Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
11 Dec 2026, 2:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Groupwise
Lowest to Highest
Please see item details
Not Applicable
120 days
Expenditure
General
60
5 conditions · 2 needing a document upload
Bulk order will be placed on the manufacturer or its authorized agent. The manufacturer firm must have satisfactorily executed at least one single purchase order for a minimum of 20 percent of the total tender quantity of Zonal Railways/ PUs/ CORE/ Metro stations or airports or in any office/service buildings/hospitals of central govt./state govt./PSUs of central or state government for the items having same specification OR for the items having RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 3) -2019 dt.14/01/19, during 5 (five) previous financial years and current financial year up to date of tender closing. Supply Particulars i.e. R-Notes/CRN/CRAC etc. should be accompanied with satisfactory commissioning report for any consideration
Every bidder must submit the following documents along with the offer for the scrutiny of tender committee: A.1 Typical general arrangement/ layout diagram, which shall convey the following minimum information: a. Vertical rise b. Horizontal span length with break-up of constant span at upper and lower landing c. Step width d. Handrail type e. Handrail centre to centre distance f. Width of truss g. Width of escalator h. Width of lower end opening i. Detailed pit dimensions j. Width of top end opening k. Intermediate support, if involved A.2 Clause-by-clause confirmation of compliance to/ deviation from attached RDSO specification. A.3 Technical information asked for in Cl. 8.0 of attached RDSO specification.
EMD Clause: : Tenderers are required to deposit Earnest Money equivalent to the amount mentioned in the tender document. There shall be no exemption from submission of Earnest Money for any tender or by any tenderer except as per Para 3.3 of Instructions to Tenderers for Electronic Tenders (Version: NFR-Jan 2025). All vendors, exempted from submitting EMD, irrespective of the type of tender, i.e, Single, Limited or Open, shall be required to sign a Bid Securing Declaration as per proforma available on bidders interface for payment of EMD on IREPS portal. Offers of tenderers, who do not submit Earnest Money and are also not exempted form submission of Earnest Money shall be summarily rejected.
OEM or Authorized dealer/representative of OEM : The Tenderer must be an Original Equipment Manufacturer (OEM) or Authorized dealer/ representative of the OEM of passenger Elevator/Lift (or passenger Escalator in case of Escalator works). In case of authorized dealer/representative of OEM, valid authorization certificate issued by the OEM, specific to the tender, must be submitted along with the tender.
Service Centre set-up : After issue of LOA/award of the contract, the Contractor will set up their local service center(s) at suitable location(s) Guwahati, Agartala, Silchar etc. along with trained technicians fully equipped with maintenance spares, tools & instruments required for prompt attention of the service requests of Lift/Escalator received from Railway Authorities.
35 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
INSPECTION : Prototype inspection shall be carried out by RDSO as per RDSO Specification No. RDSO/PE/SPEC/TL/0095 (Rev. 4)-2026. The final acceptance inspection shall be carried out by TPI. The cost of all inspections, including prototype inspection by RDSO and final acceptance inspection by the TPI, cost of inspection shall be borne by the supplier. Payment for the supplied materials will be released only after successful completion of the final acceptance inspection by the TPI, receipt and installation of the materials in good condition at the consignee's end.
Warranty Clause: : The passenger Elevators/Lifts/Escalators along-with all the associated accessories shall have the warranty of 2 years from the date of certified successful commissioning. Technician should attend the fault/service request within 24 hours of receiving the complaint, otherwise penalty, as mentioned in the tender, shall be imposed.
Marking: Marking as per Governing specification, if not specified therein then, Firms have to supply the material duly embossing/engraving/stenciling the name of manufacturer/supplier and year of manufacture at place which is preferably visible and shall not get worn out during service. If none of the above is possible the same to be marked on packing.
Loading/Unloading: By supplier at consignee's location. The contractor shall make his own arrangements for loading or unloading of all materials at his depot or at work sites. Railways may facilitate the contractor wherever required.
Additional clause: SMS facility : Provision for sending messages through SMS to minimum 10 pre-specified Railway mobile/phone numbers for unusual occurrences must be available in the controller. For creation of messages, requirement of SIM and data charges should have to be borne by the Contractor/Firm till the period covering warranty & CAMC.
Additional clause: Approval/License from the State Govt. Authority : The Contractor/Firm shall, at their own cost, have to obtain the approval/license from the State Govt. authority for operating the Elevators/Lifts/Escalators and also to be renewed periodically at their own cost, as per the prevailing norms of the State Govt; till the entire period covering warranty & CAMC.
Additional clause: Make in India : The manufacturer shall be compliant to the Public Procurement (Preference to Make in India), Order 2017 (as amended from time to time) issued by the Department of Industrial Policy and Promotion (DIPP), Ministry of Commerce and Industry for Make in India.
Additional clause: After issue of LOA/award of the contract, the Contractor will submit the name(s) and address of their local agency/service center(s) along with name(s) and mobile number(s) of the contact person(s) for prompt attention of the service requests of Lift/Escalator received from Railway Authorities.
Additional clause: The rates to be quoted by the tenderers for the equipments including its warranty period, the rates for the CAMC services after warranty period and rates for Manning/Security of lifts/escalators after SITC (wherever applicable) shall be inclusive of all taxes, levies & duties (as applicable), cost of transportation/freight, insurances etc. However, the breakup of basic rate, various taxes, levies, duties, transportation/freight, insurances etc. are to be shown/furnished separately by the tenderers.
Security Deposit : "Firm shall deposit SD @ 5% of total contract value towards Security Deposit subject to max. of Rs.50 lakh. SD from successful tenderer should be received in purchase office within 21 days form the date of communication of acceptance with respect to the purchaser. SD shall remain valid for a period of 60 days beyond the date of completion of all contractual obligations. For details, please browse Para 12.0 of Instructions to Tenderers for Electronic Tenders (Version: NFR-Jan 2025) attached with the tender. There shall be no exemption form submission of Security Deposit for any tender or by any tenderer except:i) The Stores contract cases of value up to Rs.25 lakhs.ii) Other Railways and Government departments in terms of Railway Boards Letter No. 2004/RS/(G)/779/11 dated 24.07.2007. iii) Indian Ordinance Factories in terms of Railway Board Letter No. 92/RS/(G)/363/1 dated 08.04.1993. iv) PSU owned by Ministry of Railways and PSUs for the group of items that are manufactured by them in terms Railway Boards Letter No. 2003/RS/(G)/779/5 dated 10.09.2004. v) In tenders issued against PAC, OEM in whose favour PAC has been issued shall be exempted for submitting SD. KVIC and ACASH shall be exempted from SD from item supplied by them. vi) Vendors registered with Railways for the trade group of the item tendered shall be exempted from SD for orders valued up to their monetary limit of registration. vii) Vendor appearing on the approved vendor list of RDSO/PUs/CORE subject to the approval status being valid on the date of tender closing. viii) Vendors registered with Railways for supply of medicines, medical equipments and consumables are exempted from SD for these items.
Additional Special Conditions of contracts: Tenderers must quote for - (i) Cost of supply, installation, testing, commissioning (SITC) of the Equipment including its Warranty Period, (ii) Cost of Comprehensive All-inclusive Maintenance Contract (CAMC) per year for 10 years period and (iii) Cost of manning for operation/security after SITC (optional for lift/escalator, wherever applicable, if felt necessary). Note: i) Period of CAMC may be worked out/considered judiciously based on codal life of the asset, financial viability and other associated factors. ii) Requirement of manning may be decided judiciously for the lifts/escalators located at critical locations/stations with high footfall/vulnerable to theft/mishandling, if felt necessary by the Division/Unit concerned.
Additional Special Conditions of Contracts: Tender Evaluation would be done on the total cost, ie. (i) Cost of supply, installation, testing, commissioning (SITC) of the equipment including its Warranty Period. (ii) Cost of Comprehensive All- inclusive Maintenance Contract (CAMC) per year for 10 years period.
Additional Special Conditions of Contracts: Provisional Completion Certificate (PCC) shall be issued after the installed asset(s) is/are handed over to the concerned Railway authority for its use. Final Completion Certificate (FCC) against item (i) of Para 10, quoted as Cost of supply installation testing and commissioning (SITC) of the equipent including its warranty period shall be issued after completion of successful warranty period as indicated in Para 4.0 of PCEE office letter issued vide letter no.EL/W/29/0 dated 31.07.24(letter enclosed) as mentioned in "Additional Special Conditions of Contracts."
Additional Special Conditions of Contracts: An additional agreement is to be executed between the Firm and the concerned Divisional authority for the entire CAMC period before issue of FCC. CAMC period shall commence from the next day after issue of the FCC. After issue of FCC (as Indicated in Para 4.0 under "Additional Special Conditions of Contracts of PCEE office letter issued vide letter no.EL/W/29/0 dated 31.07.24) & before executing this additional CAMC agreement, the firm will have to submit equivalent amount of PG (in fresh) w.r.t. total cost of entire CAMC period(as indicated in item ii of Para 1.0 under "Additional Special Conditions of Contracts of PCEE office letter issued vide letter no .EL/W/29/0 dated 31.07.24). After verification of the genuineness of this new/fresh PG, the additional CAMC agreement for the whole CAMC period will be executed. Thereafter, the Railway will return the original Performance Guarantee/Security (as indicated in Para 3.0 under "Additional Special Conditions of Contracts of PCEE office letter issued vide letter no.EL/W/29/0 dated 31.07.24) to the firm as issued vide PCEE office letter no.EL/W/29/0 dated 31.07.24 (letter enclosed)".
Additional Special Conditions of Contracts: The CAMC shall be payable proportionally on quarterly basis subject to satisfactory work undertaken and services provided.
Additional Special Conditions of Contracts: The tenderers have to assess and indicate the life of various wear & tear items (all consumable spares, unit exchange spares, mandatory spares etc. including all safety items) and accordingly plan its replacements during the course of entire CAMC period. No separate charges shall be paid by Railways to the Contractor for its supply and replacement as it is the Comprehensive All-inclusive Maintenance Contract (CAMC) which is being entrusted to them.
Additional Special Conditions of Contracts: All minor civil works like chipping, plaster, cutting of unwanted projection, making of core cutting holes for cable and earthing entry or any other requirement for installation of escalator, filling of any holes, final white wash after all modification works, usage of chemical fasteners if required, making good the tiles, granite damaged during installation and hoisting, modification of as-built civil works to suit their design; i.e. cut out size, new design etc. or any modifications instructed by Railways for installation of the equipment and restoring to final finishes.
Additional Special Conditions of Contracts: The contractor should - a) submit the construction plan, installation drawings/GAD, circuit diagrams for construction to Railway authority, b) arrange training of Railway?s Personnel, c) prepare & submit Operation & Maintenance instruction Manuals to Railway authority.
Additional Special Conditions of Contracts: The Contractor should perform post installation tests at site including : a) Pre-power up checking, power up, customization and configuration of equipment b) Local functional test for all Lifts & Escalators including load test c) Calibration of All meters and Sensors d) Testing and Commissioning (including integrated testing & commissioning) e) Obtaining certificate of satisfactory completion of functional and safety tests and working of the Lifts & Escalators f) Safety Certification for Lifts & Escalators g) Detailed Safety Report including the safety features and safety standards for Lifts & Escalators h) Service Trials i) Guarantee Tests & Demonstration of Performance of System/Equipment j) Any other item(s) considered necessary to comply with the scope of works such as, but not limited to, Insurance, CAMC Contract and Maintenance during warranty period inclusive of free of cost supply of all spares.
Penalty clause: (a) Penalty for delay in rectification of defects causing failure/breakdown: The contractor shall maintain the Lifts/Escalators along with all associated equipment/apparatus/machines in perfect working condition on any day during the tenure of the entire CAMC period (except the period of programmed shutdowns). In case, any Lift/Escalator is out of order or non-functional, the same shall be attended within 24 hours from the time of reporting failure by Railway to the Contractor. Penalty, as applicable, shall be imposed as furnished in following - 1. For Lift / Escalator, If the downtime (the period during which the lift or escalator is not working) is up to 24 hours from the time the failure is reported by the Railway to the contractor, no penalty or deduction will be imposed. 2. For lifts and escalators. exceeding 24 hours period, for each 24 hours or part thereof in excess of 24 hours as issued vide CEGE office letter no.EL/W/29/0/1457 dated 14.08.24 (letter attached penalty clause), deductions will be made at the rate equivalent to 0.1% (zero point one percent) of the yearly CAMC rate of lift/escalator per unit.
Web Based Smart Monitoring facility/IR- NIYANTRAC: The Elevators/Lifts/Escalators must be suitable/compatible for connecting to web-based application software IR- NIYANTRAC (Indian Railways Native IoT based Yield Analysis Telemetry, Recording and Control) provided by CRIS (Centre for Railway Information Systems) Or any other web-based Software application engaged by Railways for monitoring various parameters of Elevators/Lifts/Escalators through SCADA. For this purpose, the successful Tenderer shall have to install all necessary hardware including IoT devices, which are to be integratable with IR-NIYANTRAC application or any other web-based Software application engaged by Railways. Necessary executable files, if any, will be required to be given free of cost by the Contractor/Firm to Railways on a CD/pen-drive or any other storage device.
QUALITY ASSURANCE : The Bidder shall prepare and furnish their QA plan documentation, as per their ISO: 9000 program being followed. It shall include and clearly mention the procedures ensuring that all equipment/ materials/ systems & sub-systems are properly specified, designed, purchased, recorded, inspected, installed and tested at appropriate stages.
Bank Guarantee (if applicable) should be in favor of - PFA /N.F Railway/Maligaon and confirm that the BG is on the SFMS (Structural Financial Messaging System) and shall invariably send the advice of BG to IFSC CODE: SBIN000RAIL. Firm should submit No Claim/No Demand certificate for releasing SD.
3 locations across Assam, Nagaland · 14 Numbers total
Supply, Design, manufacture, Erection, testing & commissioning of passenger Escalators on Railway platforms as per Specification Attached along with CAMC for 10 ten (10) years after expiry of the warranty period of two years.
60265063~NFR
60265063
Open - Indigenous
Mixed (Goods/Service/AMC)
Assam; Dimapur, Nagaland; Hojai
₹0
₹20 L
11 Nov 2026
11 Nov 2026
14 items · 14 Numbers total
At CPK-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at C PK station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators vertic al height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to desti nation, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical heig ht upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety dev ice etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RDSO/ 2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warranty of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, plasteri ng, core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/P/CPK, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
At CPK: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 02 Nos Escalators at JID Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materials to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all t he spare parts, material and labour cost as and when required during maintenance or breakdown along wit h the work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so tha t Escalators do not remain without maintenance cover after expiry of warranty period. All-inclusive Mainten ance Contract (AMC) charges for 02 Nos. Escalators after warranty for 10 years. [ Warranty Period: 2 yea rs, AMC Period: 10 years, Rate of Discounting: 10 % ] ]
At Diphu-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at DPU station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators ver tical height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to des tination, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical hei ght of upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety device etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RD SO/2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warrant y of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, pla stering, core cutting, tile restoration, etc.). Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/P/DMV, NFR | Nagaland | 2.00 Numbers |
| Total | 2 Numbers | |
At Diphu: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 02 Nos Escalator s at DPU Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materi als to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all the spare parts, material and labour cost as and when required during maintenance or breakdown along with the work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so that Escalators do not remain without maintenance cover after expiry of warranty period. All-inclusive Maint enance Contract (AMC) charges for 02 No. Escalators after warranty for 10 years. [ Warranty Period: 2 ye ars, AMC Period: 10 years, Rate of Discounting: 10 % ] ]
At HJI-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at HJI station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators vertical height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to destinat ion, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical height upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety devic e etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RDSO/20 17/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warranty of pa ssenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, plastering , core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/ELECT/P/LMG, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
At HJI: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 2 Nos Escalators at HJI Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materials to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all the spare parts, material and labour cost as and when required during maintenance or breakdown along with th e work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so that Es calators do not remain without maintenance cover after expiry of warranty period. All-inclusive Maintenanc e Contract (AMC) charges for 2 No. Escalators after warranty for 10 years. [ Warranty Period: 2 years, A MC Period: 10 years, Rate of Discounting: 10 % ] ]
At JID-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at JI D station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators vertic al height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to desti nation, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical heig ht upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety dev ice etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RDSO/ 2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warranty of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, plasteri ng, core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/P/CPK, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
At JID: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 02 Nos Escalators at JID Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materials to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all the spare parts, material and labour cost as and when required during maintenance or breakdown along with th e work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so that Es calators do not remain without maintenance cover after expiry of warranty period. All-inclusive Maintenanc e Contract (AMC) charges for 02 Nos. Escalators after warranty for 10 years. [ Warranty Period: 2 years, AMC Period: 10 years, Rate of Discounting: 10 % ] ]
At Lanka- 1) Supply, Design and manufacture of passenger Escalators on Railway platforms a t Lanka station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators vertical height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to destination, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical height upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety device etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RD SO/2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warrant y of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, pla stering, core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/ELECT/P/LMG, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
At LKA:(AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 2 Nos Escalators at LKA Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materials to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all the spare parts, material and labour cost as and when required during maintenance or breakdown along with th e work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so that Es calators do not remain without maintenance cover after expiry of warranty period. All-inclusive Maintenanc e Contract (AMC) charges for 2 No. Escalators after warranty for 10 years. [ Warranty Period: 2 years, A MC Period: 10 years, Rate of Discounting: 10 % ] ]
At LMG-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at LMG station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators ver tical height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to des tination, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical hei ght upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety d evice etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RDS O/2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warranty of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, plast ering, core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/ELECT/P/LMG, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
At LMG: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 02 Nos Escalators at LMG Railway Station for ten years after expiry of warranty. Cost includes the cost of all required material s to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all the spare parts, material and labour cost as and when required during maintenance or breakdown along wit h the work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so tha t Escalators do not remain without maintenance cover after expiry of warranty period. All-inclusive Mainten ance Contract (AMC) charges for 02 No. Escalators after warranty for 10 years. [ Warranty Period: 2 year s, AMC Period: 10 years, Rate of Discounting: 10 % ] ]
At SZR-1) Supply, Design and manufacture of passenger Escalators on Railway platforms at S ZR station as per RDSO's specification No.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest (Escalators verti cal height upto 10 mtr (approx) or as per site requirement). Including packing & forwarding, Freight to desti nation, and insurance charges. 2) Erection, testing & commissioning of passenger Escalator for vertical heig ht upto 10 mtr (approx) or as per site requirement. complete with all associated accessories and safety dev ice etc. as per RDSO's Specification no.- RDSO/PE/SPEC/TL/0095 (REV 4) -2026 or latest and STR No.RDSO/ 2017/EM/STR/0002 (Rev'1')-2019 or latest. Cost includes free maintenance of Two years during warranty of passenger Escalators as per RDSO Specification. Erection work includes minor civil works (chipping, plasteri ng, core cutting, tile restoration, etc.) . Make - Johnson Lifts /Bhavani Elevators/L T Elevator or Similar ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/P/DMV, NFR | Nagaland | 2.00 Numbers |
| Total | 2 Numbers | |
At SZR: (AMC)-Comprehensive All-inclusive Maintenance Contract (CAMC) 02 Nos Escalators at SZR Railway Station for ten years after expiry of warranty. Cost includes the cost of all required materials to complete the work in all respect. Note:-The comprehensive AMC rate includes supply and erection of all t he spare parts, material and labour cost as and when required during maintenance or breakdown along wit h the work schedule. No extra cost will be paid for above. The AMC contract should be signed in time so tha t Escalators do not remain without maintenance cover after expiry of warranty period. All-inclusive Mainten ance Contract (AMC) charges for 02 No. Escalators after warranty for 10 years. [ Warranty Period: 2 year s, AMC Period: 10 years, Rate of Discounting: 10 % ] ]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5713637.pdf
ATTACHMENT
5904422.pdf
ATTACHMENT
5904413.pdf
ATTACHMENT
5713648.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .