| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.0 L+₹32,447.71 (4.24%)Admitted-Fee/PreQual/Technical/Finance | ₹8.0 L+₹32,447.71 (4.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.3 L+₹64,721.50 (8.45%)Admitted-Fee/PreQual/Technical/Finance | ₹8.3 L+₹64,721.50 (8.45%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Abey Joseph L3 | POONJAR LABOUR CONTRACT CO OPERATIVE SOCIETY LTD L2 | BHARATH INFRASTRUCTURE DEVELOPERS L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix 1.Extension of kitchen for store room construction | ||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.38 | cum | 3,000 ₹7,143 | 1,550 ₹3,690.55 Lowest | 3,323.06 ₹7,912.21 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 6.13 | cum | 1,800 ₹11,032.2 | 850 ₹5,209.65 Lowest | 1,927.51 ₹11,813.71 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 6.37 | cum | 1,500 ₹9,559.5 | 750 ₹4,779.75 Lowest | 1,083.58 ₹6,905.66 |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 2 | each | 500 ₹1,000 | 280 ₹560 | 134.22 ₹268.44 Lowest |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 6.25 | cum | 2,250 ₹14,062.5 | 700 ₹4,375 Lowest | 823.16 ₹5,144.75 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.15 | cum | 8,200 ₹17,613.6 | 6,600 ₹14,176.8 Lowest | 7,179.27 ₹15,421.07 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.35 | cum | 10,500 ₹35,164.5 | 8,900 ₹29,806.1 Lowest | 9,492.34 ₹31,789.85 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 13.57 | sqm | 700 ₹9,502.5 | 480 ₹6,516 | 349.47 ₹4,744.06 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 8.39 | cum | 600 ₹5,033.4 | 480 ₹4,026.72 Lowest | 660.1 ₹5,537.58 |
Tender Value
₹8.5 L
EMD Value
₹21,153
Closing Date
13 Aug 2026, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer LID and EW Division Kottayam
Annual Plan-DPK 1293/26- Athirampuzha Division- Infrastructure Development of Kudamaloor Govt HSS - General Civil Work
2026_LSGD_863774_32
2/2026-27/AEE/LID and EW
Open Tender
Civil Works - Buildings
Item Rate
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,153
Yes
16 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1.Extension of kitchen for store room construction | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.003 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | - | cum | - | - |
| 1.004 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.005 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | - | cum | - | - |
| 1.006 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.009 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
epay.pdf
Tender Documents • 0.24 MB
viewsbd.pdf
Tender Documents • 2.10 MB
affida.pdf
Tender Documents • 0.23 MB
feere.pdf
Tender Documents • 0.33 MB
pa.pdf
Tender Documents • 0.25 MB
fot.pdf
Tender Documents • 0.24 MB
ip.pdf
Tender Documents • 0.24 MB
BOQ_1461300.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .