Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.6 L+₹34,652.35 (4.22%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.9 L+₹64,017.92 (7.79%)Rejected-AOC KOOTAPPURAKKAL HO POTTA KUMBALACODE PO PAZHAYANNUR 680587 THRISSUR | PAZHAYANNUR | THRISSUR | KERALA | 680587 | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.9 L+₹66,020.81 (8.04%)Rejected-AOC KOOTTUPURAKKAL | L4 | Rejected-AOC L4 |
Tender Value
₹10 L
EMD Value
₹25,000
Closing Date
12 Dec 2019, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OTHE ASSISTANT ENGINEER PZR GP
Work Name Pazhayannur G P 2019-20 Punchappadam culvert Proj No 293
2019_LSGD_327278_1
1/AE/LSGD/PZR/19-20
Open Tender
Civil Works - Others
Item Rate
120 days
PAZHAYANNUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,240
online
₹25,000
14 May 2020
5 Dec 2019
16 Dec 2019
5 Dec 2019
12 Dec 2019
5 Dec 2019
Amount
Culvert in Mord Roads
od266361/2019_2020 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete ( Modified data 60.2.2)
2.5.2.B : Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
od266459/2019_2020 : Filling with quarry muckFilling up low lying areas with local material/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 mI.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
13.1.1.1 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5I.R.C.C grade M 20(i)For nominal mix 1:2:4
13.3 : Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
JAYAPRAKASAN.K
K.M.ABBAS
MUHAMMEDBASHEER.KA
Bidder Name
MUHAMMEDBASHEER.KA
KM.HAMZA
K.M.ABBAS
JAYAPRAKASAN.K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .