Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
1 Sept 2026, 6:00 pm4d left
Dy.Minicipal Commissioner - West Zone
EMPANELMENT OF CONTRACTOR FOR THE WORK OF DRAINAGE PIPE LINE UNDER SWARNIM GRANT OF 70:20:10 SCHEME IN DIFF. WARDS OF WEST ZONE IN AHMEDABAD
339119
2/26-27 (T.N.67)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹6,000
Municipal Commissioner, Ahmedabad
₹1 L
27 Aug 2026
27 Aug 2026
27 Aug 2026
1 Sept 2026
27 Aug 2026
6. Definite particulars covered in the items of work, though not mentioned or
elucidate in its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of
replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the
Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant
shall be removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work
as well as for checking lines, levels, alignment of the works & all precautionary
measures during execution shall have to be kept in sufficient numbers and in good
working condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and
completion of work to the required strength and quality. Acceptance of the same
by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the
course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed
under the "Minor Mineral Act", and such other laws and rules prescribed by the
Government from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the
various relevant Indian Standard) shall be taken to engrave the safety of men,
materials and machinery on the work and also of the work itself.
16. Quantity may increase or decrease looking to the quantum of actual work for
which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item as per terms and conditions of AMC if
18. The work in general shall be carried out as per standard specifications of the
relevant items to be executed & as per the instruction of Engineer in charge & as
per the guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be
binding on the contractor. The contract agreement shall have to be executed
between AMC & the agency to which work is awarded for execution.
20. The time limit shall be reckoned after 10 days from the date of issue of the written
work order to the contractor or actual possession of site. No time extension will be
granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this Bid, the interpretation
given by City Engineer of A.M.C. will be final and binding to the Contractor.
22. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity
23. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
piped water for the construction of the works and provide a satisfactory supply of
potable water for drinking, washing, sanitation and cleaning down. The contractor
will be responsible for all the costs where applicable of connection, meter
installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system
around the site.
24. Electricity: Electric supply will be made available at the site by the Corporation
but the contractor must make his own arrangements with the Corporation and
Electricity Supply Authorities and with other contractors to connect and to take a
supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on
the site for purpose of the work and shall pay such charges as is fixed by the
appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff,
machineries and for use of diesel operating sets etc. as the case may be.
25. Contactor shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also
to submit the income tax clearance certificate and solvency certificate.
26. No advance such as machinery advance, mobilization advance or materials
advance will be given.
27. Conditional Bid will not be accepted.
28. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
29. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
30. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the Bid items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
(ii) If the works gets delayed/ postpones for some administrative/ technical
decision what so ever.
31. In case of any dispute, decision of Municipal Commissioner shall be final and
binding on the contractors.
32. All pages shall be signed by the bidder before submitting the bid.
33. Bid which do not fulfill all or any of conditions or are submitted incomplete in
any respect will be rejected. Municipal Commissioner reserves the rights to
increase/decrease the scope of work. No any claim to that effect shall be
entertained. The Municipal Commissioner also reserves the right to reject any or
all the Bids without assigning any reason thereof.
34. 1% of the billed amount for work done this work shall be deducted from each
running account bills of the contracts in accordance with the provisions of the
building and other construction workers welfare Cess Act 1996. (Govt. of Gujarat
G.R.No. CWA-2004-841-M-3 Dated 30-01-2006)
35. As per AMC’s Finance department circular no.38/ Dt.21/11/022 and approval of
competent authority, rate of all the items are taken without GST and prevailing
GST will be payable.
Signature of contractor with seal Addi. City Engineer
Date ( West Zone)
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
bntldh muJtmœl - vrùb Ítul
vrùb Ítul Ítulj ytuVem,
ztp.hbKCtE vxuj CJl, WMbtlÃþht ath hM<t, WMbtlÃþht yb>tJt> - 380
SPECIAL CONDITION OF CONTRACT
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e
rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg
vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^
fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g
œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtle hnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf
fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch
yJ~g jFJtltu hnuNu.
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh
auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe
zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe
bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u
bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂbNlh, ybœtJtœ” lt ltbltu fZtJJtu.
Signature of contractor with seal Addi. City Engineer
Date ( west Zone)
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 The Municipal Commissioner, Ahmedabad Municipal Corporation (referred to as
Employer in these documents) invites sealed bids for the work (as defined in these
documents and referred to as “the work”) detailed in the table given in the Invitation
for Bid (hereinafter called as IFB.) from competent bidder.
2.0 Eligible Bidders
2.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined
in this tender.
2.2 An enterprise / company may only participate in the bidding process if they are legally and
financially autonomous, operate under commercial law and are not a dependent agency of
3.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are
subject to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delays in completion, litigation history, or
financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices
for the purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer
and other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes
his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of
Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• Tenderer will be disqualified if the hard copy (Original and Duplicate) of tender
documents are not submitted physically.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
4.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and
thereby total amount of work increases / decreases up to any extent.
thereby total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain
idle and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
5.0 Content of Bidding Documents
5.1 The set of bidding documents comprises the documents listed below and addendum
(if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Conditions of Contract
5. Technical Specifications
6. Bill of Quantities
6.0 Amendment of Bidding Documents
6.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addendum.
6.2 Any addendum thus issued shall be part of the bidding documents and shall be
placed on website www.nprocure.com or ahmedabadcity.gov.in/tender notice. The
prospective bidder shall refer to website to check any addendum before 24 hours of
opening of bids. AMC will not give any advertisement for the same.
6.3 To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his desecration, extend as
necessary the deadline for submission of bids.
6.4 Prospective bidders should attach the addendum made for the work & if fails to do
so than also the changes made through such addendum shall be applicable & bound
C PREPARATION OF BIDS
7.0 Language of the Bid
All documents relating to the bid shall be in the English or Gujarati language only.
8.0 Documents comprising bid
Whole tender shall be submitted before Date Mention in NIT. Each bidder must
upload the scanned copies of all the documents including below-mentioned
certificates along with the submission of online bidding:
• Scanned copy of Tender Fee
• Scanned Copy of EMD
• Scanned Copy of Required Registration Certificate
Failure to submit / upload online whole tender document and the above certificates/
documents shall make the bid non-responsive. Also incomplete tender documents
shall not be considered as a valid tender. Technical evaluation will be executed as
per online submitted document only if failure for uploading the document by bidders
then bids will be consider non responsive.
• The contract shall be for the whole works as described in Bill of Quantity
including the schedule-B based on the percentage rate in the Bill of
Quantities submitted by the bidder.
• All duties, taxes (exculding GST), and other levies payable by the contractor
under the contract, or for any other cause shall be included in the rates,
prices and total Bid Price submitted by the Bidder, except otherwise stated
in the Bid document. Any change in prevailing taxes and duties at the time
of bid due date, shall be paid / deducted at actual as per Employer/AMC
Account department decide. If Employer will not compensate as per Any
change in prevailing taxes and duties and other levies then payable by the
contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to
the completion of Work and shall not be subject to adjustment on any
account, except where expressly specified, otherwise, in the contract.
10.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be
made in Indian Rupees.
11.0 Bid Validity
11.1 90 days from the last date of submission of Tender. it should be valid for 90 days
from the last date of online tender submission. A bid valid for a shorter period shall
be rejected by the Employer as non-responsive.
11.2 In exceptional circumstances, prior to expiry of the bid validity (90 days), the
Employer may request that the bidders may extend the period of validity for a
specified additional period. The request and the bidders' responses shall be made in
writing or by cable. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his bid security for a
period of the extension, and in compliance with Clause in all respects.
12.0 Earnest Money / Bid Security
12.1 The Bidder shall furnish, a Bid Security of the amount as shown in IFB as part of his
bid, in the form of D.D. or Cheque or pay order or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad valid for 90 days from the date of Price bid
Openning of tender.
As per Account Department (A.M.C.) Circular No.10, Dt.01.06.2022 Bank Guarantee of
said work must be of Ahmedabad City Branch, which mentioned as bellow.
A. Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period
up to March- 31, 2025. The validity cut-off date in the GR is with respect to the
date of issue of Bank Guarantee irrespective of the date of termination of Bank
1 Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance bank
7. Federal Bank
10. IndusInd Bank
11. Kotak Mahindra Bank
13. Standard Chartered Bank
14. Tamilnadu Mercantile Bank
15. Ujjivan Small Finance Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. The Kalupur Commerical Co-operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-operative bank
8. The Mehsana Urban Co-Operative Bank Limited
9. The Surat Disitric Co-operative Bank
10. The Surat Peoples Co-Operative Bank
Any bid not accompanied by an acceptable Bid Security shall be rejected by the
Employer as non-responsive. Any bid having bid security for lesser value and shorter
validity period shall be treated as non-responsive.
(a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will
be returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest
tenders, will be returned when the successful bidder has furnished the required
security deposit and signed the agreement.
The Bid Security of the Successful Bidder will be discharged when the bidder has
signed the Agreement and furnished the required security deposit.
The Bid Security shall be forfeited, if the Bidder withdraws the Bid after Bid opening
during the period of Bid validity; in the case of a successful Bidder, if the Bidder fails
within the specified time limit to sign the Agreement; or Furnish the required
security deposit. commence the work after signing the agreement within 15 days No
interest shall be paid by the owner on any tender guarantee. The issuing branch of
the bank guarantee shall be of Ahmedabad City only.
Bank Guarantee for Earnest Money Deposit should be executed on non-judicial
Stamp papers of requisite value in accordance with the stamp Act applicable to that
particular state of Indian Union, where executed.
The executing officers of the bank Guarantee for Earnest Money Bid Security shall
clearly indicate in (block letters) his name, designation, Power of Attorney No. /
Signing Power No. etc.
Each page of the bank guarantee for Earnest Money Deposit shall be duly
signed/initialed by the executing officers and the last page shall be signed in full,
indicating the particulars as aforesaid under the seal of the Bank.
13.0 Alternative Proposal by Bidders
Bidders shall submit offers that comply with the requirements of the bidding
Documents. Alternatives will not be considered, unless specifically asked for by the
14.0 Format and Signing of Bid
• The Bidder shall prepare one original copy of the documents comprising the bid as
described in (Section:II instruction to bideer) of these Instructions to Bidders, bound
with the volume containing the ‘Technical Bid in separate parts and clearly marked
"ORIGINAL" and "DUPLICATE" as appropriate. In the event of discrepancy between
them, the original shall prevail.
• The original and duplicate of the Bid shall be typed or written in indelible ink and
shall be signed by a person or persons duly authorized to sign on behalf of the
Bidder. All pages of the Bid where entries or amendments have been made shall be
initialed by the person or persons signing the bid.
• Pages of tender documents shall be initialed by the bidder with company’s seal.
• The Bid shall contain no alterations or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the
bidder, in which case such corrections shall be initialed by the person or persons
signing the bid.
• Sufficiency of bid: The bidder shall be deemed to have satisfied himself as to the
correctness and sufficiency of the bid, all of which shall, cover all his obligations
under the contract and all matters and things necessary for the proper execution and
completion of Works and the remedying of the defects therein.
15.0 DEADLINE FOR SUBMISSION OF THE BID
15.1 Complete Bids (including Technical bid and necessary documents) must be received
by the Employer at the address specified in bid information not later than the date
indicated on the face sheet of the document. In the event of the specified date for
the submission of bids declared a holiday for the Employer, the Bids will be received
up to the appointed time on the next working day. The Bidder is further required to
submit Documents in Physical Form on or before the Bid Due Date and before the
time of submission as specified in NIT, at the following address:- Assistant
Manager(North West zone), Ahmedabad Municipal Corporation, North West Zone,
Zonal Office", Nr. Atithi Hotel, Bodakdev Ahmedabad.
15.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n)
procure e-tendering portal on account of delay in submission at bidder's end. Bidder
shall ensure that they submit the bid well before the "Due Date & Time of Bid-
Submission". AMC shall not be responsible if bidder is not able to submit the bid on
account of failure in network/internet connection or any other technical reason.
15.3 The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with (Section:II: Instruction to bidder) Clause 12.0, in
which case all rights and obligations of the Employer and the bidders previously
subject to the original deadline will then be subject to the new deadline.
15.4 All bidders are requested to see the website of (n) procure /
www.ahmedabadcity.gov.in for corrigendum.
15.5 Any Bid received by the Employer after the deadline prescribed in NIT will be
rejected and returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be
returned unopened to the bidder.
17.0 MODIFICATION & WITHDRAWAL OF BID
17.1 Bid shall not be modified by the bidder after the deadline for submission of bids.
17.2 Withdrawal of a bid during the interval between the deadline for submission of bids
and the expiration of the period of bid validity specified in NIT may result in the
forfeiture of the Bid Security pursuant to (Section:II: Instruction to bidders)
17.3 If during Tender validity period, the bidder withdraws his tender, the tender security
(Earnest Money Deposit) shall be forfeited.
18.0 BID OPENING
18.1 The Employer will open all the Bids received (except those received late), in the
presence of the Bidders or their representative who choose to attend. In the event
of the specified date of Bid opening being declared a holiday for the Employer, the
Bids will be opened at the appointed time and location on the next working day.
18.2 Bids for which acceptable notice of withdrawal has been submitted pursuant shall
not be opened and shall be returned.
18.3 The amount, form, and validity of the bid security furnished with each bid will be
announced. If the bid security furnished does not confirm to the amount and validity
period as specified in the NIT, and has not been furnished as specified, the remaining
technical bid will be returned to the bidder terming it as non-responsive.
18.4 Representatives of the bidders (maximum of two) who choose to attend may attend
the online opening of the bids on the Place, date & time as mentioned above.
The bidders or their representatives who are present shall sign attendance sheet
evidencing their attendance.
18.5 (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with respect
to the qualification Information and other information furnished in Part I of the
(ii) After receipt of confirmation of the bid security, the bidder will be asked in
writing to clarify his bid, if necessary, with respect to any rectifiable defects.
(iii) The bidders will respond in not more than 4 working days of issue of the
clarification letter.
(iv) On receipt of these clarifications AMC finalise the list of responsive bidders
whose financial bids are eligible for consideration.
19.0 EMPLOYER’S RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS
19.1 Notwithstanding anything contained in this Bid, the Authority reserves the right to
accept or reject any Application and to annul the Bidding Process and reject all
Applications/ Bids, at any time without any liability or any obligation for such
acceptance, rejection or annulment, and without assigning any reasons therefore. In
the event that the Authority rejects or annuls all the Bids, it may, in its discretion,
invite all eligible Bidders to submit fresh Bids hereunder.
19.2 The Authority reserves the right to reject any Application and/ or Bid if:
(a) at any time, a material misrepresentation is made or uncovered, or
(b) the Applicant does not provide, within the time specified by the Authority,
the supplemental information sought by the Authority for evaluation of the
If such disqualification/ rejection occur after the Bids have been opened and
the Highest Bidder gets disqualified/ rejected, then the Authority reserves
(i) invite the remaining Bidders to match the Highest Bidder/ submit their Bids in
accordance with the TENDER; or
(ii) take any such measure as may be deemed fit in the sole discretion of the
Authority, including annulment of the Bidding Process.
19.3 In case it is found during the evaluation or at any time before signing of the
agreement or after its execution and during the period of work, that one or more of
the pre-qualification conditions have not been met by the Applicant, or the Applicant
has made material misrepresentation or has given any materially incorrect or false
information, the Applicant shall be disqualified forthwith if not yet appointed as the
Concessionaire either by issue of the LOA or entering into of the Concession
Agreement, and if the Applicant/SPV has already been issued the LOA or has entered
into the Concession Agreement, as the case may be, the same shall, notwithstanding
anything to the contrary contained therein or in this TENDER, be liable to be
terminated, by a communication in writing by the Authority to the Applicant,
without the Authority being liable in any manner whatsoever to the Applicant and
without prejudice to any other right or remedy which the Authority may have under
this TENDER, the Bidding Documents, the Concession Agreement or under applicable
19.4 The Authority reserves the right to verify all statements, information and documents
submitted by the Applicant in response to the TENDER. Any such verification or lack
of such verification by the Authority shall not relieve the Applicant of its obligations
or liabilities hereunder nor will it affect any rights of the Authority hereunder.
20.0 SIGNING OF CONTRACT AGREEMENT
20.1 The Employer and the successful bidder shall enter into a Contract Agreement as per
AMC’s policy within 28 days after the successful bidder (hereinafter called the
Contractor) receives the Letter of Acceptance, unless they agree otherwise, subject
to furnishing the performance security as laid down in ITB Clause before signing the
Agreement with the Employer.
20.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful and release
their Earnest Money Deposit/Bid Security.
21.0 SECURITY DEPOSIT
21.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall
deliver to the Employer a security deposit in the form of Bank Guarantee / Demand
Draft / cheque for an amount equivalent to 5% of the Contract Price valid for the
period of valid till 90 days beyond Date of completion of work. The Security Deposit
shall be payable in 15 days from date of receipt of LOA failing which interest @4%
per annum will be charged by AMC.
21.2 The security deposit shall be in the form of a Bank Guarantee in the name of the
Employer, from Ahmedabad branch of any Banks mentioned in the revalent clause of
this tender documents.
21.3 This security deposit shall be released only after the clearance of final bill including
pre & post Audit.
21.4 Interest @ 4 % per annum shall be deducted from contractor in case of late
submission of Bank guarantee or late renewal of bank guarantee for the number of
days delayed for submission or discontinuity of the bank guarantee.
21.5 Bank Guarantee to be submitted in the prescribed format enclosed and shall be
same verbatim as per the format. Bank Guarantee shall be submitted on right value
of stamp paper and for correct value of contract.
21.6 Failure of the Successful Bidder to comply with the requirements of revalent Sub-
Clause shall constitute sufficient grounds for cancellation of the award and forfeiture
of the Bid Security.
21.7 In case of any contract amendment during execution of the contract enhancing value
of the contract the BG value shall be enhanced accordingly. Validity of BG shall be
commercial terms and conditions of the tender.
21.8 All compensation or other sums of money payable by the Contractor to the Employer
under the terms of this Contract or any other contract or on any other account
whatsoever may be deducted from Security Deposit. Also in the event of the
Contractor's Security Deposit being reduced by reasons of such deductions, as
aforesaid, the Contractor shall, within 15 days of receipt of notice of demand from
the Engineer-in-Charge, make good the deficit in Security Deposit.
21.9 Should there arise any occasion under the Contract due to which the periods of
validities of Bank Guarantees as may have been furnished by the Contractor from
time to time, are required to be extended/renewed, the Contractor shall get the
validity periods of such guarantees extended/renewed, and furnish these to the
Engineer-in- Charge one month before the expiry date of the aforesaid Guarantees
originally furnished failing which the existing Bank Guarantees shall be invoked by
the Engineer – in – charge. Also in case of any deficit in securities on any account as
might occur or is noticed, the Contractor shall forthwith recoup/replace the same
with acceptable Security Deposit.
21.10 The Bank Guarantee shall be extended within the expiry dates wherever activities as
per contract are not completed in all respects.
21.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement
at Employer’s office within 15 days of LOA.
22.0 Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if it determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in
competing for the contract in question and will declare the firm ineligible, either
indefinitely or for a stated period of time.
The bidder and their respective officers, employees, agents and advisers shall
observe the highest standard of ethics during the bidding process. Not with standing
anything to the contrary contained herein, the Employer may reject any bid without
being liable in any manner whatsoever to the bidder if it determines that the bidder
has, directly or indirectly or through an agent, engaged in corrupt practice,
fraudulent practice, coercive practice, undesirable practice or restrictive practice in
the bidding process.
Without prejudice to the rights of the Employer under relevant Clause hereinabove,
if an bidder is found by the Employer to have directly or indirectly or through an
agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive
practice, undesirable practice or restrictive practice during the bidding process, such
bidder shall not be eligible to participate in any tender issued by the Employer during
a period of 2 (two) years from the date such bidder is found by the Employer to have
directly or indirectly or through an agent, engaged or indulged in any corrupt
practice, fraudulent practice, coercive practice, undesirable practice or restrictive
practice, as the case may be.
For the purposes of this Clause, the following terms shall have the meaning
hereinafter respectively assigned to them:
(a) “corrupt practice” means the offering, giving, receiving, or soliciting, directly
or indirectly, of anything of value to influence the actions of any person
connected with the bidding process (for avoidance of doubt, offering of
employment to, or employing, or engaging in any manner whatsoever, directly or
indirectly, any official of the Employer who is or has been associated in any
manner, directly or indirectly, with the bidding process or has dealt with matters
concerning the Contract or arising there from, before or after the execution
thereof, at any time prior to the expiry of one year from the date such official
resigns or retires from or otherwise ceases to be in the service of the Employer,
shall be deemed to constitute influencing the actions of a person connected with
the bidding process); engaging in any manner whatsoever, whether during the
bidding process or after the award or after the execution of the Contract, as the
case may be, any person in respect of any matter relating to the Works, who at
any time has been or is a legal, financial or technical adviser of the Employer in
relation to any matter concerning the Works;
(b) “Fraudulent practice” means a misrepresentation or omission of facts or
suppression of facts or disclosure of incomplete facts, in order to influence the
bidding process;
(c) “Coercive practice” means impairing or harming or threatening to impair or
harm, directly or indirectly, any person or property to influence any person’s
participation or action in the bidding process;
(d) “undesirable practice” means establishing contact with any person connected
with or employed or engaged by the Employer with the objective of canvassing,
lobbying or in any manner influencing or attempting to influence the bidding
(f) “Restrictive practice” means forming a cartel or arriving at any understanding
or arrangement among bidder with the objective of restricting or manipulating a
full and fair competition in the bidding process.
(g) “ False documents” during If any documents found false/fake then Municipal
Commissioner/AMC has right to take any action/penalty/punishment against
23.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration
resulting from Contractors completed or under execution by him over last five years.
If the details of Litigation History are hidden by the Bidder and later on it comes to
the knowledge of the Employer, the Bidder shall be disqualified for the proposed
work and other appropriate actions shall be taken against the bidder.
24.0 In the event of any discrepancy the following order or precedence should apply
In the event of any discrepancy in the several documents forming the contract or in
any one document,the following order of precedence should apply.
(a) Dimension and quantities:- (i)Schedule-B of the Tender form (ii) specification (iii)
On drawing,figure dimensions,unless obviously incorrect,will be followed in
preference to scaled dimensions.
(b) Desription: (I) Schedule-B of the Tender form,(II) specification,(III) Drawings.
In the case of effective description or ambiguity,the Engineer-in-charge is entitled to
issue further instructions directing in what manner the work is to be carried out.The
contractor cannot take any advantage of any apparent error or omission in drawings
or specifications and the Engineer-in-charge shall be entietled to make corrections
and interpretations as necessary to fulfil plans and specifications.
The Engineer-in-charge shall have power to make any alterations in or addition to the
original specifications, drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be bound to
carry out the work in accordance with any instructions in this connection which may be
given to him in writing signed by the Engineer-in-charge and such alternation shall not
invalidate the contract and additional work which the contractor may be directed to do in
the manner above specified as part of the work shall be carried out by the contractor on the
same conditions in all respects on which he agreed to do the main work and at the same
rate as out by the contractor on the same conditions in all respects on which he agreed to
do the main work and at the same rate as are specified in the tender for the main work.
Seal and Signature of the Bidder Add.CityEngineer( WZ)
Date: Ahmedabad Municipal Corporation
bu.Bgwrl.frbNlh©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb
«fthle fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh, mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb
bswhtulwk dwsht< rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt< Au.
Instruction to Bidders
The scope of work includes the RCC Road,
IT.2 INVITIATION TO BID
The Municipal commissioner for and on behalf of Ahmedabad Municipal Corporation
here in after referred as AMC will receive Bids for the work as per the specifications and
schedule of prices in the Bid document. The Bids shall be opened in the office of the City
Engineer in the presence of Bidders or their representatives who remain present. The Municipal
Commissioner reserves the right to reject the lowest or any other or all Bids or part of it which in
the opinion of the AMC does not appear to be in its best interest and the Bidder shall have no
cause of action or claim against the authority or its officers, employees, successors or assignees
for rejection of his Bid.
IT.3 LANGUAGE OF BID
Bids shall be submitted in English and all information in the Bid shall also be in
English, Information in any other language shall be accompanied by its translation in English.
Failure to comply with this may make the Bid liable to rejection.
IT. 4 QULIFICATION OF BIDDERS
Work shall be allotted to empanelled contractors registered in concern class with respect
to the amount of work.
The Bidders shall furnish following information and documents along with the Bids.
i. The Bidders experience in the fields relevant to this contract.
ii. The Bidders financial capacity/resources and standing over at least 5 (five) years
iii The Bidder's present commitments (jobs on hand) as per statement
iv The Bidder's capability and qualification of himself and his regular staff etc.
as per statement
v Plants and Machinery available with the Bidder
IT .5 BID DOCUMENTS
Bid documents and set of drawings shall comprehensively be referred before Biding.
The several section form in the document are the essential parts of the contract and a
requirement occurring in one shall be as binding as though occurring in all, they are to be
taken as naturally, explanatory and describe and provide for complete works.
The Bid documents shall be submitted in two sets.
IT. 6 EXAMINATIONS BY BIDDERS
At this own expense and prior to submitting his Bid, each Bidder shall (a) examine
the contract documents (b) Visit the site and determine local condition which may affect the
work including the prevailing wages and other pertinent cost factors. (c) Familiarize himself
with all central, state and local license required for the work and (d) correlate his observation,
investigation and determinations with the requirements of the Bid documents, site & subsoil
Copy of the Bid Document should be completed, legible in ink or ball pen, checked
in a responsible manner, signed, stamped and returned together with the Bid security bond by
the stipulate date. This shall form the part of Bid documents which
the Bidder is required to complete.
The form of Bid, including the Appendices enclosed thereto, Bid security bond and
the Bid summary shall be submitted duly signed and stamped.
All the pages in which entries are required to be made by the Bidder are contained in
the Bid documents and the Bidder shall not take out or add to or amend the text of any of. the
IT.7 EARNEST MONEY DEPOSIT./ SECURITY DEPOSITE
Each Bid must be accompanied by, a receipt of deposit as Bid guarantee in the form
of Earnest money mentioned on relevant page. Any Bid not accompanied by a Bid guarantee
in the form of earnest money deposited for the sum stipulated in the Bid's document will be
summarily rejected. The earnest money deposit shall be paid with the Bid by D.D. payable at
Ahmedabad without which the Bid shall not be considered as valid. EMD in the form of
The Earnest Money Deposit will be returned to the unsuccessful Bidders after an
award has been finalised.
The Earnest Money Deposit (Bid Guarantee) will be forfeited in the event, the
successful Bidder fails to accept the contract and fails to submit the "Performance Guarantee
Bonds to the Owner as stipulated in this Bid documents within ten days (10 days) after
receipt of notice of award of contract.
Bank Guarantee shall also be acceptable for S.D. After allocation of actual work OR
5% of the work amount should be DEDUCTED & deposited as Security deposit from
the first Running bill & shall be returned after completion of the work .
No interest shall be paid by the owner on any Bid guarantee.
IT.8 INCOME TAX CLEARANCE CERTIFICATE
Latest Income Tax clearance Certificates must accompany with the Bid without which
the Bid is liable to be summarily rejected. The income tax clearance certificate obtained from
the income tax officer shall clearly indicate the income tax circle/ward district and the
reference number of the assessment along with the assessment year.
IT. 9 SUBMISSION OF BID DOCUMENTS
Bidders are requested to submit the Bid Documents on following lines.
Volume containing following documents
i. Bid security bond (Earnest Money)
ii. Certificate as registered contractor with Government of Gujarat or appropriate
iii. Bid's financial capability and standing over at least past five years.
iv. Current Income Tax Clearance Certificate.
v. Bidder's experience in the field relevant to this contract.
vi. Bidder's present commitments.
vii. The technical ability and qualifications of the Bidder. Details of technical personnel
with their qualification & experience.
IT .10 BID VALIDITY PERIOD
The validity period of the Bid submitted for this work shall be of hundred & twenty
(120) calendar days from the date of opening of the Bid and that the Bidder shall not be
allowed to withdraw or modify the Bid offer on his own during the validity period. The
Bidder will not be allowed to withdraw the Bid or make any modification or addition in the
terms and conditions on his own Bid .If this is done then the owner shall, without prejudice to
any other right or remedy, by at liberty to reject the Bid and forfeit the earnest money deposit
IT.11 SIGNING OF BID DOCUMENTS
If the Bid is made by an individual, it shall be signed with his full name above his
current address. If the Bid is made by proprietary firm, it shall be signed by the proprietor
above his name and name of his firm with his current address.
If the Bid is made by a firm in partnership, it shall be signed by all the partners of the
firm above their full names and current address, or by a partner holding the power of attorney
for the firm, in which case a certified copy of the power of attorney shall accompany the Bid.
A certified copy of the partnership deed, current address of all partners of the firm shall also
accompany the Bid.
If the Bid is made by limited company or a limited corporation, it shall be submitted
duly signed by an authorized person holding the power of attorney, & shall accompany the
Bid. Such limited company or corporation may be required to furnish satisfactory evidence
of its existence before the contract is awarded.
If the Bid is made by a group of firms, the sponsoring firm shall submit complete
information pertaining to each firm in the group and state along with the bid as to which of
the firms shall have the responsibility for Biding and for completion of the contract
documents and furnish evidence and responsibilities for completion of contract documents.
The full information and satisfactory evidence pertaining to the participation of each member
of the group of firm in the Bid shall be furnished along with the Bid.
All witness and sureties shall be persons of status and probity and their full names,
occupations and address shall be stated below their signature. All signatures in the Bid
document shall be dated.
IT. 12 WITHDRAWAL OF BIDS
If during Bid validity period, the Bidder withdraws his Bid, the Bid security (Earnest
Money Deposit) shall be forfeited.
IT .13 INTERPRETATIONS OF BID DOCUMENTS
Bidder shall carefully examine the Bid Document and fully inform themselves as to
all the conditions and matters which may in any way affect the work or the cost thereof.
Should a Bidder find errors, omissions or discrepancies from the specifications or other
documents or should be in doubt as to their meaning, he should at once address query to the
City Engineer, AMC. The correct interpretation of the same will be placed on AMC website
IT .14 ERRORS AND DISCREPANCIES IN BIDS
IN CASE OF CONFLICT BETWEEN THE FIGURES AND WORDS IN THE RATES THE
RATE EXPRESSED IN WORDS SHALL BE CONSIDERED.
IT. 15 MODIFICATIONS OF DOCUMENTS
Modification of specifications and extension of the closing date of the Bid, if required
will be made by an addendum. These shall be signed and shall form a part of Bid. The Bidder
shall not add to or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
Addendum or corrigendum conveying any change or correction in respect of the
work shall form the part of the contract documents. The full consideration shall be given to
such addendum or corrigendum before submission of Bid duly filled in by the contractor.
Therefore, the contractors shall have to watch such addendum or corrigendum published
by AMC through its website www.ahmedabadcity.gov.in or www.amc.nprocure.com .
Bidders shall verify the number of addendum issued at least 48 hours before Bid
submission date and enclose the same with the Bid documents, failing which the Bids shall
be liable for rejection and no any complaint in respect to this shall be entertained under
any circumstances.
IT .16 TAX AND DUTIES ON MATERIALS
All charge on account of excise duties, terminal tax, sales tax and Govt. duties / tax
etc. on material procured for the works from any source shall be borne by the contractors. No
(P) or "C" or "D" form shall be supplied by AMC for this purpose.
IT .17 EVALUATION OF BIDS
In comparing Bids, the AMC shall consider factors such as the time of completion,
efficiency and reliability of construction method proposed, compliance with the specification,
relative quality, the operation, maintenance and replacement cost of structure and plant and
also the qualifying criteria for the evaluation of Bids.
IT .18 TIME REQUIRED FOR COMPLETION
The completion period / time limit mentioned in this schedule is to be reckoned from
the date of issue of work order to the date by which physical completion of the work take
place. The completion period / time shall be in accordance with the calendar months.
IT .19 POLICY FOR BID UNDER CONSIDERATION
Bid shall be termed to be under consideration from the opening of the Bid until such
time any official announcement or award is made. While Bids are under consideration,
Bidder and their representative or other interested parties are advice to refrain from
contracting by any corporation personnel or representative on matters related to the Bids
under study. The AMC representative if necessary will obtain clarification on Bids by
requesting such information from any or all the Bidder, either in writing or through personal
contacts may be necessary. The Bid will not be permitted to change the substance of his Bid
after Bids have been opened. This includes any post Bid price revision. Non compliance with
his provision shall make the Bid liable for rejection.
IT .20 PRICES AND PAYMENTS
The Bidder must understand clearly that the prices quoted are for the total works or
the part of the total works quoted for inclusive of all costs of materials, labour, equipment,
supervision, other services, and royalties etc. and also inclusive of the Govt. taxes. No claim
for additional payment beyond the prices quoted for will be entertained. The Bidder will not
be entitled subsequently to make any claim on any ground.
As per AMC’s Finance department circular no.38/ Dt.21/11/022 and approval of
competent authority, rate of all the items are taken without GST and prevailing GST will be
IT .21 PAYMENT TERM
The terms of payment are defined in the general terms and condition of contract. The
AMC shall not under any circumstances relax these terms of payment and will not consider
any alternative payment terms. Bidder should therefore in their own interest note this
provision to avoid rejection of their Bids.
Award of the contract or the rejection or Bids will be made within the Bid validity
period stated in the notice inviting Bids.
After all contract contingencies are satisfied and the notice of award is issued, the
successful Bidder shall execute the contract agreement within 10 days and shall furnish the
bond as required herein. The contract agreement shall be executed, in form stipulated by the
If Bidder receiving the notice of award fails or refuses to execute the contract
Agreement within the stated time limit or refuse to furnish the Bond as required herein, the
owner may annual his award and declare the Bid security forfeited and will take action as
A corporation, partnership firm or other consortium acting as the Bidder and receiving
the award shall furnish evidence of its existence and evidence that the officer signing the
contract agreement and bonds for AMC, partnership firm or other consortium acting as the
Bidder is duly authorized to do so.
IT.23 SIGNING OF CONTRACT
The successful Bidder shall be required to execute the contract agreement within
days of receipt of intimation to execute the contract, failing which the AMC will be entitled
to annual the award and forfeit the earnest money deposit. The person to sign the contract
document shall be as per AMC’s policy.
IT.24 DISQUALIFICATION
The Bid shall be disqualified and will not be taken for consideration if
a. The envelope does not show on the outside the reference of bid and thus gets
opened before the due date of opening.
b. The Bid Security Deposit is not deposited in full and in the manner as
specified i.e. Earnest Money Deposit.
c. The Bid is in a language other than English or dose not contains its English
Translation in case of other language adopted for Bid preparation.
d. The Bid documents received are not duly signed by authorized person.
e. The general performance data for qualification is not submitted fully.
f. Bidder dose not agree to payment terms.
The Bid may further be disqualified if,
a. The Completion schedule offered is not consistent with the completion schedule
defined and specified in Bid document.
b. The validity of Bid is less than what is stated in the Bid.
c. Any of the page or pages of Bid is/are removed or replaced.
d. All corrections or posted slips are not initialed by Bidder.
e. Any erasure is made in the Bid.
f. Any condition which affect the cost.
IT.25 SECURITY DEPOSIT
As a contract security the Bidder to whom the award is made shall furnish a security
deposit for the amount of 5% of the contract price to guarantee the faithful performance,
completion and maintenance of the works of the contract in accordance with all condition and
terms specified herein and to the satisfaction of the Engineers-in charge and ensuring the
discharge of all obligations arising from the execution of contract in one of the forms
mentioned below.
a) In cash or demand draft of approved nationalized Bank in favor of the Municipal
Commissioner AMC amount of 5% of the Contract value as per format.
b) In form of B.G. of any nationalized bank amount of 5% of contract value
c) 5% of the work amount should be DEDUCTED & deposited as Security deposit
from the first Running bill & shall be returned after faithful performance, completion
and maintenance of the works of the contract.
IT.26 STAMP DUTY
The successful Bided shall have to enter into an agreement on a non-judicial stamp
paper as per the form of the agreement approved by the AMC. The cost of stamp paper and
adhesive stamp shall be borne by the contractor.
IT .27 BRAND NAMES
Specific reference in the specification to any material by manufacturer's name, or
catalogue shall be constructed as establishing a standard or quality and performance and not
as limiting competition and the Bidder in such cases, may at his option freely use other
products which are equivalent or higher than the quality mentioned in standard specifications.
These products shall be got approved by the Engineer in charge before their use by the
IT. 28 NON TRANSFERABLE
Bid documents are not transferable.
IT .29 COST OF BIDING
The owner will not defray expense incurred by Bidders in Biding.
IT .30 EFFECT OF BID
The Bid for the work shall remain valid for a period of 120 calendar days from the
date of opening of the Bids for this work and that the Bidder shall not be allowed to withdraw
or modify the offer in his own during the period. If any Bidder withdraws or makes any
modifications or additions in the terms and conditions of his own Bid, then the AMC shall
without prejudice to any other right or remedy, be liberty to reject the Bid and forfeit the
earnest money in full.
IT .31 CHANGES IN QUANTITY OR QUALIFYING CRETERIA:
Municipal Commissioner reserves the right to waive any qualifying criteria or
information in any Bid as a special case and to reject any or all Bids without assigning any
reason thereof. He also reserves the right to vary the quantities of items or group of items
and the quantum of work as specified in the schedule of prices as may be necessary in the
interest of public at large for which no any claim shall be entertained.
IT .32 NEW EQUIPMENT AND MATERIAL
All materials, equipment and spare parts thereof shall be new, unused and originally
coming from manufacturer's plant to the AMC. The rebuilt or overhauled equipment
/materials will not be allowed to be used on works
IT.33 RIGHTS RESERVED
The owner reserves the right to reject any or all Bids, to waive any informality or
irregularity in any Bid without assigning any' reason. The owner further reserves the right to
withhold issue of work order even after agreement and no additional payment will be made to
the successful Bidder on account of such withholding. The owner is not obliged to give
reasons for any such action.
Municipal Commissioner reserves right to increase / decrease the scope of work &
also split the Bid in two or more contracts without assigning any reason even after the work is
IT .35 MOBILIZATION ADVANCE
No mobilization advance or advance on machinery will be given.
The contractor shall have to carry out the work in accordance with the detailed
specifications. No condition will be entertained. The conditional Bid will be rejected.
The contractor will have to construct shelter for storing valuable materials like cement
etc. The contractor shall arrange for construct, maintain and afterwards remove and reinstate
any temporary access required for and in connection with the execution at the work at his
own cost. Reinstatement shall include restoring the area of the access route to at least the
degree of safety stability drainage & appearance that existed before the contractor entered the
In the event of any discrepancy the following order or precedence should apply
(a)Dimension & quantity
(3) Specification
on drawing; figures dimension unless previously incorrect will be followed in preference to
select dimension.
(3) Specification
In case of defective description as ambiguities, the Engineer in-charge shall issue
further instruction or clarification or direction as to which manner the work is to be carried
out. The contractor shall comply with such instructions strictly.
Irrelevant mistakes, discrepancies or errors made through over sight by AMC leading
to misunderstandings shall be got corrected properly by the contractor from City Engineer.
Proper procedure shall have to be taken by contractor at all the time during the
progress of the work, failing which the contractors shall be held responsible for all damages
to the work under execution or to any property or to lives of persons during the work in
progress and also during the defect liability period.
All work shall be measured by standard method as per rules & customs of AMC.
The decisions of engineer-in-charge as to what is usual method in use will be final
binding on the contractor.
Bid once accepted shall be binding on the contractor even if the formal agreement is
not signed / executed.
The contractor shall have to give in writing the date of completion of work within a
fortnight from date of work completed by him otherwise the date noted on record by
department shall be reckoned as final & no excuse as representation in that behalf shall be
granted at later date.
Specimen signature of contractor will be cross checked whenever the contractor
receives the payment from the account section of AMC or in case of representative of the
contractor receiving the payment, he shall have to produce the letter of authority from the
contractor who has signed the contract agreement.
The details / contents / information mentioned in the Bid document may be read as
final binding on the contractors. Any difference found in Form B-1 in regards to these
related items may be treated as cancelled
Signature of contractor with seal Addi. City Engineer
Date ( West Zone)
AHMEDABAD MUNICIPAL CORPORATION
GENERAL STANDARD TECHNICAL SPECIFICATIONS
A printed Booklet for GENERAL TECHNICAL SPECIFICATION FOR BUILDING & ROAD
The above may be referred of the printed booklets of PWD which may also be available
from Gujarat Book Stores, Sector-21, Gandhinagar 382
01. The work shall be carried out in accordance with the relevant specifications
contained in PWD Hand Book Vol. I & II with the correction slips from time to
time or the latest addition.
Signature of contractor with seal Addi. City Engineer
Date ( West Zone)
AHMEDABAD MUNICIPAL CORPORATION
MAHANAGAR SEVA SADAN- NORTH WEST ZONE
Name EMPANELMENT OF CONTRACTOR FOR THE WORK OF DRAINAGE PIPE
of LINE UNDER SWARNIM GRANT OF 70:20:10 SCHEME IN DIFF. WARDS OF
work:- WEST ZONE IN AHMEDABAD
Sr. No. Item Description (w/o GST) Per
Excavation for pipe line trenches for water supply, sewerage line,
manhole etc. all with shoring and struting if required as per required
gradient and line including safety provisions using site rails and
1 stacking excavated stuff including up to all required lead cleaning the
site etc. complete for all lifts and strata as specified. In all sorts of soil
and soft murrum.
a 0 to 1.5 meter depth. 79.46 Cu.M
b 1.5 to 3 meter depth. 87.50 Cu.M
Extra rate over item of excavation of earth if excavation is to be done
2 in wet condition without resorting to pumping but incl. of bailing out 17.86 Cmt.
Extra rate over item of excavation of earth for excavation of asphalt
pavement / RCC of thickness up to 0.20 meter including demolishing
3 the asphalt carpet, metal, soiling/cutting Reinforcement etc.comp.
with stacking the material as directed.
a up to 0.20 meter thickness (By Manual) 71.10 Smt
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter
b machine including cost of operator, fuel, & transportation etc complete. 177.76 Smt
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter
c machine including cost of operator, fuel, & transportation etc complete. 311.08 Smt
Filling available excavated earth (excluding rock) in trenches, plinth,
4 sides of foundations etc. in layers not exceeding 20 cm. in depth 22.00 Cu.M
consolidation each deposited layer by ramming and watering.
Conveyance charge of earth, lime, murrum, building rubbish, manure,
garbage, sludge, excavated rock, fly ash, aggregates of any kind
5 executed outside the road site. Rate also includes spreading &
levelling etc complete. Internal conveyance above 50 mt done within
the work site is not payable.
b b) Lead From 1Km to 2 Km. 30.94 Cu.M
c c) Lead From 2 Km to 3 Km. 38.37 Cu.M
d d) Lead From 3 Km to 4 Km. 45.52 Cu.M
e e) Lead From 4 Km to 5 Km. 52.42 Cu.M
Providing and supplying,and jointing ISI mark only standard length
stoneware pipes of following class and diameter including excavation
for laying of pipes, insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental
stores, stacking etc. compl. (IS651/1989 or its latest revision)
6 including labour work for lowering, laying, joiting with cement mortar
(1:1) proportion, proper postion, grade and alignment and all level as
directed by engineer in charge including store to site of work jointing
material etc complete.
a 100 mm dia 165.52 Rmt
b 150 mm dia 242.98 Rmt
c 230 mm dia 400.54 Rmt
Providing & Supplying ISI Standard RCC pipes (of sulphate resisting
cement) in a standard lengths of following class & dia meter suitable
for socket-spigot type including all taxes , insurance, transporation,
freight charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, staking etc complete (IS
7 458:1989) Class NP-3, test pressure 0.7/kg/sqcm. Rate also includes
supplying RCC collar for RCC pipes including taxes, carting, loading,
unloading, etc complete. Including labour work for lowering, laying,
jointing, RCC pipes in CM 1:1 1/2 of following diameters in proper
position, grade and alignent at all as directed by engineer in charge.
(RCC pipe Horizontal cast)
a 300 mm internal diameter 888.37 Rmt
b 450 mm internal diameter 1539.32 Rmt
Constructing Chamber of following size including excavation,
refilling, BBCC (1:5:10) for foundation, C.C.Channel (1:2:4), finished
8 15 mm thick cement plaster inside in CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc.completed.
a 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter 2261.61 No.
b 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter. 2874.11 No.
c 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter. 3905.36 No.
Constructing Slab type M.H. Chamber of the following size including
excavation, refilling, brick bats cement concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (Only for shaft) in CM 1:3, finishing
with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm
9 c/c at 35 cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., including Cantering & reinforcement (double jalli at
15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole
seat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow.
a 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No.
b 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.) 19258.04 No.
Rate reduction over item of Constructing Slab Type M.H. Chamber of
size 1.00 x 1.40 mt for constructing slab @ depth more than 0.60 mt
10 for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above 3.0 mt depth) below 586.61 DM
Ground Level (Max. 5 unit of DM should be reduced in this item)
Making connection to the ex.M.H.in running sewer incl. Dewatering
and other required machinery etc. of following dia pipes at any
11 convenient time. All damaged work shall be well repaired as per
instructions. etc..complete.
a 150 mm to 300 mm dia. 1339.29 No.
b 400 mm to 600 mm dia. 2232.14 No.
Cutting the pipes of following dia coming in the new M.H.in running
sewer including cutting bars, including removing debris /silt from the
12 M.H. and carting at a suitable distance etc..complete as directed. No
payment for M.H. work will be made until pipe is not cut completely in
a 150 mm to 300 mm dia. 1133.93 No.
b 400 mm to 600 mm dia. 1687.50 No.
Repairing damaged M.H. and rasing M.H. up to road level incl.
removing damaged brick work and repairing by brick masonry in C.M.
13 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet
cover, removing the debris from MH and carting the same as
a (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
b (B) up to 0.35mt. (@ Four Coarse) 1155.44 No.
c (C) up to 0.65 mt. (@ Seven Coarse) 1786.49 No.
d (D) up to 0.90 mt. (@ Ten Coarse ) 2150.90 No.
Repairing damaged I.C./ Raising removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
14 fixing C.I. steps and existing chamber sheet cover, removing the 399.96 No.
debris from chamber and carting the same as directed.
Providing F.R.C. MH seat cover incl. carting to the work site etc.
15 comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover :
728mm ø & 100 mm thick circular cover, 35.00 MT load design, 100x2mm
MS flat allround, 16mm ø plain round bar for lifting the cover & should be
fitted with plastic cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS
flat should be well embed in concrete to protect the edges of frame. FRC
E.H.D.-35 manhole cover & frame described as above.
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clear
b opening, The dimension of frame and cover as per mentioned in Amend 1720.44 No.
No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear
c opening, The dimension of frame and cover as per mentioned in Amend 1255.52 No.
No.1 to IS 12592 : 2002 table 1..
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm
d clear opening, The dimension of frame and cover as per mentioned in 2254.98 No.
Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-560mm ø clear
e opening, The dimension of frame and cover as per mentioned in Amend 1915.14 No.
No.1 to IS 12592 : 2002 table
Providing Kachha of Pakka Dummy in the following dia pipes and
16 removing the same after completion of the connection work as
a (A) 100 mm to 300 mm dia. 199.11 No.
b (B) 350 mm to 600 mm dia 302.68 No.
Supplying, labour for break down repairing work for activities like
17 excavation, disliting, removing debris from trench back filling etc.
comp. as directed by Eng.in charge.
a Mazdoor at day /Night 363.30 No
b Fitter at day / Night 380.30 No
b Makadam/ supervision at day / Night 379.46 No
Barricading the entire break down or excavated area on rental basis
using wooden ballies / M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to avoid accident & for
smooth traffic diversion & movement including cautionary board etc.
18 Item also includes for making temporary sufficient nos of lighting 79.99 Rmt.
arrangement through out the work with necessary required
arrangement. The same shall be removed after completion of work.
(Only for break down work from start to complete)
Fabricating, supply and erecting in position Standard Structural steel
sections conforming to IS 2062 for railing , skywalk, stair, or other
works using ISMB, ISA, ISMC, MS plate, flat, square bars, pipe, square
pipe, rectangular sections, square section, tube, etc. including
welding, cutting, wastage, etc. complete. The rate is inclusive of
welding rod, supply & fixing of correct size nut, bolts, washers,
including one primer coat of red lead paint conforming IS:102 Zinc
chromate paint conforming to IS:104 followed by two coat of
aluminium paint as per IS:2339 OR enamel paint of color as selected
by engineer incharge, with all contractor's materials, labour, tools &
plants, in bolted/welded construction as directed by Engineer-in
Charge. The waste cut pieces shall not be included in the paying
quantity. The work shall be done as per drawing and specification.
The work shall be carried out as per IS:800, IS:816.
Providing TMT Bar FE415 reinforcement for R.C.C. work including
20 bending, binding and placing in position complete upto floor two level 63.10 Kg
Brick work using common burnt clay building bricks having crushing
strength not less than 35kg./Sq.Cm. In foundation and plinth in
21 Cement Mortar 1:5.(1-Cement: 5 -fine sand)(B) Conventional.(R & B Cmt
Building Road Bridge SOR 2023-24 Item Code 06001BA,Item No.as
per NBO - 6.12 page no.64 Dist. AHMEDABAD SOR 2023-24
Providing 15 mm thick cement plaster in single coat on Rough
(Similar) side of single or half brickwalls for interior plastering upto
22 floor two level and finished even and smooth in (i) Cement mortar 1:3 Smt
(1-cement:3-sand). (R & B Building Road Bridge SOR 2023-24 Item
Code 17026, AHMEDABAD SOR 2023-24
23 Reinstatement of Asphalt road using the same material. 103.57 Smt
Providing and Casting in situ ordinary cement concrete M200 for
R.C.C. Raft and cutt off walls including necessary shuttering laying,
24 vibrating, ramming and curing complete.(B) Walls, fom top of 3672.30 Cu.M.
foundation level upto floor two level.
Providing, laying and jointing in true line and level U.P.V.C pipe (SCH
- 40) of following dia. including fittings of standard make as approved
by Engineer - in - charge. Pipe shall be fixed on the wall with the help
of clamp at every shall be concealed as directed including necessary
Tee ,bend, any joint & any fittings etc. including testing of pipe and
joints and fixing the same with adhesive solvent, including cost of all
materials (Building SOR 23-24 )
A 15 mm (I.code no. 23061) 71.93 RMT
B 25 mm (I.code no. 23062) 90.93 RMT
C 32 mm (I.code no.23063) 117.93 RMT
D 40 mm (I.code no. 23064) 146.65 RMT
E 50 mm (I.code no. 23065) 193.73 RMT
F 110mm (I.code no. 23067) 826.88 RMT
G 160 mm (I.code no. 23066) 822.99 RMT
Providing, supplying & fixing to wall ceiling and floor 6.0 kg. F/Cm2
working pressure polythelene pipes of the following outside dia. Low
26 density. Complete with special flange empression type fittings. Wall
clips etc. incl. making good the wall ceilling and floor.
90 mm 140.18 Rmt
Providing and operation dewatering Pump including fuel charges &
operator Charges etc. as directed etc. comp. (Shift for Eight Hour)
27 (For Each Pump Set, No payment should be allowed for non working 600.00 Shift
condition of machinery)
Hiring and operating Mud Pumps incl. Cost of fuel and operator
including the cost of to and fro transportation, laying of the delivery
28 hoses as required, lowering and lifting the pumps as and when 16.00 H.P/Hr
required etc. complete. Set Do As Directed. (No payment should be
allowed for non working condition of machinery)
Hiring and operating the 20 KV 3 Phase Electric Generator for
operating desilting machinery, and lighting and other requirements
29 with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. 2800.00 Shift
(No payment should be allowed for non working condition of
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg. in charge, rate
includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for
pipe line excavation and laying work)
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt
Demolishing Work on site by using Operator, fuel, power Supply etc.
31 Complete as Directed. (No payment should be allowed for non 600.00 HR.
working condition of machinery and for pipe line excavation and M.H.
work. Allowed only for break down work)
Note: Contractor Should quote unit rate mentioned as above. The payment will be made on
actual item wise execution as per the abstract attached here with and the same % rate
will be applicable for individual items as mention in abstract.
Signature of contractor with seal Addi. City Engineer
Date ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 67.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].