Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.7 LAccepted-AOC MANIKETTY HOUSE NELLIYANKAD STREET CHITTUR P O PALAKKAD 678101 | CHITTUR | PALAKKAD | KERALA | 678101 | ₹84.7 L | L1 | Accepted-AOC LIACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | MURALEEDHARAN.M L1 | K.HARIDAS L2 |
|---|---|---|---|---|---|
| 1.00POND RENOVATION | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 550 | hour | 345.54 ₹1.9 L | 345.54 ₹1.9 L |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 132.1 | cum | 1,197.33 ₹1.6 L | 1,197.33 ₹1.6 L |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 298.44 | cum | 257.63 ₹76,888.39 | 257.63 ₹76,888.39 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 38.01 | cum | 8,569.14 ₹3.3 L | 8,569.14 ₹3.3 L |
| 1.00 | OD243414/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 62.56 | cum | 1,715.88 ₹1.1 L | 1,715.88 ₹1.1 L |
| 1.01 | OD243584/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 771.82 | cum | 3,993.46 ₹30.8 L | 3,993.46 ₹30.8 L |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 105.7 | cum | 10,488.77 ₹11.1 L | 10,488.77 ₹11.1 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 323.4 | sqm | 386.16 ₹1.2 L | 386.16 ₹1.2 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 12,041.49 | kilogram | 112.43 ₹13.5 L | 112.43 ₹13.5 L |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
11 Sept 2025, 5:00 pmClosed
AE LSGD,CTMC
AE LSGD,CTMC
AMRUT-BHAGAVATHIKULAM- REJUVENATION IN CTMC
2025_LSGD_792592_1
E1/407808/2025
Open Tender
Civil Works - Others
chittur thathamangalam municipality
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
20 Feb 2026
30 Aug 2025
12 Sept 2025
30 Aug 2025
11 Sept 2025
30 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1307984.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid