| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.1 L+₹59,003.40 (23.3%)Rejected-Finance | ₹3.1 L+₹59,003.40 (23.3%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹3.3 L+₹74,797.40 (29.5%)Rejected-Finance 143 C DR RAJENDRA ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹3.3 L+₹74,797.40 (29.5%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹3.9 L+₹1.4 L (53.8%)Rejected-Finance | ₹3.9 L+₹1.4 L (53.8%) | L4 | Rejected-Finance L4 BIDDER |
| 5 | L5₹3.9 L+₹1.4 L (54.1%)Rejected-Finance 2 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹3.9 L+₹1.4 L (54.1%) | L5 | Rejected-Finance L5 BIDDER |
| Sl No | Description | Qty | Unit | MAHESWAR ELECTRICAL INDUSTRIES L5 | FRIENDS ELECTRIC L1 | THE SHEER ELECTRIC L2 | A. B. ELECTRIC AND SOUND L4 | BIKASH ENTERPRISE L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00CONTROL PANEL AND SWITCHES:- Providing on hire basis following switches etc. and fixing on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismantling the same after completion of work (with PWD / E.I.C. approved materials) | ||||||||
| 1.01 | 415V, 63 amp TPN switch with rewirable fuse
(For upto 3 days) | 6 | Item | 150 ₹900 | 50 ₹300 Lowest | 500 ₹3,000 | 100 ₹600 | 300 ₹1,800 |
| 1.02 | Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.)
(Qty = 6 Item x 27 No of Days = 162 Item) | 162 | Per item per day | 3 ₹486 | 1 ₹162 Lowest | 10 ₹1,620 | 2 ₹324 | 6 ₹972 |
| 2.00S & Installation on hire basis following switches etc. and fixing on wooden plank board or suitable angle iron frame incl. providing inter conection, socketing, earthing attachment etc. & dismantling the same after completion of work (With PWD approve materials). Incoming: (a) 415 / 220 Volt,63 Amp. TPNIC / DP Main Switch with HRC Fuse - 1(One) No. (b) 415 / 220 Volt, 63 Amp. FP / DP Change Over Switch - 1(One) No. (c) 415 Volt, 100 Amp. capacity Bus Bar chamber with 4 Nos. Cu / Al Bar - 1 No. Out going: (a) 415 / 220 Volt, 32 Amp. TPNIC / DP Main Switch with HRC Fuse - 3 (Three) No. (b) RYB indicating lamp - 3 Nos. (c) E. I. Danger Board - 1 No. (d) Volt meter (0 - 600 volt.) with Selector Switch - 1 No. | ||||||||
| 2.01 | Upto 3 Days. | 6 | Item | 3,200 ₹19,200 | 100 ₹600 Lowest | 490 ₹2,940 | 150 ₹900 | 1,000 ₹6,000 |
| 2.02 | Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.)
(Qty = 6 Item x 27 No of Days = 162 Item) | 162 | Per item per day | 64 ₹10,368 | 2 ₹324 Lowest | 9.8 ₹1,587.6 | 3 ₹486 | 20 ₹3,240 |
| 3.00CABLE LAYING:- Providing & drawing on hire basis main wiring with 1.1 KV grade Aluminium Conductor PVC XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same after completion of work and mending good the damages. | ||||||||
| 3.01 | 4 Core 16 Sq. mm PVC / XLPE armoured cable per meter ( For upto 3 days) | 100 | Mtr | 33 ₹3,300 | 25 ₹2,500 | 10 ₹1,000 | 8 ₹800 | 0.4 ₹40 Lowest |
| 3.02 | Next 22 Days after 3 Days. (@ 2% of the rate of first 3 days per day.)
(Qty = 100 Mtr x 27 No of Days = 2700 Mtr) | 2,700 | per Mtr per day | 0.66 ₹1,782 | 0.5 ₹1,350 | 0.2 ₹540 | 0.16 ₹432 | 0.01 ₹21.6 Lowest |
| 4.00Supplying and drawing on Hire basis Three Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire (2x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter after completion of work. | ||||||||
Tender Value
Refer Docs
EMD Value
₹8,933
Closing Date
13 Sept 2025, 12:30 pmClosed
AE KNESD II
P5, CIT Road, Moulali, Kolkata
Temporary Electrification works for preparedness of temporary illumination along with the Service Road, Cut Outs, Foot Paths adjacent to VIP Road, Kolkata, during Durga Puja 2025
2025_WBPWD_896830_1
WBPWD/AE/KNESD-II/eNIT06/25-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
Baguihati
Please refer Tender Documents
4 documents required · 4 mandatory
₹8,933
7 Sept 2026
1 Sept 2025
16 Sept 2025
1 Sept 2025
13 Sept 2025
6 Sept 2025
Amount
CONTROL PANEL AND SWITCHES:- Providing on hire basis following switches etc. and fixing on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismantling the same after completion of work (with PWD / E.I.C. approved materials)
415V, 63 amp TPN switch with rewirable fuse (For upto 3 days)
Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 6 Item x 27 No of Days = 162 Item)
Upto 3 Days.
Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 6 Item x 27 No of Days = 162 Item)
CABLE LAYING:- Providing & drawing on hire basis main wiring with 1.1 KV grade Aluminium Conductor PVC XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same after completion of work and mending good the damages.
4 Core 16 Sq. mm PVC / XLPE armoured cable per meter ( For upto 3 days)
Next 22 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 100 Mtr x 27 No of Days = 2700 Mtr)
Supplying and drawing on Hire basis Three Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire (2x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter after completion of work.
Upto 3 Days.
Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3500 Mtr x 27 No of Days = 94500 Mtr)
FITTINGS & FIXTURE:- Supplying & providing/fixing 100 watt LED Flood light complete on hire basis with bracket and clamps on the pole including dismantling after completion of work incl. replacement of fused lamp (As per direction of E.I.C.)
Upto 3 Days.
Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 330 Each x 27 No of Days = 8910 Each)
Earthing:- Providing Earthing arrangement on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same after completion of work
Upto 3 Days.
Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 12 Each x 27 No of Days = 324 Each)
Deployment of Man Power:- Deployment of One no. Electrician and one Helper for each shift i.e. for 1 shift for caring out all kind of El maintenance
Note:- 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 7.00). 2) The bidder is bound to quote exact unit rate maximum upto 2% of the base rate of 1st 3 days per day calculated upto 2nd decimal value as required against Item SI. Nos. 01.02, 02.02, 03.02, 4.02, 04.04, 05.02, 5.04, 06.02 as spelt out in the BOQ deviation from which will cause the rejection of the bid. 3) No compensation will be allowed to the agency In case of any loss/ damage of the temporary electrical installations including all electrical items mentioned in the BOQ.
THE SHEER ELECTRIC (BID ID -6924135)
BIKASH ENTERPRISE (BID ID -6908098)
A. B. ELECTRIC AND SOUND (BID ID -6926180)
MAHESWAR ELECTRICAL INDUSTRIES (BID ID -6909945)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .