| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAdmitted-Finance T STATE BANJARAWALA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹21.3 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualfied |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualfied |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | SHRI BALAJI ASSOCIATES L1 |
|---|---|---|---|---|
| 1.00 | A. SUPPLY AND INSTALLATION WORK:
Design, engineering, manufacture, supply, installation, testing and commissioning of machine room-less (MRL) Passenger Elevator (08 Passengers capacity, 544 Kgs. min.); at NHPC Tanakpur Power Station, as per specifications | 1 | JOB | 13,73,845 ₹13,73,845 Lowest |
| 2.00 | B. CIVIL WORK:
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 20.21 | Cum | 260.3 ₹5,260.66 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources | 1.16 | Cum | 7,294.7 ₹8,461.85 Lowest |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.73 | Cum | 9,045.75 ₹42,786.4 Lowest |
| 5.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). | 1.7 | Cum | 7,370.65 ₹12,530.1 Lowest |
| 6.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu?ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.32 | Cum | 10,852.95 ₹46,884.74 Lowest |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.17 | Cum | 11,505.5 ₹47,977.93 Lowest |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Hot rolled deformed bars | 1,887.45 | Kg | 107.85 ₹2,03,561.48 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 63.6 | Sqm | 640 ₹40,704 Lowest |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 35.92 | Sqm | 410 ₹14,727.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
5 May 2026, 11:30 amClosed
Group Senior Manager (Contracts)
Procurement- Contract Divison, Tanakpur Power Station, Banbassa, Champawat, UK-262310
Design, engineering, manufacture, supply, installation, testing and commissioning of machine room-less (MRL) Passenger Elevator (08 Passengers capacity, 544 Kgs. min.) at NHPC Tanakpur Power Station
2026_NHPC_902920_1
NH/TPS/PnC/NIT/2026/E 154866 /1161/969 dt 18/03/2026
Open Tender
Civil Works
Works
120 days
NHPC Ltd. Tanakpur Power Station, Banbasa
As per Tender Documents
5 documents required · 5 mandatory
₹590
NHPC Ltd. Tanakpur Power Station
₹43,000
Yes
26 Aug 2026
19 Mar 2026
8 May 2026
19 Mar 2026
5 May 2026
19 Mar 2026
19 Mar 2026 - 29 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A. SUPPLY AND INSTALLATION WORK: Design, engineering, manufacture, supply, installation, testing and commissioning of machine room-less (MRL) Passenger Elevator (08 Passengers capacity, 544 Kgs. min.); at NHPC Tanakpur Power Station, as per specifications | |||||
| 2B. CIVIL WORK: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources | |||||
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 5Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). | |||||
| 6Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 7Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | |||||
| 8Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Hot rolled deformed bars | |||||
| 9Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
| 10Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.34 MB
CPP-Tender-1161.pdf
Tender Documents • 6.40 MB
BOQ_949026.xls
BOQ • 0.26 MB
corri-I-1161.pdf
PDF • 1.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].