Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 2ND FLOOR 08 VS COMPLEX VANNARPET MAIN ROAD VIVEK NAGAR POST NANJAPPA GARDEN BANGALORE KARNATAKA 560047 | BENGALURU URBAN | KARNATAKA | 560047 | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical As technically not qualified |
Tender Value
₹15.7 L
EMD Value
₹37,000
Closing Date
20 Mar 2020, 3:00 pmClosed
EE C NMPT
NMPT Panambur
Conservancy of roads, drains and public places in the Staff colony for the year 2020-21 and 2021-22 - Part C East Wing
2020_NMPT_549937_1
CIVIL/Dy.CE-C/EE-C/55/2019-20
Open Tender
Civil Works
Item Rate
730 days
NMPT Panambur
As per tender Document
6 documents required · 6 mandatory
₹560
Yes
FA and CAO NMPT
₹37,000
Yes
7 Jul 2020
5 Mar 2020
21 Mar 2020
6 Mar 2020
20 Mar 2020
13 Mar 2020
Amount
BOQ Particulars
Conservancy and cleaning of the public utility place like ABC market along with drains and open area by removing all accumulated sand, dust, waste materials, grass,vegetation growth, roots of dead trees, all other solid waste materials etc. including disposing off the same with a lead of 2.00 km and maintaining the areas in neat & tidy condition throughout the year including cost & conveyance of all materials, tools and plants, labour, all other incidental charges etc complete as directed by the department. (Daily Operation, by deploying minimum 1 (one) Labour per day)
Conservancy and cleaning of main road along with its drains and berms in the staff colony, areas other than taht shown under item No 3 below by removing all accumulated sand, dust, waste materials, grass,vegetation growth, roots of dead trees, all other solid waste materials etc. including disposing off the same with a lead of 2.00 km and maintaining the areas in neat & tidy condition throughout the year including cost & conveyance of all materials, tools and plants, labour, all other incidental charges etc complete as directed by the department.(Operation twice in one week by deploying minimum 1(one) labour per day )
Conservancy and cleaning of all other streets and avenues, including drains and berms in the staff colony, areas other than that shown at item no 2 above by removing all accumulated sand, dust, waste materials, grass,vegetation growth, roots of dead trees, all other solid waste materials etc. including disposing off the same with a lead of 2.00 km and maintaining the areas in neat & tidy condition throughout the year including cost & conveyance of all materials, tools and plants, labour, all other incidental charges etc complete as directed by the department.(Operation Once in a week, by deploying minimum 3 Labour per day )
Digging deep pit, conveying and burring carcass of domestic animals and refilling these pits etc complete as soon as such incident occurs with a lead of 1.00km including cost of labour, tools and plants and all other incidental charges etc complete as directed by the department.
Cutting of branches of trees of large/small sizes,Size Upto 30cms girth which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
Cutting of branches of trees of large/small sizes, Size 30cms to 60 girth which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
Cutting of branches of trees of large/small sizes,Size 60cms to 90cms girth which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
Cutting of branches of trees of large/small sizes, Above 90cms girth which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
Cutting of trees of large/small sizes, Size Upto 30cms girth which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
KSRRB 200-1 Cutting of trees girth from 300mm to 600mm including cutting of trunks, branches and removal of stumps stacking of serviceable materials, earth filling in the depressions/pit, labour charges complete as per specifications. Specification No. KRBS 200-1 MOST Specification No. 201
Cutting of Coconut trees of large/small sizes which is damaging the nearby building/structures, very carefully with damaging the building/structures compound wall, fencing electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department
Earth work in surface excavation in ordinary soil for leveling and lowering the ground by JCB/ Manually other than foundation of buildings, culvers, roads & drains and trenches of pipe lines and cables and removing the excavated stuff to a distance not exceeding 50m and lift upto 1.5m excavated surface leveled and neatly dressed, disposed earth to be leveled after breaking of clods and neatly dressed as per specification.
Cleaning the toilets two times a day at ABC market in neat and tidy condition including cost & conveyance of all other materials T&P labour charges incidentals etc complete as directed by the dept.(Toilet Cleaning Chemicals will be supplied by the Dept free of Cost) (Daily Operation by the labour deployed for conservancy of Public Buildings
Taking away the branches of trees upto 30 Cms grith from item No. 05 by the contractor
Taking away the branches of trees, Size Upto 30cms to 60 girth from item No. 06 by the contractor
Taking away the branches of trees, Size 60cms to 90cms girth from item No. 07 by the contractor
Taking away the branches of trees, Above 90cms girth from item No. 08 by the contractor
Taking away the trees, Size Upto 30cms girth from item No. 09 by the contractor
Taking away the trees, Size 30cms to 60 girth from item No. 10 by the contractor
Taking away the Coconut trees from item No. 11 by the contractor
Sathish Kumar
P.S Sasidharan
VRS Manpower And Security service Pvt Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .