Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹7.9 L | 1 | Accepted-Finance L1 |
| 2 | 2₹8.0 LRejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹8.0 L | 2 | Rejected-Finance L2 |
| 3 | 3₹8.0 LRejected-Finance | ₹8.0 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | vishal thakur govt contractor L3 | Manoj Kumar L2 | Pawan Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Chamlog whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 7,99,999 ₹8.0 L | 7,98,000 ₹8.0 L | 7,94,500 ₹7.9 L |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 2 Nos pump house, Main storage tank 1Nos, Rising main: Phase 1st: 50mm dia=2120 Rmt, 2nd phase: 65mm dia=1480Rmt Distribution system: 37Km Pumping machinery: Booster stage: 2x3=6 HP, 1st phase: 2x40=80 HP 2nd phase 2x15=30HP. No of storage tanks: 1 Nos, Total working hours 27 per day : through , 5 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 250000 ). Pumping hours per day ( 15 ) and energy consumptoin per day Unit. | ||||||
Tender Value
₹6.8 L
EMD Value
₹13,500
Closing Date
23 Jan 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Chamlog in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system of main storage tank under JSV Section Panjgain for one year).
2026_HPIPH_125645_1
BLP-BLP-0736-NIT No. 11481-11580 Dated 12/01/2026
Open Tender
Civil Works
365 days
Sub Division Bilaspur Section Panjgain
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
EE JSV Bilaspur
₹13,500
5 Feb 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Chamlog whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 2 Nos pump house, Main storage tank 1Nos, Rising main: Phase 1st: 50mm dia=2120 Rmt, 2nd phase: 65mm dia=1480Rmt Distribution system: 37Km Pumping machinery: Booster stage: 2x3=6 HP, 1st phase: 2x40=80 HP 2nd phase 2x15=30HP. No of storage tanks: 1 Nos, Total working hours 27 per day : through , 5 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 250000 ). Pumping hours per day ( 15 ) and energy consumptoin per day Unit.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
Termsandconditions.pdf
Tender Documents • 0.35 MB
BOQ_185178.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid