Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Regarding the deployment of water tankers at various locations within the Navrangpura Ward (West Zone) to address complaints—such as low water pressure, water contamination, and lack of water supply—as well as to facilitate other operational requirements of the Water Department.
365483
3/26-27 (T.N.98)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
13 Nov 2026
13 Nov 2026
13 Nov 2026
26 Nov 2026
13 Nov 2026
120 days
1. Name of Work :- Vhegtœ lt ylwmk^tlu <&t yLg vtKe Ft<tle ftbdehe btxu
sYhegt< bwsc Jtuzobtkk swœe swœe søgtytuyu vtKelt xuLfh mÃjtg
fhJtlt ftb ctc<..
Rs.9,99,950/-(exclusive of GST). GST will be paid
2. Tender Estimated Cost :- extra by AMC/Authority at prevailing rate to the
1% of the Tender Cost in the form (Rs.10,000.00)
3. Earnest Money :-
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draft of Rs.900.00
6. Time-Limit : 12 months
7. Validity Period : 120 Days
(i) Last Date of Submission of the :
: a) In Sealed cover in duplicate copies by
Registered Post A.D, or by Courier.or hand
(ii) Mode of Sending delivery
b) Tender sent by ordinary post will be rejected out
(iii) Description essential to be :
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening : Dt..27.11.2026 , 15:00 hrs
: Submission of EMD. Tender fee and other Documents
during office hours: On 27-11-2026 Upto 12:00 hrs. West
Place of Submission & Opening
10. Zone, 2nd Floor, A.M. Office, Stadium Sub Zonal Office,
of Tender Nr. Panchshil Water Tank, Naranpura Railway Crossing
(1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting
Penalty Due to Delay of work above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
12. Defect Liability : As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff,
Time permitted to start parts
13. whether minor or major of part thereof of any amount,
the contractor shall be bound to start the works within
48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through
letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in
hours of intimation as above by contractor the
contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
14 GST ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
Contractor's Sign Depty .C.E.
Mobil No:- (west zone)
AHMEDABAD MUNICLPAL CORPORATION
Name of Work :- vrµb Ítullt lJhkdvwht Jtuzobtk swœt swœt rJM<thbtkk&e ytJ<e jtu «uNh le Vhegtœ,vtuÕgwNl le Vhegtœ <&t vtKe l ytJJt le
Vhegtœ lt ylwmk^tlu <&t yLg vtKe Ft<tle ftbdehe btxu sYhegt< bwsc Jtuzobtkk swœe swœe søgtytuyu vtKelt xuLfh mÃjtg fhJtlt ftb ctc<.
Name of Zone:West Zone
Sr. No. Quantity Item Unit Rate Amount
Supplying Potable Water Tanker To Be Filled From
private bore With 30 Meter Delivery Pipe. The Tanker
Should Be Supplied As & Where Reuired & When Order
2857 Placed By Engineer In - Charge The Rate Includes The
1 Fuel Charge, Drivers Charge Etc..Complete. Trip 350
CONTRACTOR'S SIGNATURE Depty.CITY ENGINEER
& STAMP (West Zone)
As per account department(A.M.C.) circular no. 10 Dt.05/08/2024 Bank guarantee of said
work must be of Ahmedabad city branch, which mentioned as bellow.
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up
(1) Commercial Banks :
1) A U SMALL FINANCE BANK
3) BANDHAN BANK
4) CITY UNION BANK
6) DBS BANK INDIA LIMITED
8) EQUITAS SMALL FINANCE BANK
9) FEDERAL BANK
15) IDFC FIRST BANK
16) INDUSLND BANK
17) JANA SMALL FINANCE BANK
18) KARNATAKA BANK
19) KARUR VYSYA BANK
20) KOTAK MAHINDRA BANK
21) SOUTH INDIAN BANK
22) TAMILNADU MERCANTILE BANK
23) UTKARSH SMALL FINANCE BANK
(2) Co-Operative Banks of Gujarat
1) The Ahmedabad Mercantile Co –Oparative bank limited
2) Kalupur commercial Co-operative Bank limited
3) Nutan Nagrik Sahakari Bank limited
4) Saraswt Co-operative Bank
5) SVC Co-operative Bank
6) THE Cosmos Co-operative Bank
7) Baroda Gramin Bank
8) Saurashtra Gramin Bank
9) THE Gujarat State Co-operative Bank
10) The Mehsana Urban Co-Operative Bank Ltd.
11) The surat district Co-operative Bank
12) The surat peoples Co-operative Bank
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case progress
is delayed, contractor shall be penalized 0.1% of Tender amount per day for work done after time
limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills
of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved"
by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall
be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner
as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation
of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in work man like manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish
to the Corporation Security Deposit of 3% (Three percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Depty.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
(1) The work sha ll be com pleted w ithin 12 Mont h.
(2) The co ntractor shall be remain responsi bl e for Workmen’s compensat ion if any whe n
such ca se occurs. The contractor shall a rra nge formed iampasant nig ht and fencing and
pagi a nd shall be responsible for any damage o f life and l imb or pro perty if any happe n,
dur ing the execution of work. In c ase of di spute for unsee n or overlooked items the
decisio n of the city Engineer shall be final. The contractor sha ll have to give site clea n
of all r ubbish on com pletion of work and h ave over the building with final fi nishi ng of
the work as directed. All the rejected materials shall be remo ved from site within 2
hours by contra ctor at this rsk a nd co st .
(3) Fo r mixi ng morta r either for masonry or for pla ster or for any other purpose contra ctor
shall have to prepa re through of bigger size and mix t he mortar in t he re quired
proportio n. In on ca se he shal l be al lowed to mix the morta r ei ther on floor or any
finishe d surface s.
(4) The cont ractor sha ll have to make his own a rrangem ent for water required for the work
and sha ll pay the wate r charges a s per w ater m eter.
(5) If any extr a item crops up dur ing the progr ess of work the sam e shal l be ca rrie d out by
the contractor a nd he shal l be paid at the rate fixed by C.E. as per the rate analysis
based o n current ma rk et rates.
(6) If in t he interest of t he Corporation it is necessary to change either a ny site or the
design of t he propose wo rk the contr actor shall carry out the sam e at his quoted r ates
without charges any e xtra and the contract or will have to carry out the works and he
will be paid at t he ra te quoted by him and no claim for extra for subse que nt cha nges
may be enterta ine d.
(7) Retetion money at the rate of 2% shall be deducte d from every runn ing bi ll of the
contractor and wh ich will be pai d at the tim e of final bill, fo r works costing More tha n
Rs. 10-00 lak hs.
(8) The tender for the wo rk sha ll rem ain ope n for a period (120) days from the date o f
openin g of the tende rs for this work a nd that t he te nde rer sha ll not be a llowed to
withdraw on m odify t he offer on his own duri ng t he per iod. If a ny tende rer withdr aw
or m akes any m odifications (s) or addition (s) in the term s and conditions of his tende r
not acceptable to the Municipa l Corpora tio n the Munici pa l Corporation shall without
prej udice to any right or rem edy be at l iber ty to forfeit in full t he said ear nest m oney
(9) As pe r Circular No . M CR 2176 (96) 2418 (ii) GHH dated 31-03-77 i ssued by Go vernm ent
of Guj arat contra ctors are requested to produce t hei r qua rry m at erials for co nstr uctio n
work through le gal so urces. i .e. only form the qua rry lease hold ers, permit holde r or
middle ma n who sat isfies the contractor as to the legality of the source of purchase by
him o n these mate rials.
(10) Contracto r has to make his own a rra ngement fo r proc urement of steel and cem ent.
(11) Conditional tender wil l not be accepte d.
(12) All te nder s are to be submitte d i n duplicate without which the
(13) tenders are lia ble to be rejected.
(14) Condition of form B1 Standard Specification of mat erial & code of practice will be
applic able. Form B1 & B2 can be is avail able on website.
Contr actor’s Signat ure Depty. City Engineer
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
NAVARANGPURA WARD
TECHNICAL SPECIFICATIONS
ftblw ltb: vrµb Ítullt lJhkdvwht Jtuzobtk swœt swœt rJM<thbtkk&e ytJ<e jtu «uNh le Vhegtœ,vtuÕgwNl le Vhegtœ <&t vtKe l ytJJt
le Vhegtœ lt ylwmk^tlu <&t yLg vtKe Ft<tle ftbdehe btxu sYhegt< bwsc Jtuzobtkk swœe swœe søgtytuyu vtKelt xuLfh mÃjtg fhJtlt
Item No.1 :- Supplying Potable Water Tanker To Be Filled From private bore With 30 Meter Delivery Pipe.
The Tanker Should Be Supplied As & Where Reuired & When Order Placed By Engineer In -
Charge The Rate Includes The Fuel Charge, Drivers Charge Etc..Complete.
Mode of measurement
Measurement shall be paid by Trip basis.
Contr actor’s Signat ure Depty. City Engineer
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - vrùb Ítul
y.Bgw.ftu. vrùb Ítul Ítulj ytuVem,
ztuo. hbKCtR vxuj CJl, WMbtlvwht, ybœtJtœ.
vrùb Ítul xuLzh ltuxem lk.- 03/2026-27 btk ytJhe juJtguj ftbtule ÂJd<tu
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl) bégt
ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf duhkxe&e zevtuÍex
Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu Jfoytuzohle <theF&e mbg
bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn ytJu <tu rlgbtlwmth ftgoJtne
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 rœJm hnuNu.
4. xuLzh MJefthÔþk, hesu¾x fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg ftuLx[t¾xh
Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhÔþk
vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu LþfNtl
&Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb >hBgtl bswh fu
sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle hnuNu. vtujem Vhegt> &tg
<tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk
ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegtœbtk
sJtcœth hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s
8. yt xuLzh su <u Jdolt btLg gtœelt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo. btk
btLg ftuLx[t¾xhle gtœebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu <&t
MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl øþsht< çþf
Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe s xuLzh ChÔþk.
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftgœtfeg jexeduNl yb>tJtœ Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt
ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE sJtltu Fao
vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle hnuNu.
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo >lt
Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh hœ fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬tu fu J¤<hle btkdKe
fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt
hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftgœt Bþsc su ftuE hfble fvt< fhJtlt nwfb mhfth©eyu fhuj
ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk ytJNu.
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance work as per Engineer instruction
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the
contractor shall be bound to start the works within 48 hours of intimation of work. Communication done
telephonically via SMS ,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be
levied penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30Lakhs).
3. Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise
justified properly in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and
comply with the prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 98.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .