16 Apr 2026, 6:00 pmClosed
Executive Engineer, P.H. Works Division, Vadodara, Dist : Vadodara
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as intake well structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant, chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves, pumping machinery & electrical equipment etc. for the Vadodara North Zone Regional water supply scheme, including supply of potable water to all the 39 villages / 34 hamlets for 5 years period. Taluka: Vadodara District: Vadodara based on Intake well in Mahi River. Including supply of PAC, bleaching powder, Alum and chlorine gas.etc.for Five Year (60 Months) O&M (C+M)
287333
14 of 2025-2026
Open
Civil Works - Water Works
Works
Vadodara
2 documents required · 2 mandatory
₹18,000
Executive Engineer, P.H. Works Division, Vadodara
₹15.2 L
17 Mar 2026
17 Mar 2026
17 Mar 2026
16 Apr 2026
17 Mar 2026
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such
as intake well structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant,
chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves,
pumping machinery & electrical equipment etc. for the Vadodara North Zone Regional water supply
scheme, including supply of potable water to all the 39 villages / 34 hamlets for 5 years period.
Taluka: Vadodara District: Vadodara based on Intake well in Mahi River. Including supply of PAC,
bleaching powder, Alum and chlorine gas.etc.for Five Year (60 Months) O&M (C+M)
Estimated Cost: Rs.
Gujarat Water Supply & Sewerage Board
THIS PAGE IS LEFT INTENTIONALLY BLANK
SR. NO. PARTICULARS
THIS PAGE IS LEFT INTENTIONALLY BLANK.
Schedule showing approximate quantity of materials to be supplied to the contractor at the govt. store
for the work to be executed on contract and the rate which they are to be charged.
Sr. No. Particular Quantity Issue Rate Unit Place of Delivery
1. Materials not included in “Schedule – A” but required for the work shall be provided by the
contractor at his own cost.
2. Any materials required for items other than labour charges items mentioned in “Schedule – B” and
materials not included in “Schedule – A” but available with dept. will be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the
materials issued by the dept. from store to site at his own cost. Contractor will be responsible for
damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the department
in good and acceptable condition by the contractors. Any such unused materials not returned by
the contractor in time or issued will be recovered at Double of (As per issue rate + 3% storage
charge or Board RC + 3% storage charges) whichever is more.
5. All materials such as all types of pipeline & Specials, Fittings, Spares, chlorine gas, 900 &100 kg
tonner, alum, PAC solution, bleaching powder etc. shall be brought by Agency / Contractor at site
6. The material which requires to be procured by contractor and same as available with the
department the same can be issued to the contractor after prior approval from the competent
authority and charged for the same will be at the current market rate or issue rate fixed by the
department whichever is higher. The contractor shall have to deposit total cost of materials
issued or shall be recovered from the running account bill.
7. The materials issued for the above work shall be used in the above O&M work only. If any of
materials issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availability of materials, if needed contractor
have to transport the same from the other store to ………Scheme for which no extra carting,
loading, unloading will be paid.
9. The materials issued free of cost to the contractor is to be transported to the site of work in good
condition by the contractor for which no extra payment will be made.
10. The materials to be brought/purchase by the contractor shall be got approval from the EIC before
using in the work.
Signature of the contractor
Executive Engineer
P. H. Works Division
GWSSB, Vadodara
Name of Work: Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as
intake well structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant,
chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves,
pumping machinery & electrical equipment etc. for the Vadodara North Zone Regional water supply
scheme, including supply of potable water to all the 39 villages / 34 hamlets for 5 years period.
Taluka: Vadodara District: Vadodara based on Intake well in Mahi River. Including supply of PAC,
bleaching powder, Alum and chlorine gas.etc.for Five Year (60 Months) O&M (C+M)
Amount up to 2decimals
Part Description
Comprehensive Operation & Maintenance of Civil &
Electromechanical assets such as intake well structures,
elevated service reservoirs (E.S.R), HGLR, sump, water
treatment plant, chemical house, staff quarters, pump house, all
bulk transmission and distribution pipelines, valves, pumping
machinery & electrical equipment etc. for the Vadodara North
A Zone Regional water supply scheme, including supply of
potable water to all the 39 villages / 34 hamlets for 5 years
period. Taluka: Vadodara District: Vadodara based on Intake
well in Mahi River. Including supply of PAC, bleaching powder,
Alum and chlorine gas.etc.for Five Year (60 Months) O&M
Maintenance activities, measured and paid separately, such as
B painting, cleaning of reservoirs/ tanks, procurement and replacement
of filter media etc complete as per this tender document For Vadodara
North Zone RWSS
C Repair, upgradation of non-functional assets which are crucial for safe
and efficient functioning of RWSS For Vadodara North Zone RWSS
Comprehensive Operation and Maintenance and Emergency repairing
of the Pumping station premise, Plant Machineries and Electrical
Equipments Installed at Head Works by Engaging Necessary ,Skilled
experienced Electrician, semi skill experienced Operator and
unskilled Helper/sweeper /Chowkidar etc. as per Requirement with
Providing & Utilizing Necessary Lubricants, Tool Kit and all other
Running Consumables as well as Routine Plant and Emergency Break
down Maintenance and all Minor Preventive repairs to all Installed
Plant Machineries / Equipments and Preparation, Maintenance and
Preservation of Record for Pumping Machinery Utilization, Energy
Consumption, Qty. of Water Pumped etc. in Prescribed Performa as
per Instruction of Engineer In-Charge. for the Vadodara North Zone
Regional water supply scheme for 5 years period.
O&M (Mechanical)
Maintenance activities, measured and paid separately, such as
B painting, cleaning of reservoirs/ tanks, procurement and replacement
of filter media etc complete as per this tender document For Vadodara
North Zone RWSS
C Repair, upgradation of non-functional assets which are crucial for safe
and efficient functioning of RWSS For Vadodara North Zone RWSS
Total Amount (Civil + Mechanical)
Total Amount (Civil + Mechanical)
Total of Schedule B in Rupees fifteen Crore twenty Lacs twenty four Thousand two hundred ninety
one and eighty eight Paisa (words) Only
I / We am / are willing to carry out the work at_________ % above / Below percent (should be
written in figure and words) of the estimated rates mentioned above amount of my / our tender
works out as under.
Estimated amount Put to tender: Rs. Estimated amount Put to tender: Rs.
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
Rates to be quoted exclusive of GST.
Part A is payable on monthly basis whereas part B & C are subject to completion of activities
and approval of the measurement.
Water supply of target quantity of water to all habitations (village, towns and hamlets) on a
daily basis. If due to breakdown, agency is not capable of supplying water then such quantity
should be supplied the next day to cope up with the shortage. Such that the water supplied on
the next day will be 2 times the regular per day target.
Contractor should quote rate in words & figure both.
Insurance Policy should be procured in favour of Executive Engineer, PH Works Division,
Vadodara, and contractor has to produce it before entering into agreement with department,
for the full period of O&M.
The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
The work should be carried out as per the terms and conditions laid down in the tender
The cost of raw water, electricity will be borne by GWSSB.
Agency will supply necessary stock of Chlorine gas, PAC & bleaching powder. All other
required material for O&M work shall be brought by the contractor at his own cost including
loading, unloading and carting and the same material shall get approval from the Engineer-in-
charge before use in the work.
The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
The Contarctor has to check the depth of the filter media at an interval of six months
and if found loss of media then it is contractors liability to refill the media and maintain
the depth by its own cost (no extra payment will be given).
The Contractor has to change the filter media one time in 05 years as directed by
EIC.The payment will be given to the contractor as per Part-B of schedule
All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Painting of overall structures: Internal/external painting of civil structures, machineries,
manifolds, valves etc.
Interior Paint: Distemper paint to all civil assets
Exterior paint: shall be acrylic emulsion paint colour (like APEX): pump house, treatment
plants, treated water pumping stations, GSRs, ESRs, sump, stores, etc all.
Oil paint colour: All type of doors, windows, ventilation, shutter, pump, motor, all valves &
equipment inside pump house, transformer yard, D.P. structure, transformer etc
Black Japan colour: air valve, sluice valve, riser pipe of air valve, zero velocity valve, butterfly
valve (outdoor), bypass arrangement etc.
Painting /epoxy paint of existing sump and ESR shall be done two times in
year. But first time painting /epoxy work completed will be in first year and
second painting /epoxy work completed will be in third to five year.
Labour rate shall be applicable as per norms and should be revised every year
as per labour rate.
Breakup of Schedule B
Part A (Civil): Operation & Maintenance
1 Comprehensive Operation & Maintenance of Civil
& Electromechanical assets such as intake well
structures, elevated service reservoirs (E.S.R),
HGLR, sump, water treatment plant, chemical
house, staff quarters, pump house, all bulk
transmission and distribution pipelines, valves,
pumping machinery & electrical equipment etc.
for the Vadodara North Zone Regional water
supply scheme, including supply of potable water
to all the 39 villages / 34 hamlets for 5 years
period. Taluka: Vadodara District: Vadodara
based on Intake well in Mahi River. including
supply of PAC, bleaching powder, Alum and
chlorine gas.etc.
for Five Year (60 Months)
Total for Part A in. Rupees eight crore thirty three Lacs eighty two Thousand six Hundred seventy five
& fifty four Paisa Only
Part B(Civil)- Maintenance (separately payable on actuals, as measured)
Total Qty. Unit Item Per Amount in
Inside-Outside Painting to all
Functional civil structures, as
per schedule (Twice in the
contract period)
Finishing wall with weather
proof exterior emulsion paint
on wall surface (two coats) to
give an required shape even
shade after thoroughly
brushing the surface to
remove all dirt, and remains
of loose powdered aterials.etc
complete. (Outside)
a1 13000 2 26000 Sqmt HW/Sub HW 117.40 Sqmt
Storage tank exterior 0.20 LL
to 88 LL Capacity
Distempeing (TWO COATS)
With Oil Bound Distemper of
approved brand and
manufacture and of required
shade on wall surfaces to give
an even shade, over and
including a priming coat with
distemper primer of approved
brand and manufacture after
throughly brushing the
surface free from mortor
dropping and other foreign
matter and also including
preparing the surface even
and sand papered smooth.
a1 3970.180 2 7940.36 Sqmt HW/Sub HW 73.70 Sqmt
Food Grade epoxy coat: Inside
of storage reservoir/ tanks as
per schedule. (Twice in the
contract period)
Applying Anti Corrosive
Chemical Treatment Food
Grade epoxy for water
retaining structure including
cleaning the surface with
required treatment and
cleaning the Surface throughly
and making surface dry, even
& smooth for applying
treatment and coats. DCL
1400 With 3 Years Guarantee.
Storage tank exterior 0.20 LL
to 88 LL Capacity
Sub Total- Part B1 (i, ii, iii)
Cleaning of Storage reservoir:
UG sumps, ESR, HGLR/
GLCC and all village level
sumps every 6 months
43.00 Lacs litres Cap. @
88.00 Lacs litres Cap. @
17.00 Lacs litres Cap. @
Fajalpur Zone-A
10.00 Lacs litres Cap. @
a4 2 10 20 No. Fajalpur Zone-B &Dasharath - 9105 No.
10.00 Lac Lit. Cap. X 25 Mt.
Ht.(@Dhanora WTP, Fajalpur
Zone-A, Zone-B & Dasharath) -
Filter Media-Sand for Rapid
Sand Filter Bed: Providing &
Supplying the filter sand of
specified effective size (0.45
to 0.70mm) and uniformly
coefficient (not more than
1.7, nor less than 1.3) and
laying over gravel support
confirming to IS:8497 (i) -77 in
filter bed of required depth as
per design as per design and
drawing. Inclusive of all lead
Filter Gravel: Providing &
Supplying Gravels of different
a2 235.00 1 Cum size as per design and drawing 1277.00 Cum
and laying inlayers I filter beds
inclusive of all lead.
Sub Total- Part B3
Total- Part B (B1+B2+B3)
Total for Part B in. Rupees two Crore eleven Lacs sixty six Thousand thirty one & thirty three Paisa
Part C(Civil)- Upgradation or Repair of non-functional legacy assets
Sr. Component. Estimated Cost
PAC solution arrangements, Chlorination plants at Hw/
1 SHW and Demolition of Staff quarter & P.H. construction Rs.
of panel room & chlorine room.
CONSTRUCTION OF COMPOUND WALL @ SUB
Providing, supplying, lowering & laying of 350 mm dia DI
3 K-7 pipeline to connect ext. 350 mm dia DI to Dasharath Rs.
PROVIDING FIBRE DOME OVER SUMP AT FAJALPUR
ZONE-A SUMP H/W.
Total for Part C in. Rupees one crore twenty eight lacks twelve thousand seven hundred (words) Only
Part A (Mechanical): Operation & Maintenance
Qty Unit Item Description Rate Per Amount Rs/-
PART "A2" MECHANICAL WORK Mechenical
Comprehensive Operation and Maintenance
and Emergency repairing of the Pumping station
premise, Plant Machineries and Electrical
Equipments Installed at Head Works by
Engaging Necessary ,Skilled experienced
Electrician, semi skill experienced Operator and
unskilled Helper/sweeper /Chowkidar etc. as
per Requirement with Providing & Utilizing
Necessary Lubricants, Tool Kit and all other
Running Consumables as well as Routine Plant
12 Month and Emergency Break down Maintenance and 512422.58 Month
all Minor Preventive repairs to all Installed Plant
Machineries / Equipments and Preparation,
Maintenance and Preservation of Record for
Pumping Machinery Utilization, Energy
Consumption, Qty. of Water Pumped etc. in
Prescribed Performa as per Instruction of
Engineer In-Charge. for the Vadodara North
Zone Regional water supply scheme for 5 years
period. O&M (Mechanical))
12 Month For Year 2 543167.94 Month
12 Month For Year 3 575758.01 Month
12 Month For Year 4 610303.5 Month
12 Month For Year 5 646921.71 Month
Part C: Detailed BOQ
Brief note on operational issues and need for the repairs:______________________________
_______________________________________________________(include notes from inspection
by DEE and the need for such items)
Abstract of BOQ for Part C
<Attach/ add abstracttable>
Total Estimated Cost of Part C: _________________________________(in figures and words)
Total time limit for completion of Part C scope of work: 12 months from start date of contract.
Part C of the price bid shall include inherited non-functional legacy assets which need to be
repaired to make the system functional and efficient. The items shall be as per the baseline
assessment carried out by the concerned DEE.
This may include the following items:
Resolving technical issue due to which tail end villages are not receiving water
Resolving technical issue to ensure water supply to villages (other than tail end)
Rectification/ repair of non-functional assets
Replacement of electromechanical asset at end of life. Such as transformers, pumping
This part shall be a one-time activity. Once all assets are repaired, maintenance and upkeep of
the same will be the responsibility of O&M agency.
For Part C, approval shall be sought from concerned engineer as per the delegation of
Such cases will be scrutinized, and necessary actions will be recommended by a special task
team formed by the GWSSB.
The estimated cost of Part C shall not be more than 30% of the total estimated cost of the
tender (Part A + Part B).
No extra/ excess items will be allowed under Part C scope.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. EMD Circular Dt.12-09-2022.pdf
2. Affidavit-GwSSB 300 stamp.pdf
3. G.S.T. all Circular.pdf
4. Insurance-GR.pdf
5. SD for Clause-1 166.2025 (1).pdf
6. Labour cess GR.pdf
7. Time limit circular.pdf
8. Un balacne Rate.pdf
9 .I.P Address GR.pdf
10. Submission of Doc GR.pdf
11. GWSSB Circular.pdf
12. ERP Entry Letter.pdf
13. 2024-10-03.pdf
14. Price Variation Paripatra 2023.pdf
15. SD for Clause-1 166.2025.pdf
16. Part C DTP Dt. 05-01-2026.pdf
17. O and M Vol I Tec BId.pdf
18 Price Bid.pdf
19. GCC 1.pdf
20. Part -B Work Specification.pdf
21. Part-C Work Specification.pdf
NIT 1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .