| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹2.7 Cr+₹26.6 L (11.1%)Rejected-AOC METHRAYIL HOUSE THATHAMPALLY ALAPPUZHA PIN 688013 | ALAPPUZHA | ALAPPUZHA | KERALA | 688013 | ₹2.7 Cr+₹26.6 L (11.1%) | L2 | Rejected-AOC L2 BIDDER |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
23 Dec 2024, 6:00 pmClosed
SUPERINTENDING ENGINEER
KD CIRCLE CHENGANNUR
GENERAL Budget Speech works 2023 24 Flood mitigation work in Thekke Mecherivaka Padasekharam of Pulincunnu Panchayat General Civil Work
2024_Irrig_712602_1
IRR/KP/TR/8257/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
Pulincunnu
Please refer Tender documents.
12 documents required · 12 mandatory
₹9,759
Yes
₹1 L
Yes
19 Feb 2025
4 Dec 2024
27 Dec 2024
4 Dec 2024
23 Dec 2024
4 Dec 2024
4 Dec 2024 - 23 Dec 2024
Amount
APPENDIX I - Retaining wall for outer bund
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD317/2024-2025:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site (Sl. No. 1.4 page 76- Details vide MINUTES OF MEETING HELD BY THE INTER DEPARTMENTAL COMMITTEE constituted vide G.O.(RT.) No. 6544/2021 FIN dated 06/10/2021 FOR STANDARDISATION OF OBSERVED DATA REGULARLY USED FOR PUBLIC WORKS ON 30/03/2023)
OD318/2024-2025:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site ( Sl. No. 1.2 page 74- Details vide MINUTES OF MEETING HELD BY THE INTER DEPARTMENTAL COMMITTEE constituted vide G.O.(RT.) No. 6544/2021 FIN dated 06/10/2021 FOR STANDARDISATION OF OBSERVED DATA REGULARLY USED FOR PUBLIC WORKS ON 30/03/2023)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD37267/2023-2024:Purchasing and supplying a Laptop - High end type of following specification from CENTRALIZED PROCUREMENT AND RATE CONTRACT SYSTEM (CPRCS) https://cprcs.kerala.gov.in Processor: Intel Core i5 1135 G7 @ 4.20 Ghz, 4 Core, 8 MB Cache TDP-Down 12W Memory: 16 GB DDR4 RAM Expandable up to at least 32GB Hard Disk: 256 GB SSD Display: Antiglare Full HD LED Backlit Display Display Size: 14&ampampampampamprdquo Wireless connectivity: Integrated wireless b/g/n, Integrated Bluetooth Speaker: Integrated Stereo Speaker Keyboard: Keyboard with Touch Pad Camera: Integrated HD Camera Audio: Integrated Expansion Port: 3 USB Port (at least two number of USB 3.0 and One number of Type C) ,10/100/1000 Ethernet Card, HDMI, 1Head phone/microphon e combo or Separate &ampampampampampamp other Standard features Power Supply : 230V, 50Hz AC Supply with rechargeable Battery Pack comprising of Li-Polymer battery/ Li- Ion Polymer battery Mouse: Optical Scroll mouse Carry case: Backpack Weight: Less than or equal to 1.7Kg (Weight without Charger) Warranty: 3 year comprehensive onsite warranty including battery and charger Certification: ROHS Compliance &ampampampampampamp BIS for Product Operating System: Windows 11 Professional
OD10235/2024-2025:Supplying and stacking well matured 1/2 split and straight 6 m long coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etc complete.
OD10240/2024-2025:Driving down half split coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accesibility to hydraulic excavator through land and water bodies having minimum width greater than 10 Metre
Appendix II: Construction of Motorthara I
OD37518/2023-2024:Putting up ring bund of top width 1.50m, bottom width 2.75m. and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of wailing pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Separation membrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and wailing pieces using reaper and nails in full height including tying properly using iron wire and coir altogether, supply and filling inside with hard clay/cut earth up to 2.50m, level and conveyed with all leads and lifts including consolidating properly and maintaining the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. ( Sl. No. 5.3 page 86- Details vide Order no. W7/194/11/K.P (a) dated 9.10.2022 of CE, Kuttanad Package and Inland Navigation)
OD18876/2024-2025:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD32802/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.
OD38048/2023-2024:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accessibility to hydraulic excavator through land, but through water bodies having minimum width greater than 10metre
2.27:Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
OD32806/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
OD15156/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. ( Sl. No.1.2 page 74- Details vide MINUTES OF MEETING HELD BY THE INTER DEPARTMENTAL COMMITTEE constituted vide G.O.(RT.) No. 6544/2021 FIN dated 06/10/2021 FOR STANDARDISATION OF OBSERVED DATA REGULARLY USED FOR PUBLIC WORKS ON 30/03/2023)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD19488/2024-2025:Filling with Quarry muck Filling up low lying and water logged area with quarry muck, spreading in layers , levelling the top at site and consolidation by ramming , etc complete for improving the CBR value of subgrade.
Appendix III- Construction of Pothumada
OD320/2024-2025:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete(sl.no 22.2 page 93-Details vide MINUTES OF MEETING HELD BY THE INTER DEPARTMENTAL COMMITTEE constituted vide G.O.(RT.) No. 6544/2021 FIN dated 06/10/2021 FOR STANDARDISATION OF OBSERVED DATA REGULARLY USED FOR PUBLIC WORKS ON 30/03/2023))
OD18904/2024-2025:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD35629/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete (Sl. No. 3.1 page 78- Details vide Order no. W7/194/11/K.P (a) dated 9.10.2022 of CE, Kuttanad Package and Inland Navigation)
OD38141/2023-2024:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no access to hydraulic excavator through land and waterbodies having minimum width grater than 10m (vide order no. W7-194/11/K.P(a) dated 19.10.2022 of Chief Engineer, Inland Navigation & Kuttanad Package, Alappuzha)
2.27:Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
OD37999/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD19464/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. ( Sl. No.1.2 page 74- Details vide MINUTES OF MEETING HELD BY THE INTER DEPARTMENTAL COMMITTEE constituted vide G.O.(RT.) No. 6544/2021 FIN dated 06/10/2021 FOR STANDARDISATION OF OBSERVED DATA REGULARLY USED FOR PUBLIC WORKS ON 30/03/2023)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Appendix IV: Clay bund
OD322/2024-2025:Earthwork in rough excavation in or under water banking excavate clay in layers not exceeding 20cm in depth, breaking clods and dressing up in embankment for roads, flood banks, marginal banks and guide banks with all kinds of soil (CPWD 2.2.1- 2.4- 2.5 +2.24.1) under excavation in stiff heavy kayal clay. Certificate:- Certified that the observed data is prepared by taking the rates and labour charges as per current schedule of rate and has been prepared as per the actual observation at the site. all kinds of soil
ASHOKAN PARTHAN (BID ID -2032128)
Bidder Name
ASHOKAN PARTHAN
JOSEPH CHACKO
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1121427.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .