| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAccepted-AOC V S BHAVAN AYIRA P O | KERALA | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹39.5 L+₹1.2 L (3.16%)Rejected-Finance VADOORKONAM | IDUKKI | KERALA | 685533 | L2 | Rejected-Finance Second Lowest |
Tender Value
₹36.4 L
EMD Value
₹50,000
Closing Date
5 Feb 2025, 2:30 pmClosed
Executive Engineer
O/o The Executive Engineer Minor Irrigation Division Jalavijnana bhavan Ambalamukku Thiruvananthapuram Pin 695003
Renovation of Aduppukoottan parakulam
2025_Irrig_730960_1
05/EE-MI/2024-25
Open Tender
Civil Works - Water Works
Item Rate
180 days
Peroorkada
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
₹50,000
26 Mar 2025
27 Jan 2025
7 Feb 2025
27 Jan 2025
5 Feb 2025
27 Jan 2025
Amount
Renovation of Adukkukoottan parakulam
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD27356/2022-2023: Engaging man coolies for removing the solid wastes including slaughter house waste, plastics etc and removal of excessively grown thick vegetation including water hycinth etc complete as directed by the departmental officers at site.
OD27360/2022-2023:Daily hire of boat with boat man /Third class country boat with boat man for rowing boat from pond and also for conveying the departmental staff and labour engaged from banks to platform and back with essential safety equipments like life jacket.....etc
OD27366/2022-2023:Removing solid waste, hyacinth and other floating waste from pond by at an average depth of 1.50m (actual depth of pond is assumed to be about 12 to 15m) manually or mechanically using suitable amphibian excavator of sufficient boom length and capable to float in water, boat, pontoon etc. and removal of the floating waste including conveyance and safe disposal of removed waste to contractor own dumping yard using sufficient carriage vehicle as directed by the Engineer in charge.
60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD27368/2022-2023:Fabrication, supply and fixing of 50mm dia GI pipe for fencing ,embemded inconcrete in in line and level, including cost and carriage of all materials, labour charges etc, complete as directed by engineer in charge.
16.19:Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
16.70.2:Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts , bolts and washers as required complete as per the direction of Engineer-in- charge.Made of G.I wire of dia 4 mm. PVC coated to achieve outer dia. not less than 5 mm in required colour and shade
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
15.40.1:Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness upto 40 mm
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
JUSTIN JOSE (BID ID -2087124)
Bidder Name
VINCENT V
JUSTIN JOSE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1166334.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .