Loading…
Loading…
| Sl No | Description | Qty | Unit | Babu N V L1 | SAJAR A L2 | KA AYOOB L3 |
|---|---|---|---|---|---|---|
| 1.00IRRIGATION CANAL | ||||||
| 1.00 | 2.5.2.A:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br>(II) By Mechanical Means <br> (A) Cement Concrete | 46.4 | cum | 687.22 ₹31,887.01 | 751 ₹34,846.4 | 503.22 ₹23,349.41 Lowest |
| 1.00 | 2.7.E:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br>(E) Dismantling Stone Pitching / Dry Stone Spalls | 72.28 | cum | 370.08 ₹26,749.38 Lowest | 404.47 ₹29,235.09 | 404.47 ₹29,235.09 |
| 1.00 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 0.03 | Hectare | 40,215.3 ₹1,126.03 Lowest | 43,951.73 ₹1,230.65 | 43,951.73 ₹1,230.65 |
| 1.00 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 197.34 | cum | 46.68 ₹9,211.83 Lowest | 51.01 ₹10,066.31 | 51.01 ₹10,066.31 |
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 61.88 | cum | 804.32 ₹49,771.32 Lowest | 879.04 ₹54,395 | 879.04 ₹54,395 |
| 1.01 | OD349804/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 73.32 | cum | 2,639.78 ₹1,93,548.67 Lowest | 2,885 ₹2,11,528.2 | 3,200 ₹2,34,624 |
| 1.01 | OD349826/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with DEPARTMENTAL MATERIALS including labour charges etc. complete as per direction of departmental officers at site. | 19.5 | cum | 709.98 ₹13,844.61 Lowest | 775 ₹15,112.5 | 3,200 ₹62,400 |
| 1.01 | OD349754/2025-2026:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6(Without Form Work- Modified 11.4.1.1) | 46.41 | cum | 7,391.59 ₹3,43,043.69 Lowest | 8,000 ₹3,71,280 | 8,600 ₹3,99,126 |
| 1.01 | 12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> I. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 95.2 | cum | 7,945.92 ₹7,56,451.58 Lowest | 8,600 ₹8,18,720 | 8,684.07 ₹8,26,723.46 |
Tender Value
₹20 L
EMD Value
₹42,371
Closing Date
23 Oct 2025, 5:00 pmClosed
ASSISTANT ENGINEER
LID and EW SUBDIVISION MANANTHAVADY BLOCK
Akkolly Jalasejana Canal in Thirunelly GP
2025_LSGD_806376_2
AEE/TND/25-26/04/185
Open Tender
Civil Works - Canal
Item Rate
365 days
APPAPARA
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹42,371
Yes
4 May 2026
16 Oct 2025
25 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
AFFIDIVIT.pdf
Tender Documents • 0.03 MB
Priliminoryagt1.pdf
Tender Documents • 0.03 MB
Formtender.pdf
Tender Documents • 0.18 MB
epaymentform.pdf
Tender Documents • 0.05 MB
ipact.pdf
Tender Documents • 0.04 MB
BOQ_1352760.xls
BOQ • 0.26 MB
viewsbd.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .