Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC L1 |
Tender Value
₹7.5 L
EMD Value
₹14,945
Closing Date
5 Mar 2026, 3:00 pmClosed
O/O the Executive Engineer, Div-IV, AMC
O/O the Executive Engineer, Div-IV, AMC
Const of pucca drain with RCC Salb and Imp Of road by CC st from HO Abha Debbarma to HO Parimal Ghosh at AK Lane Dhaleswar ward office under ward no23 AMC 2nd call
2026_SAMC_70955_1
DNIET-02/Div-IV/AMC/2025-26
Open Tender
Civil Works
90 days
under ward no-23
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹14,945
Yes
5 Jun 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying dry flat brick flooring in required pattern complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) with neat cement punning
Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering all works upto plinth levelt with 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_72203.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_72203.xls
BOQ • 0.28 MB
DNIET02.pdf
Tender Documents • 2.88 MB
Download all tender documents and submit your bid