Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20,956Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹23,824.50+₹2,868.50 (13.7%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹23,874.40+₹2,918.40 (13.9%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Linto Varghese L1 | LORANCE A J L3 | CHRISTIN BAIJU C L L2 |
|---|---|---|---|---|---|---|
| 1.00Trees & Branches | ||||||
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 8 | each | 587 ₹4,696 Lowest | 743.44 ₹5,947.52 | 741.89 ₹5,935.12 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 2 | each | 2,450 ₹4,900 Lowest | 2,699.26 ₹5,398.52 | 2,693.62 ₹5,387.24 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 11,360 ₹11,360 Lowest | 12,528.36 ₹12,528.36 | 12,502.16 ₹12,502.16 |
Tender Value
₹21,708
Closing Date
23 Aug 2025, 5:00 pmClosed
Assistant Executive Engineer
o/o Assistant Executive Engineer,Irriga Subdiv2
Treecutting
2025_Irrig_781971_2
IRR/PII/TR/5374/2025-5-1-1/1
Open Tender
Civil Works - Canal
Item Rate
90 days
manjapra
Please refer Tender documents.
9 documents required · 9 mandatory
₹335
Yes
Yes
4 Oct 2025
14 Aug 2025
25 Aug 2025
14 Aug 2025
23 Aug 2025
14 Aug 2025
14 Aug 2025 - 23 Aug 2025
Amount
Trees & Branches
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
CHRISTIN BAIJU C L (BID ID -2303745)
LORANCE A J (BID ID -2303797)
Bidder Name
LORANCE A J
Linto Varghese
CHRISTIN BAIJU C L
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1293495.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .