| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | ₹15.3 L | L1 | Accepted-AOC Being L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically qualified it is cancelled being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically qualified it is rejected being L3 |
| Sl No | Description | Qty | Unit | Johny John j k L2 | SONI ASOK B L3 | GIREESH R V L1 |
|---|---|---|---|---|---|---|
| 1.00APPENDIX A | ||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 72.39 | cum | 2,130 ₹1.5 L | 1,750 ₹1.3 L | 2,122.97 ₹1.5 L |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 5.98 | cum | 610 ₹3,647.80 | 300 ₹1,794 | 608.61 ₹3,639.49 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 179.85 | cum | 300 ₹53,956.50 | 300 ₹53,956.50 | 300.43 ₹54,033.84 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.98 | cum | 6,600 ₹39,468 | 7,000 ₹41,860 | 6,625.2 ₹39,618.70 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 15 | sqm | 299 ₹4,485 | 225 ₹3,375 | 298.47 ₹4,477.05 |
| 1.01 | OD241040/2025-2026:For removing and resetting double scaffolding system using materials available at site and disposing it from the site after site requirement in all respect as directed by departmental officers at site. | 50 | sqm | 300 ₹15,000 | 180 ₹9,000 | 222.44 ₹11,122 |
| 1.01 | 6.4.1:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 0.78 | cum | 5,500 ₹4,290 | 8,000 ₹6,240 | 8,914.68 ₹6,953.45 |
| 1.01 | OD240533/2025-2026:Derived from Specification 7.2.1: Random rubble masonry with hard stone in foundation of depth up to 1.5m and superstructure above plinth up to 3.50m of the retaining wall in Cement mortar 1:6 (1 cement : 6 coarse sand) including all material, labour etc. complete as per the direction of engineer in charge. | 62.88 | cum | 6,600 ₹4.2 L | 6,750 ₹4.2 L | 7,047.16 ₹4.4 L |
| 1.01 | OD240058/2025-2026:Derived from Specification7.2.1: Random rubble masonry with departmental supply hard stone in foundation of depth 1.5m and super structure above plinth up to 3.5m of retaining wall in cement mortar 1:6 (1 cement: 6 coarse sand) including all material, labour etc. complete as per the direction of engineer in charge. | 46.05 | cum | 7,000 ₹3.2 L | 7,000 ₹3.2 L | 5,873.99 ₹2.7 L |
Tender Value
₹18.8 L
EMD Value
₹46,971
Closing Date
20 Jan 2026, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Vikasbhavan Section Reconstruction of damaged East Side Random Rubble Retaining and compound wall of KSCC campus Thiruvananthapuram Civil work
2026_PWD_827148_1
TR/22585/2025_5_1_1/1
Open Tender
Civil Works - Buildings
60 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹46,971
Yes
25 Apr 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
APPENDIX A
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
OD241040/2025-2026:For removing and resetting double scaffolding system using materials available at site and disposing it from the site after site requirement in all respect as directed by departmental officers at site.
6.4.1:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand)
OD240533/2025-2026:Derived from Specification 7.2.1: Random rubble masonry with hard stone in foundation of depth up to 1.5m and superstructure above plinth up to 3.50m of the retaining wall in Cement mortar 1:6 (1 cement : 6 coarse sand) including all material, labour etc. complete as per the direction of engineer in charge.
OD240058/2025-2026:Derived from Specification7.2.1: Random rubble masonry with departmental supply hard stone in foundation of depth 1.5m and super structure above plinth up to 3.5m of retaining wall in cement mortar 1:6 (1 cement: 6 coarse sand) including all material, labour etc. complete as per the direction of engineer in charge.
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
OD241012/2025-2026:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications excluding priming coat, preparation of surface, etc. complete. On steel work
OD240060/2025-2026:Providing and fixing PVC pipe for the weep holes to the stem of retaining wall, including cutting and fixing the pipe between vertical faces shutters of the stem including all material and labour charges etc. complete, following approved design drawing and as per the direction of Engineer-in-Charge, 110mm PVC pipe 6kgf/cm2
OD241068/2025-2026:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
OD240770/2025-2026:Hire and running charges of light crane of capacity 15T.
OD240771/2025-2026:Hire charges of JCB for clearing the site and other allied works.
OD240774/2025-2026:Tipper for removal of all debris and all excavated waste materials away from site.
OD240772/2025-2026:Cutting branches of trees over hanging above any structures of girth below 30cm including of stacking of serviceable materials and disposal of unserviceable materials,cost of labour,hire charges of rop and pully etc with out making any damages to nearby structures etc. complete.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
OD240059/2025-2026:labour engaged for removing waste materials and cleaning the premises , other petty works etc
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1387949.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 2.67 MB
BOQ_1387949.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid