| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 CrAccepted-AOC 00 YAKUBPUR NEAR PRIMARY SCHOOL YAKUBPUR YAKUBPUR BULANDSHAHR UTTAR PRADESH 203001 | BULANDSHAHR | UTTAR PRADESH | 203001 | ₹17.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.9 CrRejected-AOC IIND FLOOR A 77 SECTOR 2 NOIDA GAUTAM BUDDHA NAGAR GHAZIABAD UTTARPRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹17.9 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹18.5 CrRejected-AOC C 504 ATS BOUQUET TOWER C 5TH FLOOR SECTOR 132 NOIDA 201305 | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | 201305 | ₹18.5 Cr | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical A 1305 EMPIRE BUSINESS HUB SCIENCE CITY ROAD SOLA AHMEDABAD GUJARAT 380060 | AHMEDABAD | AHMEDABAD | GUJARAT | 380060 | - | - | Rejected-Technical Not Qualifying |
Tender Value
₹19.2 Cr
EMD Value
₹25 L
Closing Date
30 Jul 2024, 6:00 pmClosed
Chief Engineer Generation Ladakh
Office of the Chief Engineer Generation Wing Choglamsar Leh Ladakh
Design, Supply, Installation and Commissioning of Grid Connected/Hybrid Solar Photovoltaic Power Plants on Government Buildings including system warranty and compressive maintenance contract (CMC) for five (05) years in Kargil District of UT Ladakh
2024_PDNRE_13096_1
NIT-EPDK-03 of 06/2024, dt 19/06/2024
Open Tender
Power/Energy Projects/Products
270 days
Kargil District
Please refer Tender documents.
3 documents required · 3 mandatory
₹25,000
Yes
Pay and Accounts Officer PDC Kargil
₹25 L
Yes
Office of the Chief Engineer Generation Wing Leh
3 Oct 2024
19 Jun 2024
2 Aug 2024
19 Jun 2024
30 Jul 2024
21 Jun 2024
29 Jun 2024
ON GRID ROOFTOP SOLAR
SITC of 40kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 80no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 40kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2400 mtr. 7) 1C x 10 sqmm AC Copper cable = 240 mtr. 8) MC4 connectors = 120 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 24 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 8 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 35kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 70 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 35kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 2100 mtr. 7) 1C x 10 sqmm AC Copper cable =210 mtr. 8) MC4 connectors = 105 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 21 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 7 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 25kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr. 7) 1C x 10 sqmm AC Copper cable = 150 mtr. 8) MC4 connectors = 75 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 15 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 20kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5)20kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 1200 mtr. 7) 1C x 10 sqmm AC Copper cable = 120 mtr. 8) MC4 connectors = 60 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 12 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 15kW, 48 volt solar MPPT On Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 9000 mtr. 7) 1C x 10 sqmm AC Copper cable = 90 mtr. 8) MC4 connectors = 45 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr. 7) 1C x 10 sqmm AC Copper cable =60 mtr. 8) MC4 connectors = 30 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 8kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr. 7) 1C x 10 sqmm AC Copper cable = 48 mtr. 8) MC4 connectors = 24 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 5kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 300 mtr. 7) 1C x 10 sqmm AC Copper cable = 30 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
SITC of 3kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 50kW, 48 volt solar MPPTOn Grid based=1no. 6) 1C x 4 sqmm DC copper cable = 200 mtr. 7) 1C x 10 sqmm AC Copper cable = 25 mtr. 8) MC4 connectors = 15 pairs as per requirement 9) ACDB = 1 no. 10) Earthing (as per TS) = 3 no. 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement) 12) Solar meter Uni-Directional = 1 no. materials and including all labour charges etc complete
HYBRID
SITC of 20kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 40 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 20kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 32 no. 7) 1C x 4 sqmm DC copper cable = 1200 mtr. 8) 1C x 10 sqmm AC Copper cable = 120 mtr. 9) MC4 connectors = 60pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 10kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 16 no. 7) 1C x 4 sqmm DC copper cable = 600 mtr. 8) 1C x 10 sqmm AC Copper cable = 60 mtr. 9) MC4 connectors = 30pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =10 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 5kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 8 no. 7) 1C x 4 sqmm DC copper cable = 300 mtr. 8) 1C x 10 sqmm AC Copper cable = 30 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC =6 no. 2) Module mounting structure (as per TS) = 1 set 3) Array Junction Box = 1 no. 4) DCDB = 1 no. 5) 3kW, 48 volt solar Off-Grid PCU MPPT Hybrid based=1no. 6) Tubular LMLA Typer Battery 160 AH @ C10 at 27 degree with battery racks = 4 no. 7) 1C x 4 sqmm DC copper cable = 200 mtr. 8) 1C x 10 sqmm AC Copper cable = 25 mtr. 9) MC4 connectors = 15 pairs as per requirement 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no. 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1set (as per requirement) 14) Solar meter Uni-Directional = 1 no.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid