the
award of Contract.
86.0 LABOUR LAWS:
86.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
86.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence
of such license, the contract shall be liable to be terminated without assigning any reason
Seal & Signature of Bidder
86.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the
GETCO indemnified in respect thereof. Some of the major liabilities under various labour
and industrial laws which the Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident
Fund, Family Pension Scheme, Deposit Linked Insurance Scheme,
Administrative charges, etc. at the rates made applicable from time to time by
the Government of Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or
later prevailing rate with the Office of Commissioner of Labour as per the
Contract Labour (Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition)
Act and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate
of one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto,
for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out of
any claim of disputes under the Industrial Disputes Act 1947 or any other Labour
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various labour laws, in force from time to time, from Statutory
Authorities like State Government/ Government o India, which the Contractor shall have
to comply with.
86.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee. Provident Fund and Family pension Scheme at the rate of
18% (or at the rate made applicable by the Government from time to time of the wages.
The Contractor’s contribution and his workers contribution towards Provident Fund and
Family Pension Scheme shall be deposited by the Contractor with Regional Provident
Fund Commissioner, Ahmedabad.
86.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is
a member of the Provident Fund, as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Ahmedabad.
86.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by
the Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates
Seal & Signature of Bidder
86.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour, shall be provided by the Contractor to his workers. He shall maintain Leave
Records, Leave Cards, for individual laborer which shall be duly verified, approved and
certified by the authorized Officer of the GETCO.
86.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY
The contractor shall cover all his employees under workmen’s compensation fund and
under the liability insurance. The purchaser shall not be responsible for any payments
of compensation to the workers/supervisor of the contractor for fatal or non-fatal
accidents during the pendency of the contract.
86.6 The contractor shall employ adequate number of experienced skilled at site for daily
supervision and for maintenance of various registers and records required under the law
and contract. No payment for supervision shall be admissible.
86.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever, arising out of or in connection with
the matters referred herein above elsewhere and against all actions, proceedings,
claims, demands, costs and expenses which may be made against the GETCO or
Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for
or in respect of performance of his obligation under the contract documents. The GETCO
shall not be liable for or in respect of or in consequence of any accident or injury to any
workman or other person in the employment of the Contractor or his Sub-Contractor and
the contractor shall indemnify and keep indemnified the GETCO against all claims,
demands, proceedings, cost, charges and expenses whatsoever in respect thereof or in
relation thereto.
86.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be effected for all the Contractor’s employee engages in the
performance of this contract. If any of the work is sublet, the Contractor shall required
the Sub-Contractor to provide workmen’s employer’s liability insurance for the latter’s
employees, such employees shall be covered under the Contractor’s Insurance.
86.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as
per rates fixed under the minimum wages act. The wages of every Contract
Labour employed by him under this contract shall also be paid by him before the
expiry of 7th day of the last day of the month in respect of the wages are payable
(i.e. wages of a month have to be paid by him in the first week of the next month).
Any default will result in cancellation of contract forthwith or else the contractor
shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so
that, in case of labour trouble etc. the Contractor can be contacted. The
Contractor shall arrange to have his office outside the factory work premises and
the Contractor shall arrange to have his office outside the factory work premises
and the Contractor shall keep himself present throughout the working hours.
Seal & Signature of Bidder
86.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken
ii) If the contractor does not possess separate P.F. code number of RPFC, his
tender will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by RPFC,
along with the tender.
87.0 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within
contractual period of delivery or in case the stores are found not in accordance with
prescribed specification and/or the approved sample, the GETCO shall exercise its
discretionary power either:
87.1 To recover, from the contractor as agreed, by way of penalty clause above, or
87.2 To purchase from elsewhere after giving due notice to the contractor on account and
at the risk of the contractor for such stores not so delivered or other similar
description without canceling the contract in respect of the consignment not yet due
for delivery or
88.00 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the
GETCO shall be final. In the event of action taken under clause above, the contractor
shall be liable to pay for any loss which the GETCO may sustain on that account,
but the contractor shall not be entitled to have any saving on such purchases made
against default.
The decision of the GETCO shall be final as regards to the acceptability of stores
supplied by the contractor and the GETCO shall not be required to give any reason
in writing or otherwise at any time for rejection of the stores.
89.0 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the
bidder has to reduce all the quoted rates proportionately. The reduction on overall
basis will not be accepted (i.e. all unit rates of erection schedule shall be reduced
proportionately by difference in percentage). The confirmation for matching end cost
shall be given within 7 (seven) days from the letter from GETCO.
90.0 VENDOR REGISTRATION:
All new bidders / Vendors have to register themselves with the GETCO by paying
Rs.10,000/- (Non-refundable) plus GST as applicable. Regular suppliers are
registered automatically looking to their performance. They shall have to fill up a
prescribed form attached herewith within two months giving basic details of their set
up, turn over, ISO certification, etc. However, they shall have to re-register by paying
Rs.10,000/-(Non-Refundable) plus GST as applicable after 05 years from
01/03/2001. Factory inspection for new entrants is a must. Factory inspection shall
be conducted for the period of every 2 years from where the supplier is supposed
to supply the materials. This new rule shall come in to force after 06 months from
01/03/2001 so that party gets enough time for registration. However in the meantime
all the New Vendors shall have to pay Rs.10,000/-(Non-refundable) plus GST as
applicable towards registration fees as explained above, before submission of bids
Seal & Signature of Bidder
and the proof of the same may be given with the technical bid otherwise tender will
be ignored out rightly.
Vendor registration upto tender value of Rs.1 Lac (One Lac) for the new entrant is
not required. However, Rs.1000/- plus GST as applicable towards Vendor
registration shall be payable for the tender value between Rs.1 Lac and including
upto Rs.5 Lacs. Vendor registration beyond Rs.5 lacs will be applicable and shall
have to pay Rs.10,000/- plus GST as applicable for new entrant as specified above.
If the New Vendors are already registered by paying of Rs.10,000/- (Non-
Refundable), then it is requested to please quote the Vendor Registration Number
date in Annexure–“X” which is attached with the tender and also enclose the copies
of Money Receipt and vendor registration letter in the EMD Cover.
If the tendered is new & not registered with the GETCO, then they should Pay
Rs.10,000/- plus GST as applicable before opening of the tender itself and the copy
of Money Receipt should be submitted in the EMD Cover, otherwise their tender will
be ignored without any further communication in the matter.
91.0 INTRODUCTION OF LEAVY OF TCS.
TCS @ 0.075% / 0.1% will be payable extra subject to fulfilment of the
conditionsof sub section (1H) of section 206C of Income Tax Act, 1961. The
format of undertaking is attached as schedule – 20 in the tender.
92.0 Deduction of TDS under GST:
“TDS under GST @ 2 % (1 % CGST & 1 % SGST or 2 % IGST, as applicable)
or at the applicable rate from time to time, will be deducted from the bill of the
Suppliers / Contractors at the time of credit or payment. TDS certificates in
the prescribed format will be issued as per prescribed rules under GST.”
93.0 INCOME TAX (TDS)
TDS under Income Tax will be deducted on purchase of goods by GETCO @ 0.1%
of the sum exceeding Rs. 50 lacs u/s 194Q from the bill of suppliers/contractors at the
time of credit or payment whichever is earlier. TDS will be deducted on advance payment
being also made by GETCO to supplier. Further in some of the cases, where TCS u/s
206 (1H) is applicable also along with TDS u/s 194Q, then only TDS on purchase of
Goods u/s 194Q shall be deductible, as TDS u/s 194Q overrides TCS u/s 206C (1H).
As per the Section 206AB of Income Tax Act, TDS under Income Tax will be
deducted at higher rates of the following rates: (non-fillers of ITRs for the past two
fiscal years will be subjected to higher TDS).
(a) At twice the rate specified in the relevant provision of the Act
(b) At twice the rates in force
(c) At the rate of 5%
94.0 Bidder should follow the GOI guideline of Restrictions under rule 144 (xi) of the General
Financial Rules (GFRs), 2017 vide office memorandum no. F.No.6/18/2019-PPD Dt:
23.07.2020. The copy of subject memorandum is attached in technical specification
Seal & Signature of Bidder
95. Responsibility for correctness of the information submitted in the bid lies with bidder. If any
information furnished in the bid is proved to be false at a later date, GETCO reserve right
to reject the bid and the bid will not only be rejected but the bidder will be BLACKLISTED
as per GUVNL Policy
96. Use of ‘Call Before u Dig’ (CBuD) mobile application:
Bidder is note that it is mandatory to use ‘Call Before u Dig’ (CBuD) mobile application for
all excavators prior to any type of excavation / digging
97. Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders for particular quoted
item. Such conflict of interest can lead to anti-competitive practices to the detriment
of Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or
more parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that
puts them in a position to have access to information about or influence on the bid of
another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a
bidder in more than one Bid will result in the disqualification of all bids in which the
parties are involved. However, this does not limit the inclusion of the components/
sub-assembly/ assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only one
agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
Seal & Signature of Bidder
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/ management, only
one unit should quote. Similar restrictions would apply to closely related sister
companies. Bidders must proactively declare such sister/ common business/
management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as
amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder
shall not have conflict of interest with other bidders, as above.
98 Relationship clause:
Every bidder should at time of bid give a declaration as under:
“If any Bidder Company/Firm, the interest(i.e. share holding in company and share
in partnership firm) of any employee of the tendering company of his/her relative as
defined in section 2(77) of Company act 2013 is 10% or more, the tendering
company will not deal with such company/Firm at all.
Tenderer therefore must specifically disclose the fact in his technical bid Non
disclosure of such facts would immediately disqualify the tenderer for further
dealing with the tendering company”
Seal & Signature of Bidder
GENERAL INFORMATION (TECHNICAL) :
1.1. CODES, STANDARDS & REGULATIONS
The design, manufacture, erection and testing of the equipments and material to be supplied
shall comply with latest revisions of relevant Indian Standards or equivalent IEC standards.
In addition, the Indian Electricity Rules, Electricity Act 2003,Statutory requirements of Central
Govt., GERC and State Government of Gujarat( applicable codes), shall also be complied with.
Any complications arising out of it will be set right by the bidder without any implication to
The bidder shall submit his offer as per information given in submission of tender.
Drawings, Data and Documents
The bidder shall furnish following documents/ information along with offer in spiral bound
General description of equipment offered specifying the important features, make, technical
parameters, materials of construction etc. To enable GETCO to have proper understanding of
the material offered and its operation.
The following drawings and documents shall be furnished to GETCO by the successful bidder
for approval of GETCO, within the period stipulated in the draft contract/mutually agreed terms
at the time of placement of order, the bidder shall submit a list of all such drawings and
documents he proposes to submit. The list will be approved by GETCO and may be modified,
if necessary. Each drawing /document in the list shall be identified with a serial number,
description and scheduled date of submission. This should be submitted in a spiral bound
1.2. MAJOR DOCUMENTS & DRAWINGS REQUIRED FOR APPROVAL:
Switchyard Single Line Diagram
Switchyard Layout Plan and Sections.
Protection SLD with all details of relays and wiring
Control room/GIS room Layout
Protection Philosophy.
Equipment Earthing Philosophy supported by all drawings and description of
Earthing Layout showing Earth Mat(s),treated and untreated earth electrodes
supported by complete Earthing system ( mat) design calculations
Illumination Layout for switchyard and control room with design calculations.
Erection Key Diagram with BOQ.
Equipment Clearance Check Diagram (Clearances shown for each and every
portion of switchyard ,inter-equipments ,equipments to tower/structures).
Direct Stroke of Lightning Protection Layout with full design calculations.
Other Design Calculations required for Sub-Station
All the equipment’s Structure drawings along with Design Calculations.
Control and power cable philosophy and cable schedules for all the bays.
Drawings for all the equipments & materials as per bidding schedule
supported by required calculations related to design/rating /temp rise
Field Quality Plan for Sub-Station.
Seal & Signature of Bidder
1.3. FOR REFERENCE
OEM’s Complete and comprehensive instruction manuals with drawings for operation
and maintenance of the equipments supplied by the bidder. This shall also include the
Static and dynamic loading of all major equipment
Inter panel wiring of all equipment
Inter panel wiring and terminal block arrangement
External connection diagram, panel wise and scheme wise
Composite drawings showing circuit of switchgear remote panels and other
items to complete circuit for its proper functioning.
Log sheets indicating daily/ hourly recording of power system parameters to be noted
down by GETCO operating person. The parameter shall indicate loading of various
electrical equipment, quality of power supply, energy consumption and maximum demand
of sub-station.
Preventive maintenance schedule for each equipment.
Procedure for shutdown and energization of switchyard and HT equipment.
Safety procedures for safe operation of equipment and complete system.
Test procedure for site tests.
1.4. AS- BUILT DRAWINGS
On completion of installation, testing and commissioning, the bidder shall incorporate revisions/
modification if any, in the reproducible and submit ‘as built’ drawing for GETCO’s record in spiral
bound volumes and soft copy. The drawings shall be in Autocad DXF format.
1.5. TEST AND INSPECTION FOR INDIVIDUAL ITEM
Routine test/ Acceptance tests shall be carried out on all equipment at manufacture’s works as
per appropriate IS/IEC. The bidder shall make reasonable facilities, at his cost for inspection
and testing of the equipment/material by GETCO’s Officials. No equipment shall be dispatched
to site without provisional certificates of acceptance issued by GETCO. Inspection and test shall
be carried out at the place of manufacture as well as on receipt of the equipment at site if
required. Inspection and tests do not relieve the bidder of his contractual obligations regarding
performance of the equipment at site/in actual use.
The bidder shall submit the brief summary of all type test certificates for similar
equipment supplied by him elsewhere and the actual type test certificates as and when asked.
In case type test certificates for similar equipment is not available, the same shall be conducted
in the presence of GETCO’s Authorized representative if GETCO so desires, without any
financial implications to the GETCO. The type test report shall not be older than 5 year from
the date of tender opening (Technical bid opening).
The supplier of the equipment shall ensure that the equipment available at his works for
routine test/type test/acceptance test are duly calibrated and necessary certificate shall be made
available to the inspecting officer of GETCO.
Seal & Signature of Bidder
As far as possible, the supplier of equipment shall give a minimum of 15 days notice of
readiness of material and give the inspection call accordingly. If on arrival of inspecting officer
at the works, the material is not found to be ready, the concerned supplier of equipment shall
be liable for additional expenditure GETCO may incur on account of retention or re-deputation
of the inspecting officer.
The officer deputed for inspecting for particular lot of material according to intimation
from you may also like to check Quality Control Plan and for that purpose he may demand the
Test Reports of raw material being procured.
1.6. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of
Engineer -in-charge from point of view of completeness in the presence of GETCO’s Authorized
Representative.
Visual inspection of total system.
Checking of continuity of power and control cables.
Checking of insulation by secondary injection or by primary injection.
Calibration of meters by secondary injections or by primary injection.
Checking of protective schemes.
Setting of relays and the checking of their operation with one lower and one
higher setting.
Checking of control scheme of breakers, etc. as per approved drawing and
as per actual requirement.
Checking of alarm and as per actual simulation of faults.
Checking of nameplate data of complete system.
Verification and measurement of earthing resistance.
Checking of cable terminations and laying, dressing etc. in the equipment
kiosk and control panels.
Checking of safe accessibility of components.
All the equipments and materials shall be passed through checks and test as per approved Field
The insulation resistance test shall be carried out on the following equipments.
EHV installation - by 5000 V Megger
HV installation above 11 KV - by 2500V Megger
Power circuit of voltage up to 1KV- by 1000 V Megger
A.C. & D.C. auxiliary circuits - by 500 V Megger
1.7. BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts in M.S. PROJECT and PROJECT
schedules indicating starting and completion dates of each activity, such as preparation &
approval of drawings, manufacturing/supply/ delivery, civil works, erection, testing, pre
commissioning and commissioning etc.
1.8 SCADA & Protection Architecture
SCADA & Protection architecture is based on IEC-61850 ring topology using ‘Bay Oriented’
approach. This concept includes Protection IEDs, Bay Control Units BCUs, LAN equipments
Seal & Signature of Bidder
etc. are to be installed in dedicated chambers (Yard-kiosks) close to primary equipments of
switch-yard. All such equipments are to be connected through fiber optic cable in ring fashion.
HMI PCs, DR work station PC, DAS metering PC, ABT metering PC, GPS, Gateway for RTU,
Gateway for RCC and Printers are connected via switches and placed in Control Room.
Identification labels shall be provided on all equipments as per client’s approval. All labels shall
be engraved on plastic (white letters with black background) and all text shall be in English
Any exclusion /deviation from specification shall be clearly spelt out and listed at one place only
and bidder shall substantiate the same with appropriate reasons. In the absence of clearly spelt
out and mutually agreed deviation, it shall be considered that the bidder has undertaken to
comply with the technical specification totally, in letter and spirit.
It will be responsibility of the successful bidder to obtain necessary approval of statutory
authority as per rules of Govt. of Gujarat and Central Electricity Authority for the work under his
scope before energizing/ charging the equipment/system. However bidder shall be extended all
assistance by the GETCO in regard to application for the same.
The installation for the equipment shall include civil works and necessary material required to
complete the Installation. It may be noted that foundation details for structure should be got
approved from GETCO.
Before dispatch to the Site, but before energization, all components/ accessories which are
intended to be painted shall be thoroughly cleaned of rust, scales, greases, etc. and painted
with two coats of proper primer. This shall be followed by two coats of finishing paint of the
colour specified/approved by the GETCO. Damage to the painting surface during transit/
erection shall be made good by the bidder free of cost before the equipment is finally accepted
by the Engineer- In charge.
For installation work at site, the bidder shall be fully responsible for arranging the supply of
required tools and tackles, welding sets, pipe bending machine, cable crimping tools, labours,
scaffolding, ladders, etc.
The power connection will be provided by GETCO at one point only at the prevailing tariff, from
where the bidder has to arrange for temporary connection and further distribution of supply at
his own cost. Similarly, bidder has to arrange for water by pipeline or by water tankers or by
drilling bore in S/S at his cost.
The installation of energy meter, cut out, switches etc. for construction power shall be as per
prevailing norms of Distribution Department of GETCO. The test report and other requirement
to release the connection shall be as per prevailing rules of Distribution Department of GETCO.
On completion of the installation but before energizing the system, all installation shall be
physically checked and properly tested. These checks and tests shall be conducted by the
bidder under the supervision of Engineer In-charge and bidder shall furnish the final status and
test results shall be made good by the bidder free of cost within contract completion period.
All clamps, brackets, bolts, nuts, screws, markers, ferrules, lugs and glands and other hardware
necessary for erection work, shall include in the scope of work and shall be arranged by the
Seal & Signature of Bidder
2.0 GALVANISING
All the Equipments/material shall be hot dip galvanized. Wherever it is not feasible to provide
galvanized equipment/material shall be painted to withstand heavily polluted atmospheric
conditions. Painting should be done with two coats of Red oxide & two coats of epoxy paints of
3.0 APPROVED MAKES OF EQUIPMENTS /ITEMS OF SUPPLY.
Bidder have to supply material through approved vendor of GETCO who meet the qualification
requirement as per respective specification.
4.0 INSPECTION AND TESTING OF EQUIPMENT
Manufacturing Progress reviews, inspection & testing of equipment covered under the technical
specification shall be carried out by the GETCO’s Authorized Representative at the
manufacturer’s works/premises prior to dispatch, to ensure that their quality & workmanship are
in conformity with the contract specifications and approved drawings.
4.2 RESPONSIBILITY FOR INSPECTION
Any inspection by the GETCO’s Authorized Representative does not relieve the Bidder from his
responsibility of quality assurance and quality control functions.
As such, any approval which the Inspecting Engineer of the GETCO may have given in respect
of equipment and other particulars and the work or workmanship involved in the contract
(whether with or without test carried out) shall not bind the GETCO to accept the plant &
equipment, should it on further tests at site be found not comply, with the requirements of the
contract. If required, audit wing of GETCO HO Inspection Department shall also be entrusted
with inspection of particular item/equipment received at site.
The bidder is to meet the inspection & testing requirements for the equipment coming under the
statutory regulations e.g. weights & measures, safety, IE rules, etc. and submit calibration
certificates and documents from appropriate authority to the GETCO Inspecting Engineer for
the same, on demand.
4.3 EXTENT OF INSPECTION
The extent of inspection & testing by the GETCO shall vary from equipment to equipment as
per design requirements, if necessary.
Extent of inspection to be carried out shall be finalized with the Bidder after award of the contract
on the basis of scope of supply, technical specification and approved GA drawings.
Following standard bought-out items shall be accepted on the basis of manufacturer’s test
LV current transformers.
Standard AC motors up to 10 KW rating and smaller KW rating.
Push button in manufacture’s standard enclosure.
Starters in manufacture’s standard enclosure.
Level switches.
Pressure switches.
Pressure gauges.
Lighting fittings, switches, fans, wires, plug, sockets etc.
Seal & Signature of Bidder
4.4 METHOD OF GIVING INSPECTION CALLS
Inspection calls shall be given by the Bidder to Chief Engineer (Project) GETCO, HO, Baroda
in accordance with mutually agreed program with 15 days’ clear time for all equipments. Four
sets of relevant test certificates and inspection report of the Bidder/ Sub-bidder after satisfactory
completion of internal inspection and test shall be submitted along with acceptance/routine test
certificate of the tests witnessed by GETCO Inspector.
The GETCO reserves the right to visit at any stage of manufacture at plant and ask for additional
inspection & tests if it is found necessary after completion of detailed design & engineering and
approval of drawings.
The GETCO or his duly authorized representative shall on giving written instructions to the
bidder, setting out any grounds of objection which he may have in respect of the work, be at
liberty to reject all or any part of plant/equipment or workmanship which are not in conformity
with the contract provisions.
4.5 BIDDER’S RESPONSIBILITY
The Bidder shall provide all reasonable facilities to the Inspecting Engineer of the GETCO to
the Bidder’s or their sub-bidder’s premises at any time during contract period, to facilitate him
to carryout inspection & testing of equipment during manufacture of equipment.
The Bidder shall delegate a representative/coordinator to deal with GETCO on all inspection
The Bidder shall comply with instructions of the GETCO’s Inspecting Engineer fully.
The Bidder shall ensure that the equipment and materials once rejected by the Inspecting
Engineer are not reused in the manufacturing of the equipment and materials. Where parts
rejected by the Inspecting Engineer have been rectified as per agreed procedures laid down in
advance, such parts shall be segregated for separate inspection and approval, before being
used in the work.
5.0 INSPECTION WAIVER
For certain standard bought-out items and the products of reputed firms where the GETCO has
earlier experience on the quality of their products, the GETCO may consider allowing of
inspection waiver for such items. The Chief Engineer (s) GETCO, Baroda shall issue approval
of inspection waiver certificate after scrutiny of bidder’s internal inspection report, test
certificates and other documents. However, it is not binding upon GETCO to give waiver on
bidder’s request. GETCO may weigh the important issues like quantity of material, cost of
material, importance of material, distance of travel & time of travel required to inspect before
deciding the waiver of the inspection.
6.0 OTHER CONDITIONS
Any clarification / amendment necessary, in any or more clauses incorporated in the present
A/T, you will have to make a detailed reference to the GETCO latest within ten days from the
receipt of A/T. If you fail to do so, no request for any clarification / amendment shall be
considered thereafter. Please also note that all the points which need clarification / amendment
should be brought out at once. No piecemeal clarification/amendment will be entertained.
Seal & Signature of Bidder
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be
performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the
Site office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during
the performance of his field activities. He shall also comply with the Minimum Wages
Act, 1948 and the Payment of Wages Act (both of the Government of India) and the rules
made there under in respect of any employee or workman employed or engaged by him
or his Sub-Contractor. He shall abide by labor laws.
2.2 All initial registration and statutory inspection fees, if any, in respect of his work pursuant
to this Contract shall be to the account of the GETCO. Should any such inspection or
registration need to be re-arranged due to the fault of the Contractor or his Sub
Contractor, the additional fees to such inspection and/or registration also shall be borne
by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of
erection, testing and commissioning of the equipment to be supplied & erected under
the Contract. The Owner shall continue to hold the lien on all such equipment throughout
the period of Contract. No material brought to the Site shall be removed from the Site by
the Contractor and/or his Sub-Contractors without the prior written approval of the
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the
Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at
such time as the Owner may approve and the Owner shall give the Contractor
reasonable facilities for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site,
except by the special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the
purpose of the Contract. Any written order or instruction of the Engineer or his duly
Seal & Signature of Bidder
authorized representative shall be communicated to the said authorized resident
representative of the Contractor and the representative shall be available at a stated
address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner,
who may be performing other works on behalf of the Owner and the workmen who may
be employed by the Owner and doing work in the vicinity of the Works under the
Contract. The Contractor shall also so arrange to perform his work as to minimize, to
the maximum extent possible, interference with the work of other Contractors and their
workmen. Any injury or damage that may be sustained by the employees of the other
Contractors and the Owner, due to the Contractor’s work shall promptly be made good
at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect
of his employees and workmen at Site. The Engineer shall be at liberty to object to the
presence of any representative or employee of the Contractor at the Site, if in the opinion
of the Engineer such employee has misconducted himself or is incompetent or negligent
or otherwise undesirable and then the Contractor shall remove such a person objected
to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity
plans and schedules for carrying-out each part of the works. Any review of such plan or
schedule or method of work by the Engineer shall not relieve the Contractor of any of
his responsibilities towards the field activities. Such reviews shall also not be considered
as an assumption of any risk or liability by the Engineer or the Owner or any of his
representatives and no claim of the Contractor will be entertained because of the failure
or inefficiency of any such plan or schedule or method of work reviewed. The Contractor
shall be solely responsible for the safety, adequacy and efficiency of plant and
equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall
apply continuously till the completion of the Contract and shall not be limited to normal
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including
if any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities
shall highlight comparison to the schedules. The report shall also indicate the reasons
for the variance between the scheduled and actual progress and the action proposed for
corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
Seal & Signature of Bidder
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken
over by the Engineer. No claim will be entertained by the Owner or by the Engineer for
any damage or loss to the Contractor’s works and the Contractor shall be responsible
for complete restoration of the damaged works to original conditions to comply with the
specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees
with experience of his particular work. No person below the age of eighteen years shall
12.2 All traveling expenses including provisions of necessary transport to and from Site,
lodging, allowances and other payments to the Contractor’s employees shall be the sole
responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any
Government agency under any of the provisions of the Minimum Wages Act, Workmen
Compensation Act, Contract Labour Regulation Abolition Act or any other law due to act
of omission of the Contractor, the Owner may make such payment and shall recover the
same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract
make available at site, land for construction of Contractor’s field office, workshop, stores,
etc. required for execution of the Contract. Any such temporary construction shall be
done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the
Engineer. Until and unless the Contractor has handed over the vacant possession of
land allotted to him for the above purpose, the payment of his final bill shall not be made.
13.2 Electricity:
The concerned EE (Const.) shall apply for 11KV Transformer Center at the site of new
Substation and for which concerned DISCOM shall erect the required line and install the
transformer Center, for which, the cost is to be borne by GETCO. Subsequently, the
Agency finalized for EPC contract by GETCO, shall apply for temporary connection to
the concerned DISCOM Sub-Division paying required Service Charges and Deposit.
Such temporary connections to be released on the name of EPC-Contractor on
recommendation of the concerned EE (Const.). The power so consumed shall be
charged at the prevailing tariff rate.
Seal & Signature of Bidder
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and
scaffoldings required for pre-assembly, erection, testing and commissioning of the
equipment covered under the Contract. He shall submit a list of all such materials to the
Engineer before the commencement of work at Site. These tools and tackles shall not
be removed from the Site without the written permission of the Engineer.
14.2 The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of Contractor’s
personals shall be trained in administering first-aid.
14.3 Cleanliness
14.3.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and
free from rubbish, debris etc. during the period of Contract. The Contractor shall employ
enough number of personnel to keep the work area clean. Materials and stores shall be
so arranged to permit easy cleaning of the area. In areas where equipment might drip
oil and cause damage to the floor surface, a suitable protective cover of a flame resistant,
oil proof sheet shall be provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer at
site at suitable points. These points shall be used as datum for the works under the
Contract. The Contractor shall inform the Engineer well in advance of the times and
places at which he wishes to do work in the area allotted to him so that suitable datum
points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed
and/or dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which
minimize fire hazards to the extent practicable. Combustible materials, combustible
waste and rubbish shall be collected and removed from the Site at least once each day.
Fuels, oils and volatile or inflammable materials shall be stored away from the
construction and equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained
for firefighting. Enough of such trained personnel must be available at the Site during
the entire period of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor
shall make suitable security arrangements ensure the protection of all materials,
equipment and works from theft, fire, pilferage and any other damages and loss.
Seal & Signature of Bidder
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment furnished and
erected by the Contractor shall be the responsibility of the Contractor as detailed in
relevant clauses of Technical Specifications. The Contractor shall provide, in addition,
test instruments, calibrating devices, etc and labour required for successful performance
of these trials. If it is anticipated that the above test may prolong for a long time, the
Contractor’s workmen required for the above test shall always be present at Site during
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly
received, unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s
information only. The Contractor shall submit to the Engineer every week a report
detailing all the receipts during the week. However, the Contractor shall be solely
responsible for any shortages or damages in transit, handling and / or in storage and
erection of the equipment at Site. Any demurrage, wharf age and other such charges
claimed by the transporters, railways etc, shall be to the account of the Contractor.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of
all equipment materials received by him for the purpose of erection and keep such record
open for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The
equipment stored shall be properly protected to prevent damage either to the equipment
or to the floor where they are stored. The equipment from the store shall be moved to
the actual location at the appropriate time so as to avoid damage of such equipment at
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried
by heating before they are installed and energized. Motor bearings, slip ring,
commutators and other exposed parts shall be protected against moisture ingress and
corrosion during storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of
commissioning and a record of such measured insulation values maintained by the
Contractor. Such records shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be
thoroughly protected and stored in a suitable manner to prevent damage or deterioration
in quality by storage.
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those
earmarked for him, the Engineer will have the right to get it moved to the area earmarked
for the Contractor at the Contractor’s cost.
Seal & Signature of Bidder
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store
all equipment, which require indoor storage. Normally, all the electrical equipment such
as motors, control gears, generators, exciters and consumables like electrodes,
lubricants etc. shall be stored in the closed storage space. The Engineer, in addition,
may direct the Contractor to move certain other materials, which in his opinion will
require indoor storage, to indoor storage areas, which the Contractor shall strictly comply
20.0 CONSTRUCTION MANAGEMENT
20.1 The field activities of the Contractors working at Site will be coordinated by the Engineer
and the Engineer’s decision shall be final in resolving any disputes or conflicts between
the Contractor and other Contractors and the tradesmen of the Owner regarding
scheduling and coordination of work. Such decision by the Engineer shall not be a cause
for extra compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place
to be designated by the Engineer. The Contractor shall attend such meetings and take
notes of discussions during the meeting and the decision of the Engineer and shall
strictly adhere to those decisions in performing his works. In addition to the above
weekly meeting, the Engineer may call for other meetings either with individual
Contractors or with selected number of Contractors and in such a case the Contractors
if called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for
performance of his works in accordance with the specified construction schedule. If at
any time, the Contractor is falling behind the schedule, he shall take necessary action to
make good for such delays by increasing his work force or by working overtime or
otherwise accelerate the progress of the work to comply with the schedule and shall
communicate such actions in writing to the Engineer, satisfying that his action will
compensate for the delay. The Contractor shall not be allowed any extra compensation
for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or
materials or supply or any other services to the Contractor except for the coordination
work between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other
Contract Documents and any other supplementary data complete with all the latest
revisions thereto. The Contractor shall also maintain in addition the continuous record
of all changes to the above Contract Documents, drawings, specifications, and
supplementary data, etc. effected at the field and on completion of his total assignment
under the Contract shall incorporate all such changes on the drawings and other
Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to
the Engineer in required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation
to the Engineer. All such goods shall, from the time of their being brought vest in the
Owner, but may be used for the purpose of the works only and shall not on any account
Seal & Signature of Bidder
be removed or taken away by the Contractor without the written permission of the
Engineer. The Contractor shall nevertheless be solely liable and responsible for any
loss or destruction thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time
be due or owing to him by the Contractor, under, in respect of or by reasons of the
Contract. After giving a fifteen (15) days notice in writing of his intention to do so, the
Owner shall be at liberty to sell and dispose off any such goods, in such manner as he
shall think fit and to apply the proceeds in or towards the satisfaction of such sum or
sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the
direction of the Engineer the materials such as construction equipment, erection tools
and tackles, scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He
shall also be responsible for protection of all persons including members of public and
employees of the Owner and the employees of other Contractors and Sub-Contractors
and all public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General
Terms and Conditions of Contract, the following provisions will also apply to the portion
of works to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover
the Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s- As per statutory
Compensation Provisions
Employee’s liability As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries,
disabilities, disease or death of members of public or damage to property of others, due
to any act of omission on the part of the Contractor, his agents, his employees, his
representatives and Sub-Contractors or from riots, strikes and civil commotion.
24.4 The hazards to be covered will pertain to all the works and areas where the Contractor,
his Sub-Contractors, his agents and his employees have to perform work pursuant to
24.5 The above are only illustrative list of insurance covers normally required and it will be
the responsibility of the Contractors to maintain all necessary insurance coverage to the
Seal & Signature of Bidder
extent both in time and amount to take care of all his liabilities either direct or indirect, in
pursuance of the Contract.
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be
performed without subjecting the equipment and materials to adverse effects during
inclement weather conditions, like monsoon, storms etc. and during other unfavorable
construction conditions. No field activities shall be performed by the Contractor under
conditions, which might adversely affect the quality and efficiency thereof, unless special
precautions or measures are taken by the Contractor in a proper and satisfactory manner
in the performance of such Works and with the concurrence of the Engineer. Such
unfavorable construction conditions will in no way relieve the Contractor of his
responsibility to perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc.
which he may come across during the course of performance of his Works either during
excavation or elsewhere, are properly protected and handed over to the Engineer.
Similarly the Contractor shall ensure that the bench marks, reference points, etc, which
are marked either with the help of Engineer or by the Engineer shall not be disturbed in
any way during the performance of his Works. If any work is to be performed which
disturbs such reference the same shall be done only after these are transferred to other
suitable locations under the direction of the Engineer. The Contractor shall provide all
necessary materials and assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to GETCO or to others, working at the Site. The
Contractor shall also be responsible for provision of all safety notices and safety
equipment required both by the relevant legislations and the Engineer, as he may deem
27.4 All equipment used in construction and erection by Contractor shall meet
Indian/International Standards and where such standards do not exist, the Contractor
shall ensure these to be absolutely safe. All equipment shall be strictly operated and
maintained by the Contractor in accordance with manufacturer’s Operation Manual and
safety instructions and as per Guidelines/rules of GETCO in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be
carried-out in accordance with the relevant provisions of Factories Act 1948, Indian
Electricity Act 1910 and associated Laws/Rules in force from time to time. A register of
such examinations and tests shall be properly maintained by the Contractor and will be
promptly produced as and when desired by the Engineer or by the person authorized by
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at
the Site including safe means of access, railings, stairs, ladders, scaffoldings etc. The
scaffoldings shall be erected under the control and supervision of an experienced and
Seal & Signature of Bidder
competent person. For erection, good and standard quality of material only shall be
used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical
equipment belonging to the Owner or other Contractors under any circumstances,
whatsoever, unless expressly permitted in writing by GETCO to handle such fuses,
wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging
to the other Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the
c. Obtain permission of the Engineer detailing the sockets to which the appliances
may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of
which shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior
permission. No weight of any description will be imposed on any cable and no ladder or
similar equipment will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the Engineer and a permit to work shall be issued by the Engineer
before any repair work is carried out by the Contractor. While working on electric
lines/equipment, whether live or dead, suitable type and sufficient quantity of tools will
have to he provided by the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor
to promptly inform the same to the Engineer in prescribed form and also to all the
authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion
the work is being carried out in such a way that it may cause accidents and endanger
the safety of the persons and/or property, and/or equipment. In such cases, the
Contractor shall be informed in writing about the nature of hazards and possible
injury/accident and he shall comply to remove shortcomings promptly. The Contractor
after stopping the specific work can, if felt necessary, appeal against the order of
stoppage of work to the Engineer within 3 days of such stoppage of work and decision
of the Engineer in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work
due to safety reasons and the period of such stoppage of work will not be taken as an
Seal & Signature of Bidder
extension of time for completion of work and will not be the ground for waiver of levy of
liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works,
requirements of Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without
proper introduction as to the hazards incident thereto, both to himself and his fellow
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at
crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced
divers, use of gum boots for working in slushy or in inundated conditions are
essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions
of applicable laws pertaining to the safety of workmen, employees, plant and equipment
as may be prescribed from time to time without any demur, protest or contest or
reservations. In case of any discrepancy between statutory requirement and GETCO
Safety Rules referred above, the latter shall be binding on the Contractor unless the
statutory provisions are more stringent.
a. Fatal injury or accident-Rs. 1, 00,000/- :
These are causing death per person applicable for death/
b. Major injuries or accident causing Rs. 20,000/- injury to
25% or more permanent disablement per person : any person,
to Workmen or employees : whosoever.
Permanent disablement shall have same meaning as indicated in Workmen’s
Compensation Act. The compensation mentioned above shall be in addition to the
compensation payable to the workmen/employees under the relevant provisions of the
Workmen’s Compensation Act and rules framed there under or any other applicable laws
as applicable from time to time. In case the Owner is made to pay such compensation
then the Contractor is liable to reimburse the Owner such amount in addition to the
compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good
engineering practice, the Engineer’s drawings and other applicable Indian recognized
codes and laws and regulation of the Government of India.
Seal & Signature of Bidder
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions
particular to the Contract. The provisions herein are to be read and understood in
conjunction with the relevant provisions elsewhere in the General Conditions of Contract
(GCC) and Erection Conditions of Contract (ECC). The intent of provisions herein are
specific to this contract and are, in general, supplementary to related provisions under
GCC and ECC. However, in certain provisions which are contrary to those in GCC and
ECC, the provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee :
The tender fee plus GST as applicable specified in notice inviting tender is payable by
(RTGS/NEFT/Online) at Vadodara drawn on any Scheduled Bank in favour of Gujarat
Energy Transmission Corporation Ltd. The same will be furnished in Cover-1 of Bid
along with EMD (Bid Security).
3.0 Earnest Money Deposit (EMD):(Ref.Cl.12.1 of GCC)
The EMD is payable as under:
50 % of EMD by DD in favour of Gujarat Energy Transmission Corporation Ltd. on
any Scheduled Bank in Vadodara. Balance 50 % by Bank Guarantee (validity of
Months from the date of submission of bid of the tender) from any Nationalized
Bank in the format provided herein. 100% EMD by DD is acceptable.
Payment by Cheque/Co.op Bank Guarantee/ Company Guarantee is not permissible.
3.2 Payment by Cheque/Coop Bank Guarantee/ Company Guarantee is not
3.3 Validity Period: - The offer should be valid for a minimum period of 180 days from
the date of opening of Technical bid.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the
same will make the Bid invalid.
5.0 QUALIFYING REQUIREMENT
3. Valid Electrical Contract License
4. Registered under GST
Seal & Signature of Bidder
5. PF Registration Certificate.
6. The bidder should not have been referred to NCLT under Insolvency & Bankruptcy
Code (IRP has been appointed or Liquidation proceedings have been initiated under
IBC). Undertaking to be submitted as per GETCO’s prescribed Format.
[A] TECHNICAL QUALIFYING REQUIREMENTS
Bidder shall have executed minimum 2 Nos. of EPC contracts of 220kV or higher
voltage class substation at two different locations within last Seven years with State or
Central Transmission Utility or major industries. 220kV or higher voltage class
Substations include minimum two nos. bays (minimum one feeder bay & minimum one
Transformer Bay). At least one Sub-Station out of above commissioned as above shall
be performing satisfactorily for at least one year.
Bidder shall have executed minimum 2 Nos. of EPC contracts of 110kV or higher
voltage class substation at two different locations within last Seven years with State or
Central Transmission Utility or major industries.110kV or higher voltage class
Substations include minimum two nos. Bays (minimum one feeder bay & minimum one
Transformer Bay). At least Two Sub-Station out of above commissioned as above shall
be performing satisfactorily for at least one year.
Bidder shall have executed minimum 3 Nos. of EPC contracts of 66kV or higher voltage
class substation at three different locations within last Seven years with State or
Central Transmission Utility or major industries. 66kV or higher voltage class
Substations including minimum two nos. Bays (minimum one feeder bay & minimum
one Transformer bay). At least Three Sub-Station out of above commissioned as
above shall be performing satisfactorily for at least one year
Sub-Contractors’ experience may be considered if it is officially recognized by
Order Placing authority of the State Power Utility/ Government organizations /
The bidder should invariably furnish the Performance certificates in support of
their Qualifying requirements with detailed work order copy covering all scope
of work and the Performance certificates shall be issued by an officer not below
the rank of Superintending Engineer or equivalent cadre of State power utility /
Government organizations / PSU / Major Industry only otherwise the bid will
become non-responsive
[B] FINANCIAL REQUIREMENT:
Seal & Signature of Bidder
1. Bidder’s Minimum Average Annual Turnover (MAAT) for best three years out of last
five financial years as shall not be less than the 50% of estimated amount of this
Note :- For the purpose of arriving at MAAT, Revenue from operation shall be
considered only excluding non-recurring income / other income / interest income etc.
2. Last Financial Year Liquid Assets should not be less than 20% of estimated amount
of this tender.
Note: For the purpose of arriving at LA Current Assets Less Inventories shall be
3. Bidder’s Net Worth for last financial years should be positive.
Net worth means paid up share capital, Share Application Money pending allotment*
and reserves# less accumulated losses and deferred expenditure to the extent not
# Reserves to be considered for the purpose of net worth shall be all reserves created
out of the profits and securities premium account but shall not include reserves
created out of revaluation of assets, write back of depreciation and amalgamation
* Share Application Money pending allotment will be considered only in respect of share
to be allotted.
Bidder to evidence the meeting of financial criteria shall submit:
(i) CA Certificate with valid UDIN Number failing which certificate shall not be considered
for the purpose of evaluation and
(ii) Audited Balance Sheet and Profit & Loss account along with the schedules referred
therein and the Auditor’s Report for the preceding five financial years, in line with one
of the following
a) In case last financial year’s closing date was within 6 months prior to bid due date
and audited Balance Sheet and Profit & Loss account of last financial year are not
available, bidder has the option to submit the financial details of five previous years
immediately prior to the last financial year. For example, in case bid due date is up to
30th September and financial details of immediate preceding financial years (year
ending 31st March of same year) are not available, the financial details of the five
previous years immediately prior to the last financial year may be submitted.
b) Otherwise it is compulsory to submit the financial details of immediate preceding five
financial years.
Seal & Signature of Bidder
6.0 Additional Documents:
Apart From various documents to be furnished along with the Bid as required in the GCC
and ECC, the following documents/details are to be furnished by the Bidder:
1. GST Registration No. date/ issuing authority.
2. Regn. No. under Shops & Estt. Act/issuing authority
3. Details of Partners/Directors of the Firm/Company.
4. Experience Record and details of orders pending / executed for various utilities
5. Last five years audited accounts
6. Details of Manufacturing/Fabrication facilities
7. Factory registration/License details
7.0 COMPLETION PERIOD
7.1 Overall Completion periods for this Contract as per tender scope shall be – 15 Months
from Date of LOA.
7.2 No mobilization period, idling or stoppage period will be allowed during this period of the
7.3 The completion date will be deemed to be the date on which all works on the Contract
are demonstrated to be complete to the satisfaction of the GETCO/Engineer and is
complete in all respects as per the terms and conditions of this Contract.
8.0 Instructions before submitting your bid.
The Bid evaluation shall be carried out on total end cost.
1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD DXF
format and manuals in PDF format, for offered item shall be submitted by successful
bidder. Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Quality Assurance Plan (QAP) & Field Quality Plan (FQP) with the
3. The bidder must fill up all the point of GTP for offered item/s. Instead of indicating refer
drawing, or as per IS/IEC”, the exact value/s must be filled in.
4. All the points other than GTP, which are asked to confirm in technical specifications must
be submitted separately with the bid.
5. Please note that the evaluation will be carried out on the strength of content of bid only.
No further correspondence will be made.
6. The bidder shall bring out all the technical deviation/s only at the specified annexure.
7. Design and engineering of SLD (Single line Diagram), layout drawing, sectional view,
BOQ, DSLP, Earth mat design, lighting & Illumination calculation of switchyard and all
drawings shall be carried out by successful bidder.
8. Preparing of Erection Key Diagram (EKD) indicating all the quantity required for successful
erections, testing and commissioning of AIS & shall be submitted for approval. All
equipments,material shall be supplied as per approved EKD (Drawing/BOQ).
9. Bar chart with completion period in MS PROJECT shall be submitted.
10. After the commissioning of S/S, contractor shall arrange thermoscaning of entire
switchyard & submit detailed reports. However this will not be contractual hold point.
GETCO reserves the right to ask the contractor to conduct the same on entire S/S under
full load condition.
9.0 Addendum to the technical specifications.
Seal & Signature of Bidder
The addition /alternations mentioned here under will supersede the related clauses of
respective technical specifications, if differs with original clause.
All the hardwares, conductor accessories, clamps and connector used in switchyard
erections shall have corona free performance and related type tests as per standards
shall have to be submitted.
1. The complete design, detailed engineering are to be done by the successful bidder.
2. Design calculations for SC forces , thermal capability of bus and each equipment
component of GIS , vibration, DSLP , Earth Mat , Illuminations , structures and other
calculations required for AIS are to be submitted by successful bidder.
3. All the drawings are to be submitted by the successful bidder and got approved from
GETCO before execution.
4. Detailed Engineering BOQ to be submitted by the successful bidder and got approved
after due scrutiny considering actual requirement, standard clearances (CLD) etc.
10. Special Notes:
The “Interse” revised bidding shall be carried out on the same day of price bid
opening. The L1 price shall be put up for starting price for “Interse” revised bidding.
“Interse” revised bidding shall be for reducing the price and the bidders have to
reduce their quoted price in decrement of value as decided before start of “Interse”
revised bidding.
If any bidder bids in last 2 minutes of deadline for submission of bid for “Interse
Revised Bidding” then, the time for “ Interse Revised Bidding” shall be extended for
further 5 minutes from its previous closing time.
Time of the Interse Revised Bidding shall be intimated to bidder along with the
intimation of price bid opening.
The procedure to be followed for elimination of Bidders for Interse Revised Bidding
shall be as below:
Sr. No. No. of Particulars
1 1 No scope of bidding. Re-invite tender
2 2 Scope of Interse Revised Bidding. No elimination.
3 3 or 4 Scope of elimination:
(A) Within 10% of L-1 bidder price - No elimination.
(B) Above 10% of L-1 Bidder price - Eliminate H1
4 5 or more Scope of elimination:
bidders (A) Within 10% of L-1 bidder price - No elimination.
(B) Above 10% of L-1 Bidder price - H1 and H2 to be
Successful bidder has to arrange for training at their expense for GETCO engineers as per
the clause no.3.22 of the Technical specifications for GIS equipment. Complete training
materials in soft & hard copy shall be given to participants.
12.Progress Report (Refer Cl. No. 9.00 of ECC)
Seal & Signature of Bidder
The successful bidder shall submit progress report monthly for supply activities &
fortnightly for erection activities along with site photographs.
13. Bidder’s Responsibility
As it is not possible to specify / indicate the detailed requirement of whole substation it is a
responsibility of the bidder for the complete design, manufacturing, supply at site, storage,
preservation, erection, testing and commissioning of the substation as per the technical
specifications.
14. Payment (refer GCC Cl. No 47.0)
1) Successful bidder must submit “No Claim certificate “along with final bill.
2) Tender specification gives only BOQ asking for unit rate & accordingly bidder
shall quote the prices against each unit and payment will be made accordingly.
Price break up if any for supply items will be considered for billing purpose & not
for actual payment.
15. Clarification
Clarification on the tender document if any shall reached to ACE (P&C) on or Before
14.05.2026. Clarification received thereafter will not be considered & out Rightly ignored.
16. Bonus: (Not Applicable)
17. Rain period:
No further extension will be given against rain period and this rain period shall be
considered as working period. While quoting the bid, Bidder have to consider this
(18) Commercial:
1) All the equipment to be supplied under this package shall be subject to Guarantee clause
of no 37.0 of GCC i.e 24 months from TOC irrespective of any time mention else were in
2) All the Annexure, forms, certificate are the standard documents of tender however, only
related document based on the qualifying requirement are applicable.
3) The Bid evaluation shall be carried out on final end cost only.
4) Welfare Cess will be applicable on Supply, Erection and Civil Portion. Welfare Cess shall
be paid by concerned bidder only.
7) The following is the method of award of contract:
_ LOI shall be issue to bidder having lowest end cost.
_ Bidder have to accept the LOI within 5 days.
_ GETCO shall issue LOA (Letter of Award) mentioning the end cost of package covering
break up of Supply and Erection part and acceptance to be given by bidder within 5 days.
_ Bidder have to pay Security Deposit as per Tender terms and condition within 30 days.
_ A/T shall be issued from above.
19. SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE DEPOSIT
Seal & Signature of Bidder
19.1 The successful bidder has pay security deposit-cum-performance deposit within 15 days
of receipt of LOA i.e. Letter of Award.
19.2 The successful bidder will be required to pay an amount equivalent to 10 % of the value
of the order (END cost) as a Security Deposit for satisfactory execution of the contract
and as performance guarantee. Such Security Deposit will be payable either in DD
payable at Vadodara / Bank guarantees from Scheduled / Nationalized Banks will be
acceptable, if the amount of security deposit payable exceeds ` 50,000/- Bank
Guarantees will be furnished. The Bank Guarantees furnished should have clear
one time validity till the completion of the order in all respect and up to the expiry
of the Guarantee period of 25 Months (2 years +1 month) from the date of
Commissioning of Substation. Bank Guarantee for interim period will not be allowed.
If by any reason the contract period is extended, then contractor should undertake to
renew the Bank Guarantee at least one month before the expiry of the validity failing
which Board will be at liberty to redeem the same, without entering into further
correspondence in the matter.
19.3 No interest will be allowed on amount of Security deposit.
19.4 The Security Deposit-cum-performance Guarantee deposit as above on total shall be
kept deposited up to 2 years + 1 month from the date of charging of Sub-station.
19.5 This security deposit is for the performance of contract and the same is liable to be
forfeited by the GETCO in event of nonfulfillment of the term and conditions of this
contract by the contractor.
19.6 Corporate Guarantees are not admissible.
19.7 The ‘Signing of Contract‘ and ‘Contract Agreements’ will be done as per
prevalent GETCO Terms and Conditions on the basis of LOA.
20. Inspection: ( Ref : Cl – 4.0 GENERAL INFORMATION (TECHNICAL) :
For inspection at manufacturing works, Supplier is responsible for to and fro expenses
of GETCO inspectors and all local incidental expenses including lodging and boarding
if it is outside India
21. All the Equipments proposed to be supplied shall have valid type test certificates from
any NABL accredited/Government laboratory of India or abroad as per respective
technical specifications
22. Following conditions shall be applicable for Annexure-B Items:
1) ‘PROPERTY OF GETCO’ must be embossed on each kit.
2) Guarantee/Warrantee of all kits shall be 3 years after successful commissioning at
GETCO substation.
Seal & Signature of Bidder
To be submitted with Q.R BID
Tender No: ACE(P&C)/Contract/TR bays Dahej & Zagadiya/E-424
Tender for Design, Engineering, Manufacturing, Supply, Erection, Testing & commissioning of
Nos. of 220/66kv Transformer Bays at 220kv Dahej ss and 01 No of 220/66kv Transformer Bay at
220kv Zagadiya ss Under Bharuch Tr. circle on EPC basis excluding Civil works
In connection with above subject, I / we confirm the following:
a) I/ We, the undersigned, have read and understand the Tender Specification No.
ACE(P&C)/Contract/TR bays Dahej & Zagadiya/E-424
b) The supply and erection price components in the bid are firm prices in line with Tender
Specifications and shall stand valid till completion of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no
deviation. Further, I / we also agree that additional conditions / deviations, if any found in bid,
the offer shall be out rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
To be submitted with Q.R BID ( On letter head with following declaration)
Declaration regarding “ Relationship with Employee”
Relationship with Employee:
Every bidder should, at the time of submission of bid, give a declaration as under.
“ If in any Bidder Company/firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his/her relative as
defined in Section 2(77) of the Company’s Act 2013 is 10% or more, the tendering
company will not deal with such company/firm at all. Tenderer therefore, must
specifically disclose this fact in his technical Bid. Non-disclosure of such facts would
immediately disqualify the tenderer for further dealing with the tendering company”
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
To be submitted with Q.R BID ( On letter head with following declaration)
Declaration regarding “Conflict of Interest among Bidders/Agents”
A bidder shall not have conflict of interest with other bidders. Such conflict of interest can lead
to anti-competitive practices to the detriment of Procuring Entity’s interests. The bidder found to
have a conflict of interest shall be disqualified. A bidder may be considered to have a conflict of
interest with one or more parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that
puts them in a position to have access to information about or influence on the bid of
another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidder
in more than one Bid will result in the disqualification of all bids in which the parties are
involved. However, this does not limit the inclusion of the components/ sub-assembly/
assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their behalf
in a particular tender enquiry. One manufacturer can also authorise only one agent/
dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units,
or more than one unit having common business ownership/ management, only one unit
should quote. Similar restrictions would apply to closely related sister companies.
Bidders must proactively declare such sister/ common business/ management units in
same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as
amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder shall
not have conflict of interest with other bidders for particular quoted item, as above.
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
Please submit along with Technical Bid
CERTIFICATE OF TECHNICAL COMPLIANCE
We, M/s. _______________________ hereby certify that there is no
deviation to the Technical specifications and amendments, if any,
against this tender.
We further confirm to submit Guaranteed Technical Particulars, valid
type test reports, drawings, calculations, etc., as per requirements of
BOQ, Technical Specifications and relevant IS/IEC; for offered
items/equipments/materials, in the event of an order on us, within
commencement period without affecting delivery schedule and
without any price implication to GETCO.
We confirm to provide valid authorization and service back up
guarantee from OEM for all offered items/equipments/materials, in the
event of an order.
NAME & SIGNATURE OF AUTHORISED PERSON
COMPANY’S ROUND SEAL
Seal & Signature of Bidder
(To be submitted With QR BID)
Vendor must fill up below details & should place at the top of the Technical Bid.
[IN PERCENTAGE]
Please quote your
a. GST registration no & date
d. PAN No. & Date :
e. PF Registration No. :
3. Liquidated damages TERMS AGREE :
(Please specify YES / No.)
4. SECURITY TERMS AGREE :
(Please specify YES / No.)
5. P.B.G. TERMS AGREED (Wherever applicable) :
(P.B.G. – Performance Bank Guarantee)
6. PAYMENT TERMS AGREE :
(Please specify YES / No.)
7. work involved :
8. TELEPHONE NOS. & FAX NO & Email id. :
9. AUTHORISED PERSON OF THE FIRM :
10. NAME OF THE PROPRIETOR, :
PARTNERS, DIRECTORS
[AS THE CASE MAY BE],
ALONG WITH ADDRESS, TELEPHONE,
FAX NO. & Email id. Etc.
11. If Vendor Registration is Done :
(Please Furnish the details of Vendor
Registration No. )
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
CONTRACT AGREEMENT
(Non judicial stamp paper of Rs. 300/- )
This agreement is made at Vadodara, the _________________day of __________in the
Christian year Two Thousand Five between
to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to context
include its successors or permitted assigns) of the one part and the Gujarat Energy
Transmission Corporation Limited, having their Corporate Office at Race Course, Vadodara,
(hereinafter called “Corporation” which expression shall unless excluded by or repugnant to the
context include its successors or assigns) of the other part.
1) “WHEREAS” the aforesaid Corporation has accepted the tender of the aforesaid
_____________________________________________ as per Corporation’s Order No.
____________________________________ hereinafter called “The works” and more
particularly described enumerated or referred to in the specification, terms and conditions
prescribed in the order letter, covering letter arid other letters and schedule of price which
for the purpose of identification have been signed by Shri
__________________________________________ on behalf of the Contractors and by
2) __________________________________________on behalf of the Corporation, a list
where of is made out in the schedule hereunder written and all of which said documents
are deemed to form part of this contract and included in the expression ‘The Works”
wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of the contractor for the work of
Design, Engineering, Manufacturing, Supply, Erection, Testing & commissioning
of 01 Nos. of 220/66kv Transformer Bays at 220kv Dahej ss and 01 No of 220/66kv
Transformer Bay at 220kv Zagadiya ss Under Bharuch Tr. circle on EPC basis
excluding Civil works of Gujarat State for the sum of
and subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or there from respectively or are reasonably necessary
for the completion of the works as mentioned and at the times, in the manner and subject to
the terms conditions and stipulations contained in this contract, and in consideration of the
due provision, executions, construction and completion of the works agreed to by the
contractors as aforesaid, the Corporation doth hereby covenant with the contractor to pay all
the sums of money as and when they become due and payable to the contractors under the
provisions of the contract. Such payment to be made at such times and in such manner as is
provided by the contract.
2. The conditions and covenants stipulated hereinbefore in this contract, are subject to and
without prejudice to the rights of the Corporation to enforce penalty for delays and / or any
other rights whatsoever including the right to reject and cancel on default or breach by the
contractors of the conditions and the covenants as stipulated in the general conditions,
specifications, forms, or tender schedule, drawing, etc. attached with Corporation’s Order
The contract value, extent of works / supply, completion / delivery dates, specifications and
other relevant matters may be altered by mutual agreement and if so altered shall not be
deemed or construed to mean or apply to affect or alter other terms and conditions of the
contract and the general conditions and the contract so altered or revised shall be and shall
always be deemed to have been subject to and without prejudice to said stipulation.
Seal & Signature of Bidder
List of documents forming part of the contract:
1) Corporation’s Tender Specification No-.
Tender Notice No.ACE(P&C)/Contract/TR bays Dahej & Zagadiya/E-424
2) Corporation’s Contract booklet – “Tender & Contract of Works”.
3) Corporation’s A/T No
4) A/T Acceptance letter no.
5) Memorandum & Article of Association.
6) Board Resolution authorizing person to sign on behalf of firm.
In witness whereof the parties hereto have set their hands and seals this day and month year
first above written.
Signed, Sealed and Delivered by
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of
Gujarat Energy Transmission Corporation Limited,
Sardar Patel Vidyut Bhavan,
Race Course, Vadodara -390
In the presence of, signature with names and
Seal & Signature of Bidder
BANK GUARANTEE FOR E. M. D. - form attached separately
Seal & Signature of Bidder
NAME OF DISIGNATED BANKS:
Approved Banks for Bank Guarantee for EMD and SD valid up to 31-03-2027.
1. Bank Guarantees to be submitted against SD / EMD as per Cl. No. 12 of GCC
& against Performance Guarantee as per Cl. No. 19 of SCC & wherever
applicable shall be furnished by following banks:
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
i. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD / EMD for the period
up to 31-03-2027. The validity cut-off date in GR is with respect to date of issue
of Bank Guarantee irrespective of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagarik Sahkari Bank Ltd
Seal & Signature of Bidder
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-Operative Bank
42. The Banaskantha Mercanttile Co-Operative Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, SD Cum
Performance Bank Guarantee for Supply & Warranty will not be acceptable.
Seal & Signature of Bidder
Performance Guarantee (PG)- form attached separately
Seal & Signature of Bidder
NAME OF DISIGNATED BANKS:
Approved Banks for Bank Guarantee for EMD and SD valid up to 31-03-2027.
1. Bank Guarantees to be submitted against SD / EMD as per Cl. No. 12 of GCC
& against Performance Guarantee as per Cl. No. 19 of SCC & wherever
applicable shall be furnished by following banks:
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
i. All Nationalized Banks.
(C) Guarantees issued by following Banks will be accepted as SD / EMD for the period
up to 31-03-2027. The validity cut-off date in GR is with respect to date of issue
of Bank Guarantee irrespective of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagarik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
Seal & Signature of Bidder
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-Operative Bank
42. The Banaskantha Mercanttile Co-Operative Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, SD Cum
Performance Bank Guarantee for Supply & Warranty will not be acceptable.
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.50, 000/- , kindly take sign of two bank officer
with their respective Employee code no.
3. Valid Confirmation letter of the concerned Bank in an approved format should be
attached with every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper
should not be beyond six months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G
Seal & Signature of Bidder
ON STAMP PAPER OF `300/-
FORM OF BANKER’S UNDERTAKING
[For Performance Guarantee (PG) for Warrantee Period
As per Commercial Terms and Conditions of Tender ]
Bank Guarantee No._______________ Issued on dated:______________
We Bank of _______________________________________ (Name & Address of
issuing Bank) hereby agree unequivocally and unconditionally to pay immediately on
demand in writing from the Gujarat Energy Transmission Corporation Ltd. or any
Officer authorized by it in this behalf any amount up to and not exceeding
to the said Gujarat Energy Transmission Corporation Ltd. on Behalf of
who have entered into a contract for the supply/works specified below -
This agreement shall be valid and binding on this Bank up to and inclusive of
__________and shall not be terminable by notice or by change in the constitution of the
Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
“NOTWITHSTANDING anything contrary contained in any law for the time being in force
or banking practice, this Guarantee shall not be assignable, transferable by the
beneficiary (i.e. GETCO). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation
of the Guarantee can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to `__________(Rupees_____________________________
____________Only). Our of guarantee shall remain in force until
__________________(Date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before________ (Date of
validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged all liabilities there under:
Please mention here complete Postal Signature of the Bank’s
Address of the Bank with Branch code, Authorized Signatory with
Telephone and Fax Nos. Official Round Seal
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Part 1 Tender Specifications E-424 TR bays Dahej Zagadiya.pdf
2.Ammendment -1 of part-1 E-424 TR bays Dahej Zagadiya.pdf
3.Tender Notice E-424 TR bays Dahej Zagadiya.pdf
4.PP-220kV Dahej - Zagadiya SS.pdf
5.BOQ Estimate quantity Dahej SS.pdf
6.BOQ Break up Dahej SS.pdf
7.BOQ Structure Dahej SS.pdf
8.BOQ Estimate quantity Zagadiya SS.pdf
9.BOQ Break up Zagadiya SS.pdf
10.BOQ Structure Zagadiya SS.pdf
11.220KV SLD DAHEJ S.S. 01.01.25-Model.pdf
12.R8-LAYOUT SECTION OF 220KV DAHEJ SS DT 190924-Model.pdf
13.R15-PART LAYOUT PLAN OF 220kV DAHEJ SS DT 17.09.24-R15.pdf
14.R3-SLD OF 220KV ZAGADIA SS DT 22.04.24-Model.pdf
15.R8-LAYOUT SECTION OF 220KV ZAGHADIA SS DT22.04.24-Model.pdf
16.R13-PART LAYOUT PLAN OF 220kV ZAGHADIA SS DT.22.04.24-R13.pdf
17. SD cum PBG Format.pdf
18.Public Procurement Circular of GOI.pdf
19.Form for Networth Annual turnover LA.pdf
20.66 kV Isolator R6 June- 22.pdf
21.Amendment - 22.06.2023.pdf
22.66 kV CT and PT - PH R2 Jun-22.pdf
23.66 KV LA R6 June 22.pdf
24.220 132 KV and 66kV CB (R5) with FDN plan.pdf
25.220 kV CT and PT R10 Jun -22.pdf
26.400 220 132 66 KV BPI R4 June-22.pdf
27.400 220 132 kV LA R6 June 22.pdf
28.400 220 132 kV DB Tandem Isolator R6 June 22.pdf
29.Terminal Connectors R2 June 22.pdf
30.AL59 ZEBRA and MOOSE GETCO- R3 Print copy.pdf
31.EARTH WIRE - R4 - Print copy.pdf
32.EARTH WIRE ACCESSORIES 7-3.15 PRINT COPY.PDF
33.G.I. EARTHING STRIPS.PDF
34.HW and ACCS AL59 CONDUCTOR PRINT COPY R2 JULY 2022.pdf
35.LT Control and Power Cable Print COPY.PDF
36.MQP SUPPLIER COPY.PDF
37.MS PLAIN and TOR BAR.PDF
38.R1 - STEEL DRUM.pdf
39.R5 - Silicon Rubber Insulator - Print Copy.pdf
40.SS HW 220 and 400KV SS PRINT COPY.PDF
41.WEDGE CONNECTORS R1 July-22.pdf
42.HW and ACCS MOOSE CONDUCTOR.pdf
43.HW and ACCS ZEBRA CONDUCTOR R3 Oct 22.PDF
44.SS HW 220 and 400KV SS PRINT COPY.PDF
45.Amendment-1 to TS of 66kV CRP_ 180423.pdf
46.Amendment-1 to TS of 400_220_132 kV CRP_ 180423.pdf
47.TS - Bay MK - R2 June 22.pdf
48.TS - CT-PT-CVT JB - R1 June 22.pdf
49.TS - Yard LT ACDB - R2 June 22.pdf
50.TS_66 KV Control and Relay Panels_R6_211123 Final.pdf
51.TS_400_220_132 kV Control and Relay Panels_R8_160922.pdf
52.TS_Protection Relays for 66 kV System_R2_260722 1.pdf
53.TS Cable Tray.pdf
54.TS General Erection R1.pdf
55.TS-Maintenance Free Earthpit 040615.pdf
56.Connection Of Four Electrode Method Of Measuring Soil Resist.pdf
57.DETAILS OF EARTHING FOR D.P.STRUCTURE-Model.pdf
58.DETAILS OF PANEL EARTHING-Model.pdf
59.EARTHING NOTES-Model-3.pdf
60.EARTHING NOTES-Model-4.pdf
61.MAINTENANCE FREE EARTHPITS R3 29.05.20-Normal Soill.pdf
62.MAINTENANCE FREE EARTHPITS R3 29.05.20-Rocky Soill.pdf
63.MEASUREMENT OF EARTH RESISTIVITY-Model.pdf
64.R1 Lightning Arrestor DT 070916.pdf
65.R1 TYPICAL EARTHING ARRANGEMENT FOR CVT-PT DT 070916.pdf
66.R1 Typical Earthing Arrangement for Power Tran DT 070916.pdf
67.SLIDING GATE-Model.pdf
68.Standard Earthing Philosophy of GETCO R1 010708.pdf
69.Standard Guideline for Earthing of EHV SS- GETCO R3 250517.pdf
70.TS-Maintenance Free Earthpit 040615.pdf
71.TYPICAL ARRANGEMENT OF EARTH TEST PIT(CHEAK PIT)-Model.pdf
72.Typical Arrangement of Riser for Earthing System-Model.pdf
73.Typical Arrangement of Welding Joint(NEW)-Model.pdf
74.TYPICAL EARTHING ARRANGEMENT FOR BMK-Model.pdf
75.TYPICAL EARTHING ARRANGEMENT FOR BPI-Model.pdf
76.Typical Earthing Arrangement for Circuit Breaker-Model.pdf
77.TYPICAL EARTHING ARRANGEMENT FOR CT-Model.pdf
78.TYPICAL EARTHING ARRANGEMENT FOR EQUIPMENT OF CAPACITOR BANK.pdf
79.TYPICAL EARTHING ARRANGEMENT FOR ISO.-Model.pdf
80.TYPICAL EARTHING ARRANGEMENT FOR LM-Model.pdf
81.Typical Earthing Arrangement for Switch Yard Gate-Model.pdf
82.TYPICAL EARTHING ARRANGEMENT FOR TOWER WITH PEAK-Model.pdf
83.TYPICAL EARTHING ARRANGEMENT FOR TOWER WITHOUT PEAK-Model.pdf
84.TYPICAL EARTHING ARRANGEMENT OF CABLE TRENCH-Model.pdf
86. TS ILLUMINATION R8 101016.pdf
87. Amendment-I for Illumination TS.pdf
88. Amendment-II for Illumination TS.pdf
89. TYPICAL FITTING LAYOUT.pdf
90. CONTROL ROOM ILLUMINATION.pdf
91. STANDARD LIGHTING POLES 24.12.19.pdf
92.DAS Communication Cable ; RS 485 to RS 232 Converter_1.pdf
93.TS SS STR R11 22.06.2022.pdf
94.TS-Insulating Mat 270312.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .