Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC 71 GOLA MAHAL SADAR BAZAR BARRACKPORE KOLKATA 700120 | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | ₹2.6 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.8 Cr+₹15.5 L (5.99%)Rejected-Finance 9 EZRA STREET KOLKATA 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹2.8 Cr+₹15.5 L (5.99%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹2.8 Cr+₹24.0 L (9.24%)Rejected-Finance PASCHIM BHAGABANPORE DARUA CONTAI PURBA MEDINIPUR 721401 | PURBA MEDINIPUR | PURBA MEDINIPUR | WEST BENGAL | 721401 | ₹2.8 Cr+₹24.0 L (9.24%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹2.9 Cr+₹25.8 L (9.96%)Rejected-Finance GOKUL APARTMENTS BLOCK C SHIVMANDIR ROAD PUNJABI PARA SILIGURI 734 401 WEST BENGAL | SILIGURI | WEST BENGAL | 734401 | ₹2.9 Cr+₹25.8 L (9.96%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹2.9 Cr+₹27.9 L (10.8%)Rejected-Finance SRIKONA POTAPOLA CHHAKA CHANDIPUR ROAD BALASORE ODISHA 756025 | BALASORE | BALESHWAR | ODISHA | 756025 | ₹2.9 Cr+₹27.9 L (10.8%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | M/s Singh enterprises L7 | M/S R G Construction L8 | M/s KASHMIRA SINGH BARMI AND SONS L4 | Shree Mahabir Builders L1 | S.M.CONSTRUCTIONS L6 | Prasur Electricals & Engineering Co. L2 | RANA ENTERPRISES L3 | bholanath bera L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition & Dismantling of building components :- Demolition of RCC work by mechnical means of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) upto 8th storied complete all as specified and as directed | 24 | Cum | 2,020 ₹48,480 | 2,050 ₹49,200 | 1,440 ₹34,560 Lowest | 2,000 ₹48,000 | 2,000 ₹48,000 | 2,050 ₹49,200 | 2,100 ₹50,400 | 2,055 ₹49,320 |
| 2.00 | Demolition of brick work manually/mechnical means including stacking of serviceable material and disposal of unserviceable material within 50m leas as per direction of engr-in-Charge upto 8th storied complete all as specified and as directed | 10 | Cum | 1,250 ₹12,500 | 1,230 ₹12,300 | 900 ₹9,000 Lowest | 1,200 ₹12,000 | 1,225 ₹12,250 | 1,250 ₹12,500 | 1,200 ₹12,000 | 1,215 ₹12,150 |
| 3.00 | Demolition of PCC floors and pavings n exc 15 cm thickness (below or above ground level) manually/mechnical means including stacking of serviceable material and disposal of unserviceable material within 50m less as per direction of engr-in-Charge upto 8th storied complete all as specified and as directed | 20 | Cum | 1,450 ₹29,000 | 1,450 ₹29,000 | 900 ₹18,000 Lowest | 1,400 ₹28,000 | 1,460 ₹29,200 | 1,500 ₹30,000 | 1,500 ₹30,000 | 1,457 ₹29,140 |
| 4.00 | M & L brick work with sub class 'B' brick straight of curved on plan exc 6m mean radius built in CM 1:6 on wall upto 8th storied complete all as specified and as directed | 10 | Cum | 10,600 ₹1,06,000 | 10,650 ₹1,06,500 | 10,800 ₹1,08,000 | 10,500 ₹1,05,000 | 10,600 ₹1,06,000 | 10,000 ₹1,00,000 Lowest | 11,000 ₹1,10,000 | 10,610 ₹1,06,100 |
| 5.00 | M&L for Repair to sunken portion of toilets :- Dismantling of existing sunken portion upto and including old plastering (i.e upto RCC member). Cleaning of the RCC member and applying approved bonding agent as per Manufacturer Instruction, over 10mm thick plastering in CM (1:4) using liquid WPC by 2% of wt of cement over applying three layers of water proofing coats (epoxy polymer modified) as per approved. Manufacturer and fixing of PVC pipes and floor traps, sanitary appliance and filling with PCC (1:4:8) over providing 50mm thick PCC (1:1.5 :3) using WPC over applying three coats of water proofing treatment. (epoxy/polymer modified) as per standard manufacturer instruction all as specified and directed. upto 8th storied complete all as specified and as directed | 16 | Each Job | 20,515 ₹3,28,240 | 20,500 ₹3,28,000 | 20,700 ₹3,31,200 | 20,000 ₹3,20,000 Lowest | 20,510 ₹3,28,160 | 25,000 ₹4,00,000 | 20,500 ₹3,28,000 | 20,505 ₹3,28,080 |
| 6.00 | Dismantling of loose concrete from RCC members to shape and size to a max depth of 100mm for receiving polymer modified member/micro concrete etc all as specified and directed. (Measurement shall be surface area of member) upto 8th storied complete all as specified and as directed | 600 | Sqm | 165 ₹99,000 | 165 ₹99,000 | 144 ₹86,400 | 125 ₹75,000 | 160 ₹96,000 | 120 ₹72,000 Lowest | 145 ₹87,000 | 150 ₹90,000 |
| 7.00 | M&L for cleaning existing reinforcement wire/ rotary wire brush, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. "Feovert" of "Krishna Conchem" OR "Roff Rust Cleaner' of 'Pidilite' OR 'Shali Rustoff' of 'STP Ltd', on rebars with time interval of 6 hr between the coats, and applying protective coating IPNET-RB complete all as specified and directed. (For four storey bldg of 15 mtr ht) upto 8th storied complete all as specified and as directed | 560 | Sqm | 330 ₹1,84,800 | 325 ₹1,82,000 Lowest | 333 ₹1,86,480 | 325 ₹1,82,000 Lowest | 336 ₹1,88,160 | 330 ₹1,84,800 | 330 ₹1,84,800 | 335 ₹1,87,600 |
| 8.00 | M&L for Anchoring system for rebaring by normal steel bar:- Rebaring by normal steel bars: introducing new reinforcement bars for structural connections in RCC, fixing the reinforcement in position using Hilti HY 150 chemical (Rate shall include cost of labour, epoxy cartridges, plastic nozzle etc complete including cleaning the drilled holes of loose dust by blowing air. (The cost of reinforcement shall be payble seperately) (10mm dia and 120mm depth) upto 8th storied complete all as specified and as directed | 400 | Sqm | 720 ₹2,88,000 | 750 ₹3,00,000 | 774 ₹3,09,600 | 700 ₹2,80,000 Lowest | 717 ₹2,86,800 | 725 ₹2,90,000 | 710 ₹2,84,000 | 715 ₹2,86,000 |
| 9.00 | M&L for Coating Applications Anti Corrosive coating for corroded reinforcement & newly added steel bar :- Providing mixing and applying over reinforcement bars zinc antirust agent as per specification and direction of Engr-in-Charge (Dosage/coverage as per manufacture specification of two component epoxy based zinc rich primer steel as a protective coating to steel reinforcing bars in concrete with total zinc content in dry film>90% by volume and DFT per coat>50 microns) upto 8th storied complete all as specified and as directed | 400 | Sqm | 300 ₹1,20,000 | 315 ₹1,26,000 | 225 ₹90,000 Lowest | 250 ₹1,00,000 | 309 ₹1,23,600 | 240 ₹96,000 | 300 ₹1,20,000 | 307 ₹1,22,800 |
| 10.00 | Bonding Agent:- Providing and applying bonding agent of approved brand coverage and specification of manufactures (Mixed density: 1.48 Kg/Ltr, adhesive bond strength to be >2.50MPa) Epoxy bonding agent upto 8th storied complete all as specified and as directed | 600 | Sqm | 415 ₹2,49,000 | 418 ₹2,50,800 | 360 ₹2,16,000 | 350 ₹2,10,000 | 412 ₹2,47,200 | 340 ₹2,04,000 Lowest | 400 ₹2,40,000 | 409 ₹2,45,400 |
Tender Value
₹2.6 Cr
EMD Value
₹3.3 L
Closing Date
14 Mar 2026, 6:00 pmClosed
GE (I) (CG N) KOLKATA
GE (I) (CG N) KOLKATA
SPECIAL REPAIR OF MOHAN SINGH BUILDING (N 19) AT INS NETAJI SUBHAS KOLKATA UNDER GE (I) (CG N) KOLKATA
2026_MES_752680_1
8701/65/2025-2026/04/E8
Open Tender
Civil Works
Item Rate
450 days
Kolkata
All as per tender documents
9 documents required · 9 mandatory
₹2,000
GE (I) (CG N)
₹3.3 L
Yes
23 Apr 2026
13 Feb 2026
16 Mar 2026
13 Feb 2026
14 Mar 2026
8 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition & Dismantling of building components :- Demolition of RCC work by mechnical means of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) upto 8th storied complete all as specified and as directed | 24 | Cum | - | - |
| 2 | Demolition of brick work manually/mechnical means including stacking of serviceable material and disposal of unserviceable material within 50m leas as per direction of engr-in-Charge upto 8th storied complete all as specified and as directed | 10 | Cum | - | - |
| 3 | Demolition of PCC floors and pavings n exc 15 cm thickness (below or above ground level) manually/mechnical means including stacking of serviceable material and disposal of unserviceable material within 50m less as per direction of engr-in-Charge upto 8th storied complete all as specified and as directed | 20 | Cum | - | - |
| 4 | M & L brick work with sub class 'B' brick straight of curved on plan exc 6m mean radius built in CM 1:6 on wall upto 8th storied complete all as specified and as directed | 10 | Cum | - | - |
| 5 | M&L for Repair to sunken portion of toilets :- Dismantling of existing sunken portion upto and including old plastering (i.e upto RCC member). Cleaning of the RCC member and applying approved bonding agent as per Manufacturer Instruction, over 10mm thick plastering in CM (1:4) using liquid WPC by 2% of wt of cement over applying three layers of water proofing coats (epoxy polymer modified) as per approved. Manufacturer and fixing of PVC pipes and floor traps, sanitary appliance and filling with PCC (1:4:8) over providing 50mm thick PCC (1:1.5 :3) using WPC over applying three coats of water proofing treatment. (epoxy/polymer modified) as per standard manufacturer instruction all as specified and directed. upto 8th storied complete all as specified and as directed | 16 | Each Job | - | - |
| 6 | Dismantling of loose concrete from RCC members to shape and size to a max depth of 100mm for receiving polymer modified member/micro concrete etc all as specified and directed. (Measurement shall be surface area of member) upto 8th storied complete all as specified and as directed | 600 | Sqm | - | - |
| 7 | M&L for cleaning existing reinforcement wire/ rotary wire brush, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. "Feovert" of "Krishna Conchem" OR "Roff Rust Cleaner' of 'Pidilite' OR 'Shali Rustoff' of 'STP Ltd', on rebars with time interval of 6 hr between the coats, and applying protective coating IPNET-RB complete all as specified and directed. (For four storey bldg of 15 mtr ht) upto 8th storied complete all as specified and as directed | 560 | Sqm | - | - |
| 8 | M&L for Anchoring system for rebaring by normal steel bar:- Rebaring by normal steel bars: introducing new reinforcement bars for structural connections in RCC, fixing the reinforcement in position using Hilti HY 150 chemical (Rate shall include cost of labour, epoxy cartridges, plastic nozzle etc complete including cleaning the drilled holes of loose dust by blowing air. (The cost of reinforcement shall be payble seperately) (10mm dia and 120mm depth) upto 8th storied complete all as specified and as directed | 400 | Sqm | - | - |
| 9 | M&L for Coating Applications Anti Corrosive coating for corroded reinforcement & newly added steel bar :- Providing mixing and applying over reinforcement bars zinc antirust agent as per specification and direction of Engr-in-Charge (Dosage/coverage as per manufacture specification of two component epoxy based zinc rich primer steel as a protective coating to steel reinforcing bars in concrete with total zinc content in dry film>90% by volume and DFT per coat>50 microns) upto 8th storied complete all as specified and as directed | 400 | Sqm | - | - |
| 10 | Bonding Agent:- Providing and applying bonding agent of approved brand coverage and specification of manufactures (Mixed density: 1.48 Kg/Ltr, adhesive bond strength to be >2.50MPa) Epoxy bonding agent upto 8th storied complete all as specified and as directed | 600 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_843051.xls
BOQ • 1.67 MB
newtender.pdf
Tender Documents • 2.09 MB
amd.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .