| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L Quoted ₹4.8 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.9 L+₹8,685 (1.80%)Rejected-AOC M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹4.9 L+₹8,685 (1.80%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.9 L+₹12,015 (2.50%)Rejected-AOC ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹4.9 L+₹12,015 (2.50%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Yash Pal L2 | Sushil L1 | Rajesh Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00Providing and laying cement concrete work 1:1.5:3 (1cement :1.5 sand: 3 graded crushed stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement in foundation and plinth with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. in: - | ||||||
| 1.01 | Walls ( any thickness but not less than 0.1 m thickness )attachement pillasters,buttresses,plinth and string courses etc. from top of foundation level upto floor to level with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. | 5.4 | Cum | 15,200 ₹82,080 | 15,000 ₹81,000 Lowest | 15,500 ₹83,700 |
| 2.00Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : - | ||||||
| 2.01 | Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. | 72 | sqm | 510 ₹36,720 | 500 ₹36,000 Lowest | 500 ₹36,000 Lowest |
| 3.00 | Providing and laying in position cement concrete 1:3:6(1 Cement :3 Sand : 6 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including complete in all respects as per directions of Engineer-in-charge. | 13.5 | Cum | 9,150 ₹1,23,525 | 9,000 ₹1,21,500 Lowest | 9,210 ₹1,24,335 |
| 4.00 | 20 MM CEMENT PLASTER OF CEMENT MORTAR 1:4 (1 CEMENT: 4 FINE SAND) COMPLETE IN ALL RESPECT WITHIN ALL LEADS & LIFTS AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE. | 540 | Sqm | 459 ₹2,47,860 | 450 ₹2,43,000 Lowest | 462 ₹2,49,480 |
Tender Value
₹2.9 L
EMD Value
₹5,861
Closing Date
13 Jul 2026, 5:00 pmClosed
Executive Engineer Jal Shakti Division Larji
Executive Engineer Jal Shakti Division Larji
(SH- CC flooring 1, 3,6 ,Plastering of existing channel and raised of Existing channel)
2026_HPIPH_138124_10
EE Larji NIT NO- 3647-3746 dated 04.07.2026
Open Tender
Civil Works
Item Rate
60 days
Bajaura
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹5,861
31 Aug 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying cement concrete work 1:1.5:3 (1cement :1.5 sand: 3 graded crushed stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement in foundation and plinth with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. in: - | |||||
| 1.01 | Walls ( any thickness but not less than 0.1 m thickness )attachement pillasters,buttresses,plinth and string courses etc. from top of foundation level upto floor to level with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. | 5.4 | Cum | - | - |
| 2Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : - | |||||
| 2.01 | Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses with in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge. | 72 | sqm | - | - |
| 3 | Providing and laying in position cement concrete 1:3:6(1 Cement :3 Sand : 6 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including complete in all respects as per directions of Engineer-in-charge. | 13.5 | Cum | - | - |
| 4 | 20 MM CEMENT PLASTER OF CEMENT MORTAR 1:4 (1 CEMENT: 4 FINE SAND) COMPLETE IN ALL RESPECT WITHIN ALL LEADS & LIFTS AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE. | 540 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Form8.pdf
Tender Documents • 1.44 MB
Form6.pdf
Tender Documents • 0.65 MB
Terms.pdf
Tender Documents • 0.16 MB
BOQ_204602.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .