Tender Value
₹36.5 L
EMD Value
₹37,000
Closing Date
27 Apr 2026, 6:00 pmClosed
Executive Engineer, Sabarantha R & B Panchayat Division, Himmatnagar
Constructing Compound Wall / Protection Wall At M.P.C Building At Village - Vandhol & Badrakha Under New Gujarat Pattern - 2025-26, Ta. - Vijaynagar Dist. - Sabarkantha
292725
19/2025-26
Open
Civil Works - Others
Works
Sabarkantha
₹1,500
Executive Engineer, Panchayat R & B Division, Himatnagar
₹37,000
1 Apr 2026
1 Apr 2026
1 Apr 2026
27 Apr 2026
1 Apr 2026
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
1 Excavation for foundation upto 1.50 mt depth 275.00 67.90 Cum
including sorting out and stacking of useful
materials and disposing the excavated stuff
with all lead (A) Loose or soft soil.
2 Providing and laying cement concrete 1:4:8 (1 35.00 2165.54 Cum
cement : 4 coarse sand : 8 stone aggregates
40 mm. nominal size) and curing complete
excluding cost of from work in :(a) Foundation
and plinth.
3 Providing and laying controlled cement 13.00 4325.53 Cum
concrete M200 for curing complete including
cost of formwork but excluding the cost of
reinforcement for reinforced concrete work in
(A) Foundations, footings, Base of columns
and Mass concrete.
4 Providing and laying controlled cement 12.00 6095.35 Cum
concrete M-200 and curing complete including
the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in
Plinth BEAMS
5 Uncoursed Rubble Masonry with hard stone 62.00 2020.04 Cum
ofapproved quality in foundations and plinth in
CementMortar 1:5 (1-ement : 5-coarse sand
includinglevelling up etc. complete
6 Brick work using common Brunt clay building 60.00 4324.30 Cum
bricks having crushing strength not less than
35 Kg./Sq.cm.. In super structure above
plinth level upto floor two level in cement
mortar 1:6 (1cement : 6 fine sand) (b)
Conventional {Ground FLoor }
7 Providing and laying controlled cement 14.10 7838.61 Cum
concrete M-200 and curing complete including
the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in
Columns, pillars, posts and struts up to floor
two level for Columns For All Floors.
Description of Item
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
8 20 mm. Thick sand faced GUTAKA 614.00 321.10 Sqm
FINISHED cement plaster on walls upto 10 mt
height above ground level consisting of
mm. Thick backing coat of c.m. 1:3 (1 cement
: 3 sand) and 8 mm. Thick finishing coat of
c.m. 1:1 (1 cement : 1 sand) including
making groove 6 mm wide and 8 mm
deep as approved pattern etc. complete as
9 Providing T M T. bar reinforcement of FE 15785.00 77.29 Kg.
500D for R.C.C. work including bending
binding and placing in position complete up to
All floor Level
10 Providing and fixing M.S. grills / Gates of 1026.00 106.29 Kg.
required pattern to brick walls / Columns
prepared with M.S. flats, angles, Square /
round bars, square pipes, at required
spacings with necessary hold fasts as per
detailed drawing and fixing brick walls / coping
/ columns etc. complete including painting two
coat & applying primer coat.
11 Finishing wall with weather proof exterior 614.00 73.75 Sqm
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove
all dirt, and remains of loose powdered
materials etc complete.
12 Providing and fixing RAZOR Coil with Blade 146.00 404.00 Rmt
16MM, Clips per Spiral-5, Hot Dipped
Galvanized 200 GSM, Tape Thickness
MM, GI Spring Core Wire 2.60MM Thick {avg
weight 9.50 Kg / 6 mt}, and supported with
barbered wire Five rows in M.S. Angle posts
45 mm. X 45 mm. X 6 mm. and oil painting
coats fixed at 2.5 mt. C/c strained and fixed to
posts with G.I. staples, including fixing posts
in compound wall
13 Excavation for foundatiuon upto 1.5 m depth 44.00 253.85 Cum
incl. Sorting out & stacking of useful material
& disposing of the excavated stuff upto 50m.
Lead. (B) Dense or hard soil.
Description of Item
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
14 Providing and filling in foundation with 4.40 3345.58 Cum
ordinary cement concrete M- 100 mix and
providing necessary vertical pin headers
including formwork, vibrating, ramming and
curing complete.
15 Providing and filling in foundation with 75.00 3715.63 Cum
ordinary cement concrete M- 150 mix and
providing necessary vertical pin headers
including formwork, vibrating, ramming and
curing complete.
16 Providing and laying Weep hole in abutment 120.00 86.73 No
and return by using PVC. pipe of 100 mm dia
including laying in proper grade and joining
complete etc as per details specification.
17 Providing and laying - Fitter Media 600mm 144.00 1238.93 Sqm
thick directed at the back of abutments,
returns and wing walls as per detailed
specifications.
18 White washing with lime on wall surface (two 71.00 12.73 Sqm
coats) to give an even shade including
thoroughly booming the surface to remove all
dirt, dust; mortar drops and other foreign
19 Excavation for foundation in sand, gravel, clay 212.00 511.45 Cum
soft soils and murrum etc. including shoring,
strutting dewatering as necessary and
disposing of the excavated stuff as directed.
(A) Depth upto 3.0 M. and lead upto 100m for
20 Providing and casting in-situ controlled 144.00 4659.10 Cum
cement concrete M 250 for R.C.C raft and cut
off walls including necessary shuttering,
laying vibrating, ramming and curing
Description of Item
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
21 Filling available excavated earth (excluding 167.00 136.92 Cum
rock) in trenches. plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth
consolidating each disposited layer by
ramming and watering.
Total Rs.
Rupees ThirtySix Lakh FourtySix Thousand FourtyEight and Paisa FourtyFive Only
I / We / am/are willing to carry out the work at ________________________________% above / below
percent (should be written in figure and words) of the estimated rates mentioned above. Amount of
my/our tender Works out as under.
Estimated Amount Estimated Amount
put to tender Rs. _________ put to tender Rs. _________
Deduct_______% below Add_______% Above
Net Rs._________ Net Rs._________
in words ___________ in words ___________
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signeture of Contractor
Dy. Executive Engineer Executive Engineer
Panchayat R.&B. Sub Division Panchayat R.&B. Division
Vijaynagar Himatnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ - Vijaynagar - MPC Building At Vandhol and Badrakha.pdf
BUILDING WORK BOOKLET.pdf
General Specification - Building.pdf
GR - 1.pdf
GR - 2.pdf
SBD Book_2023_Vijaynagar - MPC Building At Vandhol and Badrakha.pdf
Specification Index - Vijaynagar - MPC Building At Vandhol.pdf
Work Details - Vijaynagar - MPC Building At Vandhol and Badrakha.pdf
ROAD SPECIFICATION.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .