Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance | ₹7.5 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹7.6 L+₹13,591.28 (1.82%)Accepted-Finance | ₹7.6 L+₹13,591.28 (1.82%) | L2 | Accepted-Finance Secondlowest |
| 3 | L3₹8.0 L+₹49,591.68 (6.65%)Accepted-Finance | ₹8.0 L+₹49,591.68 (6.65%) | L3 | Accepted-Finance Thirdlowest |
| 4 | L4₹8.5 L+₹1.1 L (14.4%)Accepted-Finance PULPRAIL HOUSE NELLAD PO | TIRUVANNAMALAI | TAMIL NADU | 604407 | ₹8.5 L+₹1.1 L (14.4%) | L4 | Accepted-Finance Fourthlowest |
| 5 | L5₹8.7 L+₹1.2 L (16.6%)Accepted-Finance KIZHAKKAKKARA HOUSE PALAKUZHA P O MUVATTUPUZHA KERALA | ERNAKULAM | KERALA | 680667 | ₹8.7 L+₹1.2 L (16.6%) | L5 | Accepted-Finance fifthlowest |
| Sl No | Description | Qty | Unit | UNNIKRISHNAN K S L5 | Saji O M L2 | V. JOY L1 | PAUL C ISSAC L3 | Nikhil T P L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Filling up of Kadakkanad branch canal tail end | ||||||||
| 1.00 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1,074.38 | cum | 780 ₹8,38,012.5 | 680 ₹7,30,575 | 668.85 ₹7,18,595.72 Lowest | 713.34 ₹7,66,394.66 | 765 ₹8,21,896.88 |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 88.8 | kg | 208 ₹18,470.4 | 190 ₹16,872 | 178.15 ₹15,819.72 Lowest | 190 ₹16,872 | 204 ₹18,115.2 |
| 1.00 | OD19130/2026-2027:Providing and fixing welded wire mesh of 10G of size (25.4mmX25.4mm) to frame and applying a priming coat of approved steel primer all complete | 14 | per sqm | 661 ₹9,254 | 590 ₹8,260 | 566.85 ₹7,935.9 Lowest | 604.56 ₹8,463.84 | 649 ₹9,086 |
| 1.00 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | 14 | sqm | 266 ₹3,724 | 245 ₹3,430 | 228.17 ₹3,194.38 Lowest | 243.35 ₹3,406.9 | 260 ₹3,640 |
Tender Value
₹8.1 L
EMD Value
₹20,326
Closing Date
10 Aug 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Minor Irrigation subdivision muvattupuzha
GENERAL-WPC 40877 of 2022-Filling up of unutilized Kuriathod Mini-kadakkanad branch canal tail end -General Civil Work
2026_Irrig_863807_1
IRR/IA/TR/5659/2025_5_1_1/RC 1/RC 2/1
Open Tender
Civil Works - Others
Item Rate
60 days
KADAKKANAD
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,795
Yes
₹20,326
Yes
13 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Filling up of Kadakkanad branch canal tail end | |||||
| 1.001 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.002 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1 | kg | - | - |
| 1.003 | OD19130/2026-2027:Providing and fixing welded wire mesh of 10G of size (25.4mmX25.4mm) to frame and applying a priming coat of approved steel primer all complete | - | per sqm | - | - |
| 1.004 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1461345.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
AFFIDAVITFILLINGUP.pdf
Tender Documents • 0.49 MB
PREAGGFILLINGUP.pdf
Tender Documents • 0.83 MB
SBD.pdf
Tender Documents • 2.43 MB
IntegritypactCERTIFICATE.pdf
Tender Documents • 0.01 MB
FOTFILLINGUP.pdf
Tender Documents • 0.54 MB
EPAYMENTFORM.pdf
Tender Documents • 0.01 MB
BOQ_1461345.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .