Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹44.7 L+₹3.6 L (8.75%)Rejected-AOC ARACKAL HOUSE VARAPPETTY KOTHAMANGALAM | IDUKKI | KERALA | 685501 | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹45.4 L+₹4.2 L (10.3%)Rejected-Finance | L3 | Rejected-Finance L3 bidder | |
| 4 | L4₹46.7 L+₹5.6 L (13.6%)Rejected-Finance | L4 | Rejected-Finance L4 bidder | |
| 5 | L5₹47.4 L+₹6.3 L (15.2%)Rejected-Finance | L5 | Rejected-Finance L5 bidder |
Tender Value
₹52.4 L
EMD Value
₹50,000
Closing Date
30 Sept 2023, 11:45 amClosed
JointDirectorof SoilConservation
DirectorateofSoilSurveyandSoilConservationVAzhuthacaudThiruvananthapuram
Retaining Wall
2023_DSSC_604751_1
SSSC/1956/2023-PG(1)/IP4
Open Tender
Civil Works - Others
Item Rate
180 days
Veliyamattom Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,755
₹50,000
27 Oct 2023
19 Sept 2023
3 Oct 2023
19 Sept 2023
30 Sept 2023
19 Sept 2023
Amount
Plain Cement Concrete Retaining Wall 1.50 m height 368 Rm
Earth work excavation for Desilting, Side Cutting LHS and RHS ,Foundatin LHS and RHS as per code 2.6.1
Rock Anchoring Works : Providing dowel bars of 12 mm dia bar of 100 cm long hooked at one end in 50 cm deep holes fixed with cement grouting including cost and conveyance of steel, labour charges etc complete as per code OD1254/2023-2024
Form Work for Foundation : Centering and Shuttering for foundation outside and inside ( LJHS & RHS ) as per code 4.3.1
Cement Concrete Work 1:2:4 for Foundation: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering ,all works up to plint level 1:2:4 as per code 4.1.3
Form work for Retaining wall for Super structure : Centering and shuttering including strutting ,propping etc as per code 4.3.2
Cement Concrete Work 1:3:6 for Super Structure : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering ,all works up to plint level 1:3:6 as per code 4.1.5
Reinforced Cement Concrete Retaining Wall 1.50 m height 40 Rm
Earth work excavation for Desilting, Side Cutting LHS and RHS ,Foundatin LHS as per code 2.6.1
Rock Anchoring Works : Providing dowel bars of 12 mm dia bar of 100 cm long hooked at one end in 50 cm deep holes fixed with cement grouting including cost and conveyance of steel, labour charges etc complete as per code OD1254/2023-2024
Form Work for Foundation : Centering and Shuttering Including shuttering etc as per code 5.9.1
Steel Reinforcement for R.C.C Works as per code 5.22.6
Form work for Superstructure Including shuttering etc as per code 5.9.2
Cement Concrete 1:2:4 for foundation and superstructure as per code 5.1.3
Binu A.S
K I JOSE
Antony Varkey
Y and Y constructions
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_901054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .