Tender Value
₹24.5 L
EMD Value
₹24,500
Closing Date
21 Aug 2026, 5:00 pmClosed
Superintending Engineer, Kendjhar (RandB) Division
O/o the Superintending Engineer, Kendujhar (R and B) Division, Kendujhar - 758001
Construction of Tahasil Office meeting hall (Conference Hall) at Keonjhar as per Revenue and DM Deptt. Lr. No. 10473 dt. 10.03.2026 Buildings.
2026_EICCL_138598_1
PWDK 12/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Keonjhar
3 documents required · 3 mandatory
₹6,000
₹24,500
Yes
25 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
12 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 37.21 | sqm | 8.63 | ₹321.12 |
| 2 | Earthwork in excavation of foundation in all kind of soil (Hard Soil & Ordinary Soil) within 50m initial lead and 1.5m, initial lift including shoring,shuttering, propping bullahs, piling,dewatering from foundation, with & working pumps & staking the excaveted materials away from the working area including rough dressing the bed and foundation tranches to required size including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge (Excavation up to 1.5m height) | 44.01 | cum | 311.52 | ₹13,710 |
| 3 | Supplying and filling in foundation and plinths with sand well watered and compacted including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, DMF, EMF, Additonal Charges, watering, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | 16.29 | cum | 797.92 | ₹12,998.12 |
| 4 | Providing and laying plain cement concrete (1:3:6)(using branded cement) in foundation using 4 cm size hard crusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying and compacting to proper thickness, watering and curing for the required period including cost of all material, labour, conveyance, loading and unloading, taxes,cess, royalties, DMF, EMF, Additonal Charges, scaffolding, watering, curing, sundries, tools and plants,etc. ,complete as per the direction of the Engineer-in-charge. | 8.97 | cum | 6,099.21 | ₹54,709.91 |
| 5 | Filling foundation and plinth with excavated earth ramming etc complete as per approved drawing and technical specifications complete in all respect & as per direction of the Engineer-in-Charge. | 14.67 | cum | 173.07 | ₹2,538.94 |
| 6 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum conpressive strength (in work test) 250 Kg/ Square cm. in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12mm to 20mm size black hard crushed broken granites stone chips and screened and washed sharp sand for mortary of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25%) to be mized in concrete mixture with portland slag cement (PSC) including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necesary incuding cost, conveyance, loading, unloading, royalties, DMF, EMF, Additonal Charges and taxes of all materials with cost of all labours, sundries, T & P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge.
i) RCC Footing | 8.42 | cum | 6,935.92 | ₹58,400.45 |
| 7 | ii) R.C.C Plinth Band | 2.25 | cum | 7,810.33 | ₹17,573.24 |
| 8 | iii) R.C.C Columns Ground Floor | 4.24 | cum | 16,318.77 | ₹69,191.58 |
| 9 | iv) R.C.C Columns First Floor | 1.13 | cum | 18,395.11 | ₹20,786.47 |
| 10 | v) RCC Beam Ground Floor | 2.01 | cum | 16,318.77 | ₹32,800.73 |
stage.html
html • 0.02 MB
finance_605874.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 11.89 MB
Tendernotice_1.pdf
PDF • 3.06 MB
BOQ_605874.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .