| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 CrAccepted-AOC 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | ₹17.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.9 Cr+₹2.1 L (0.12%)Rejected-AOC A 77 FIRST FLOOR SECTOR 2 NOIDA GAUTAM BUDDHA NAGAR GHAZIABAD UTTARPRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹17.9 Cr+₹2.1 L (0.12%) | L2 | Rejected-AOC L2 |
| 3 | L3₹18.5 Cr+₹59.0 L (3.29%)Rejected-AOC C 504 ATS BOUQUET TOWER C 5TH FLOOR SECTOR 132 NOIDA 201305 | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | 201305 | ₹18.5 Cr+₹59.0 L (3.29%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical A 1305 EMPIRE BUSINESS HUB SCIENCE CITY ROAD SOLA AHMEDABAD GUJARAT 380060 | AHMEDABAD | AHMEDABAD | GUJARAT | 380060 | - | - | Rejected-Technical Not Qualifying |
Tender Value
₹19.2 Cr
EMD Value
₹25 L
Closing Date
30 Jul 2024, 6:00 pmClosed
Chief Engineer Generation Ladakh
Office of the Chief Engineer Generation Wing Choglamsar Leh Ladakh
Design, Supply, Installation and Commissioning of Grid Connected/Hybrid Solar Photovoltaic Power Plants on Government Buildings including system warranty and compressive maintenance contract (CMC) for five (05) years in Kargil District of UT Ladakh
2024_PDNRE_13096_1
NIT-EPDK-03 of 06/2024, dt 19/06/2024
Open Tender
Power/Energy Projects/Products
Turn-key
270 days
Kargil District
Please refer Tender documents.
3 documents required · 3 mandatory
₹25,000
Yes
Pay and Accounts Officer PDC Kargil
₹25 L
Yes
Office of the Chief Engineer Generation Wing Leh
3 Oct 2024
19 Jun 2024
2 Aug 2024
19 Jun 2024
30 Jul 2024
21 Jun 2024
29 Jun 2024
ON GRID ROOFTOP SOLAR
SITC of 40kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 80no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 40kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2400 mtr. 7) 1C x 10 sqmm AC Copper cable = 240 mtr. 8) MC4 connectors = 120 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 24 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 8 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 35kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 70 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 35kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2100 mtr. 7) 1C x 10 sqmm AC Copper cable =210 mtr. 8) MC4 connectors = 105 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 21 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 7 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 25kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr. 7) 1C x 10 sqmm AC Copper cable = 150 mtr. 8) MC4 connectors = 75 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 15 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 20kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5)20kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1200 mtr. 7) 1C x 10 sqmm AC Copper cable = 120 mtr. 8) MC4 connectors = 60 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 12 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 15kW, 48 volt solar MPPT On Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 9000 mtr. 7) 1C x 10 sqmm AC Copper cable = 90 mtr. 8) MC4 connectors = 45 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr. 7) 1C x 10 sqmm AC Copper cable =60 mtr. 8) MC4 connectors = 30 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 8kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr. 7) 1C x 10 sqmm AC Copper cable = 48 mtr. 8) MC4 connectors = 24 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr. 7) 1C x 10 sqmm AC Copper cable = 30 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 50kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 200 mtr. 7) 1C x 10 sqmm AC Copper cable = 25 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
HYBRID
SITC of 20kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 20kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 32 no. 7) 1C x 4 sqmm DC copper cable = 1200 mtr. 8) 1C x 10 sqmm AC Copper cable = 120 mtr. 9) MC4 connectors = 60pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 16 no. 7) 1C x 4 sqmm DC copper cable = 600 mtr. 8) 1C x 10 sqmm AC Copper cable = 60 mtr. 9) MC4 connectors = 30pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =10 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 8 no. 7) 1C x 4 sqmm DC copper cable = 300 mtr. 8) 1C x 10 sqmm AC Copper cable = 30 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =6 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 3kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 4 no. 7) 1C x 4 sqmm DC copper cable = 200 mtr. 8) 1C x 10 sqmm AC Copper cable = 25 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
tendernotice.pdf
Tender Notice • 0.04 MB
BOQ_32966.xls
BOQ Document • 0.29 MB
146499510.pdf
Tender Document • 0.05 MB
146499511.pdf
Tender Document • 1.23 MB
SBD.pdf
Tender Document • 1.22 MB
TechnicalSpecification.pdf
Tender Document • 0.39 MB
146499513.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .