Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC SUBASH GRAM DIGLIPUR NORTH ANDAMAN ANDAMAN AND NICOBAR ISLANDS 744202 | DIGLIPUR | NORTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744202 | ₹4.9 L | 1 | Accepted-AOC lowest Bid |
| 2 | Rejected-Technical | - | - | Rejected-Technical Incomplete or Missing Documents |
| 3 | Rejected-Technical | - | - | Rejected-Technical Incomplete or Missing Documents |
| 4 | Rejected-Technical | - | - | Rejected-Technical Incomplete or Missing Documents |
| Sl No | Description | Qty | Unit | M/s Mohammed Shamim L1 |
|---|---|---|---|---|
| 1.00 | Dismantling of Streetlight fitting for repair and refitting after repair. | 360 | Nos | 449 ₹1.6 L |
| 2.00 | Installation of New / old repaired Streetlight fitting on existing pole. | 240 | Nos | 398 ₹95,520 |
| 3.00 | Minor repairs work to be attended on the spot without dismantling the fitting from the pole. | 40 | Nos | 228 ₹9,120 |
| 4.00 | Dismantling of existing streetlight fitting. | 240 | Nos | 199 ₹47,760 |
| 5.00 | Dismantling of Streetlight timer switches for repair and refitting after repair. | 12 | Nos | 525 ₹6,300 |
| 6.00 | Installation of new Streetlight timer switches. | 5 | Nos | 375 ₹1,875 |
| 7.00 | New installation or replacement of defective cutouts/MCB/Circuit Breakers. | 20 | Nos | 120 ₹2,400 |
| 8.00 | Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse. | 15 | Nos | 121 ₹1,815 |
| 9.00 | Switching ON/OFF of streetlights circuits through cutout operation. (Cutout -14 x 365 days) | 1,825 | Nos | 30 ₹54,750 |
| 10.00 | Charges for engaging staff per month for attending upto 20 complaints. (12 Months) | 12 | Nos | 9,445 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹10,400
Closing Date
18 Apr 2026, 5:00 pmClosed
PRADHAN
Gram Panchayat Kalighat Diglipur N and M Andaman
ANNUAL REPAIR AND MAINTENANCE OF STREET LIGHTS OF ALL WARDS UNDER GRAM PANCHAYAT KALIGHAT NORTH ANDAMAN
2026_RDPRI_22415_1
2-13/GP/KG/Tndr/Quo/25-26/332
Open Tender
AMC/ Maintenance Contracts
365 days
GP KALIGHAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,400
Yes
15 Jun 2026
18 Mar 2026
20 Apr 2026
19 Mar 2026
18 Apr 2026
19 Mar 2026
19 Mar 2026 - 18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Streetlight fitting for repair and refitting after repair. | 360 | Nos | - | - |
| 2 | Installation of New / old repaired Streetlight fitting on existing pole. | 240 | Nos | - | - |
| 3 | Minor repairs work to be attended on the spot without dismantling the fitting from the pole. | 40 | Nos | - | - |
| 4 | Dismantling of existing streetlight fitting. | 240 | Nos | - | - |
| 5 | Dismantling of Streetlight timer switches for repair and refitting after repair. | 12 | Nos | - | - |
| 6 | Installation of new Streetlight timer switches. | 5 | Nos | - | - |
| 7 | New installation or replacement of defective cutouts/MCB/Circuit Breakers. | 20 | Nos | - | - |
| 8 | Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse. | 15 | Nos | - | - |
| 9 | Switching ON/OFF of streetlights circuits through cutout operation. (Cutout -14 x 365 days) | 1,825 | Nos | - | - |
| 10 | Charges for engaging staff per month for attending upto 20 complaints. (12 Months) | 12 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 0.40 MB
TECHNICALBIDAMCKalighat.pdf
Tender Documents • 0.38 MB
BOQ_23740.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid