Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance R O WARD NO 03 KATHUA DISTRICT KATHUA | -28.33% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 LAdmitted-Finance | -27.67% | ₹1.4 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
13 Feb 2026, 6:00 pmClosed
ER VIJAY KUMAR
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_302463_7
77 of 2025-26 dated 05-02-2026
Open Tender
Civil Works
15 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹3,980
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
1 Apr 2026
6 Feb 2026
14 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
9 Feb 2026
Earth work in excavation by mechanical means hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) with all leads and lifts carriage complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_981598.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid