| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.0 CrAccepted-AOC PROJECT 34 VRINDAVAN LAYOUT VIDYANAGAR HUBLI 5880021 | HUBLI | DHARWAD | KARNATAKA | 5880021 | L1 | Accepted-AOC WORK AWARDED | |
| 2 | L2₹99.4 Cr+₹3.7 Cr (3.88%)Rejected-Finance 112 KALIAMMAN KOIL STREET NATESAN NAGAR VIRUGAMBAKKAM CHENNAI 600092 | CHENNAI | TAMIL NADU | 600092 | L2 | Rejected-Finance L2 | |
| 3 | L3₹101.1 Cr+₹5.4 Cr (5.66%)Rejected-Finance 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical B 31 32 2ND FLOOR INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 RAJASTHAN | JODHPUR | RAJASTHAN | 342003 | - | Rejected-Technical reject |
Tender Value
₹87.1 Cr
EMD Value
₹97.1 L
Closing Date
4 Mar 2024, 3:00 pmClosed
EE XII WRD Gogal
Executive Engineer,WD XII WRD Gogal Margao Goa
Construction of Barrage and 30MLD Raw water pumping station at Mirabag, Sanvordem/Curchorem, across Zuari River For Augmentation of Minor Irrigation Tank at Panchawadi for un-interrupted Raw Water to Drinking Water Treatment Plant at Panchawadi in VP
2024_WRD_14312_1
WRD/WDXII/TECH/F10/25e/2023-24
Open Tender
Civil Works
Item Rate
480 days
Mirabag Panchwadi Shiroda
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
₹97.1 L
SE Circle I WRD Porvorim Goa
27 Oct 2025
16 Feb 2024
5 Mar 2024
16 Feb 2024
4 Mar 2024
28 Feb 2024
28 Feb 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUB ESTIMATE I: Construction of Barrage at Mirabag , Sanvordem/ Curchorem Earthwork in excavation by mechanical means in all types of strata comprising any of the material such as soil, silt, sand, clay gravel, mooram of all varieties, shingles, pebbles, all types of coglomerates, all types of laterite rocks, soft rock, ordinary rock, disintegrated rock, fissured / shuttered rock, decomposed or weathered rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted including chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc. including pumping or bailing out water/dewatering incl. setting out constructed of shoring and bracing, removal of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas for all leads and lifts etc. as per specification & drawing and directed by the Engineer-in-Charge etc. complete. | 20,178 | Cum | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 541 | Cum | - | - |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:(a) All works upto plinth level | 1,376 | Cum | - | - |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formwork for :(i) Foundations, Footings, Bases for columns (i) Foundations, Footings, Bases for columns | 4,114 | Sqm | - | - |
| 4.1 | (ii)Vertical surfaces such as retaing walls, returnwalls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 4,491 | Sqm | - | - |
| 4.2 | (iii) Columns, Pillars ,piers, abutments, posts and strut (square, rectangular, polygon in plan.) | 2,203 | Sqm | - | - |
| 4.3 | xiii)Suspended floors, roofs landings, shelves & their supports | 163 | Sq.m | - | - |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for sloping or battering surface (slabs, beams, louvers, etc) including folded plates. (iii) Columns, Pillars, Posts & struts (circular or curved in plan) | 503 | Sqmt | - | - |
| 6 | Centering and shuttering including struttings, propping etc. and removal of formwork for Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth, Suspended floors, roofs landings, shelves & their supports. Extra to be added for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de- shuttering and de-centering at all levels, over a height of 3.5m, for every additional height of 1m or part thereof. (Plan area to be measured) Suspended floors, roofs, landings, beams and balconies (plan area to be measured) | 984 | Sqm | - | - |
| 7 | Providing and laying in position machine batched concrete (BMC), machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete work including pumping of concrete to the site of laying but excluding the cost of centering , shuttering, finishing and reinforcement including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workability without impairing the strength and durability as per the direction of the Engineer-in-charge. M35 grade of reinforced cement concrete for All works up to floor V level. | 283 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_14586.xls
BOQ • 0.29 MB
139685177.pdf
Tender Documents • 0.74 MB
139685178.pdf
Tender Documents • 0.53 MB
139685180.html
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .