| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹51.8 LAccepted-AOC V P O UTTAR KRISHNAPUR PT I PS SILCHAR SADAR CACHAR ASSAM 788006 | CACHAR | ASSAM | 788006 | L-1 | Accepted-AOC Your PG of Rs. 259190 received and Accepted hence work awarded to your firm for Rs. 5183790/-. | |
| 2 | L-2₹63.2 L+₹11.4 L (22.0%)Rejected-AOC BYELANE 9 ZAKIR HUSSAIN ROAD SORUMOTORIA KAMRUP ASSAM 781036 | KAMRUP METRO | ASSAM | 781036 | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹70.3 L+₹18.5 L (35.7%)Rejected-AOC DILBAGH RAJ ANAND COMPLEX ATHGAON AT ROAD GUWAHATI KAMRUP M ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | L-3 | Rejected-AOC Reject | |
| 4 | L-4₹71.5 L+₹19.7 L (38.0%)Rejected-AOC CO ENG NEZGTY | L-4 | Rejected-AOC Reject | |
| 5 | Rejected-Technical H NO 146 RK PALLY ITHKHOLA GONIWALA SILCHAR CACHAR ASSAM 788002 | CACHAR | ASSAM | 788002 | - | Rejected-Technical The Firm has not submitted all Documents as per NIT, Hence rejected. |
| Sl No | Description | Qty | Unit | Samsul Alam Mazumder L1 | MAHABAHU ENTERPRISE L2 | Abhay Kumar Jain L4 | L N Distributors L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Preparation of Architecutral & structural Drawings of the structure and carrying out the Soil Investigation tests from NABL approved Lab duly taking into account the existing buildings. Contractor shall submit the drawings duly vetted by IIT/NIT within 30 days of award of Work Order. Drawings shall be got approved by the Estate Officer before start of the work. Note : Contractor has to ensure that there is no damage to the existing buildings and if any, same shall be got repaired by the contractor at his own cost. | 1 | Job | 50,000 ₹50,000 Lowest | 1,25,000 ₹1,25,000 | 1,10,000 ₹1,10,000 | 1,50,000 ₹1,50,000 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge : All kinds of soil. | 640 | Cum | 350 ₹2,24,000 | 200 ₹1,28,000 Lowest | 251 ₹1,60,640 | 230.1 ₹1,47,264 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 640 | Cum | 350 ₹2,24,000 | 220 ₹1,40,800 Lowest | 266 ₹1,70,240 | 256.65 ₹1,64,256 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size). | 24 | Cum | 7,000 ₹1,68,000 | 6,800 ₹1,63,200 Lowest | 8,923 ₹2,14,152 | 8,660.1 ₹2,07,842.4 |
| 5.00 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation leveling and dressing and finishing the top smooth. | 60 | Sq.m. | 700 ₹42,000 Lowest | 850 ₹51,000 | 1,087 ₹65,220 | 998.1 ₹59,886 |
| 6.00 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately) : All works upto plinth level. | 256 | Cum | 10,500 ₹26,88,000 | 10,000 ₹25,60,000 Lowest | 12,681 ₹32,46,336 | 12,750.16 ₹32,64,040.96 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 96 | Sq.m. | 300 ₹28,800 Lowest | 450 ₹43,200 | 510 ₹48,960 | 499.54 ₹47,955.84 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 640 | Sq.m. | 300 ₹1,92,000 Lowest | 950 ₹6,08,000 | 1,196 ₹7,65,440 | 1,140.19 ₹7,29,721.6 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Mild steel and Medium Tensile steel bars. | 14,322 | kg | 95 ₹13,60,590 Lowest | 160 ₹22,91,520 | 149 ₹21,33,978 | 143.5 ₹20,55,207 |
| 10.00 | Half brick masonry with common burnt clay F.P.S. (non modular) bricksof class designation 7.5 in foundations and plinth in : Cement mortar 1:3 (1 cement : 3 coarse sand) | 72 | Sq.m. | 1,500 ₹1,08,000 | 1,000 ₹72,000 Lowest | 1,275 ₹91,800 | 1,197.35 ₹86,209.2 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
6 Oct 2025, 6:30 pmClosed
Commandant (Engineer)
CONTRACT CELL, NE ZONE Hqr
17-NEZ-C/Cell-GCSLR/OB/2025-26
2025_CRPF_879636_1
7-NEZ-C/Cell-GCSLR/OB/2025-26
Open Tender
Civil Works
Item Rate
120 days
GC SLR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
20 Nov 2025
29 Sept 2025
8 Oct 2025
29 Sept 2025
6 Oct 2025
29 Sept 2025
29 Sept 2025 - 3 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .