| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.9 L+₹53,278.60 (9.98%)Rejected-AOC THANIMOLAL HOUSE MEENANGADI WAYANAD | MEENANGADI | WAYANAD | KERALA | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Akhil Paul L2 | Gentex Solutions Pvt Ltd L1 |
|---|---|---|---|---|---|
| 1.00Investigation works | |||||
| 1.00 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | 0.6 | Hectare | 4,000 ₹2,400 Lowest | 4,500 ₹2,700 |
| 1.00 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | 2.2 | Hectare | 9,703 ₹21,346.6 Lowest | 10,500 ₹23,100 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 15,798 ₹15,798 Lowest | 25,000 ₹25,000 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 10 | Bore Holes | 3,000 ₹30,000 Lowest | 5,000 ₹50,000 |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 60 | metre | 900 ₹54,000 Lowest | 1,000 ₹60,000 |
| 1.01 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 60 | metre | 900 ₹54,000 | 10 ₹600 Lowest |
| 1.01 | 56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | 40 | metre | 1,100 ₹44,000 | 500 ₹20,000 Lowest |
| 1.01 | 56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | 40 | metre | 1,200 ₹48,000 | 10 ₹400 Lowest |
| 1.01 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | 30 | metre | 1,500 ₹45,000 Lowest | 1,500 ₹45,000 Lowest |
Tender Value
₹6.8 L
EMD Value
₹17,117
Closing Date
8 Jun 2026, 2:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PWD BRIDGES SUB DIVISION MANJERI
GENERAL-Investigation work for Areecode parallel bridge in Eranad LAC, Malappuram District.-Investigation work-Investigation Work
2026_PWD_853471_1
PWD/BR/TR/1404/2025_3_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
90 days
MANJERI
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,510
Yes
₹17,117
Yes
24 Jul 2026
30 May 2026
10 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Investigation works | |||||
| 1.001 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | - | Hectare | - | - |
| 1.002 | 56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. | - | Hectare | - | - |
| 1.003 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | - | set | - | - |
| 1.004 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | - | Bore Holes | - | - |
| 1.005 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.006 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.007 | 56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | - | metre | - | - |
| 1.008 | 56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. | - | metre | - | - |
| 1.009 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1442384.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .