Tender Value
₹4.6 L
EMD Value
Exempted
Closing Date
6 Oct 2025, 3:00 pmClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 1 Verification of wiring connections
cable healthiness and other components
control and interlock checks for field signals from FPP LCP to RTU pan..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 2 Rerouting/Laying of cables of various sizes having OD up to 50mm from FPP LCPs located in different buildings to MCR; As per tender document
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 Glanding of cables of various sizes having OD upto 50mm
including supply of required lugs
ferrules
heat shrinkable sleeves
other accessories; ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 4 Termination and connection of individual core of instrumentation pair cable which includes supply of required consumables
soldering
etc; As per..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 5 Fabrication of canopy (Approx size 1100X800X600mm) for fire protection instruments as per technical specification; As per tender document
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 6 Removal of WLD in cable trenches and re-installation of WLD on one foot height mounting structure/trench walls as per technical specification
s..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 7 Removal of ASKs in cable spreader areas and re- installation of ASKs on walls as per technical specification
scope includes supply of required anc..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 8 Installation of IFM with switch and connecting cables in Control panels in MCR
HCR and BCR as per technical specification; As per tender document
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 9 Front door modification works in RTU panel pertaining to Reactor Assembly Instrumentation as per specifications; As per tender document
8379123
GEM/2025/B/6708148
Two Packet Bid
Repair
603102, BHAVINI PFBR PLANT SITE KALPAKKAM
Total value wise evaluation
SERVICE
3 documents required · 3 mandatory
Exempted
25 Sept 2025
25 Sept 2025
6 Oct 2025
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 1 Verification of wiring connections
cable healthiness and other components
control and interlock checks for field signals from FPP LCP to RTU pan..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 2 Rerouting/Laying of cables of various sizes having OD up to 50mm from FPP LCPs located in different buildings to MCR; As per tender document
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 Glanding of cables of various sizes having OD upto 50mm
including supply of required lugs
heat shrinkable sleeves
other accessories; ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 4 Termination and connection of individual core of instrumentation pair cable which includes supply of required consumables
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 5 Fabrication of canopy (Approx size 1100X800X600mm) for fire protection instruments as per technical specification; As per tender document
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 6 Removal of WLD in cable trenches and re-installation of WLD on one foot height mounting structure/trench walls as per technical specification
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 7 Removal of ASKs in cable spreader areas and re- installation of ASKs on walls as per technical specification
scope includes supply of required anc..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 8 Installation of IFM with switch and connecting cables in Control panels in MCR
HCR and BCR as per technical specification; As per tender document
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 9 Front door modification works in RTU panel pertaining to Reactor Assembly Instrumentation as per specifications; As per tender document
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8379123.pdf
GEM_BID
1758351349.pdf
OTHER
1758708515.pdf
OTHER
1758708531.pdf
OTHER
NIT_79f01423-a090-470c-9d4d1758708629891_jaywant.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .