Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.4 L
EMD Value
₹5,414
Closing Date
31 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ankit Rai
Lube Blending Plant Budge Budge
Installation, Testing and commissioning of Sacrificial Anode cathodic Protection (SACP) system and repainting of over ground product pipeline in jetty area at LBP Budge Budge
2022_ERO_146195_2
LBPBGB/ENGG/LT-01/2021-22
Limited
Mechanical Works
Works
56 days
Lube Blending Plant Budge Budge
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,414
Yes
2 Feb 2022
24 Jan 2022
2 Feb 2022
24 Jan 2022
31 Jan 2022
24 Jan 2022
180 days
Indian Oil Corporation eProcurement portal Created By: ANKIT RAI Created Date/Time: 02-Feb-2022 11:46 AM Tender Title: Installation, Testing and commissioning of SACP system in Product pipeline at LBP BGB Tender ID: 2022_ERO_146195_2
Tender Inviting Authority: Indian Oil Corporation Limited (MD)
Name of Work: Design, Supply of materials, Installation, Testing and commissioning of Sacrificial Anode cathodic Protection (SACP) system and repainting of over ground product pipeline in jetty area at LBP Budge Budge
Tender Ref. No: Important Notes: 1. Party should quote by selecting EXCESS or LESS in the dropdown box and thereafter filling the percentage rate in figures only without any condition. In case party is intending to quote “at Par”, party must quote “0” in the space provided. Leaving the designated space for quoting percentage rate blank shall be taken as quoted “at par”. The party in their own interest should tally the quoted rate in words and quoted amount (in figures) which is displayed at the bottom of price bid sheet and calculated as per % rate quoted by the party. Name of bidder must also be provided at appropriate place in price bid.Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format. 2. Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format 3.GST (As applicable, (Currently @ 18.0 %)) will be paid extra as per Govt. rule.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/S GOODWILL CONSTRUCTION(GSTN-19AAGFG4792H1Z0) 458781.800 19.560 548519.520 Five Lakh Fourty Eight Thousand Five Hundred and Ninteen
2.00 Steeltech system(GSTN-NA) 458781.800 94.600 892789.380 Eight Lakh Ninty Two Thousand Seven Hundred and Eighty Nine
Lowest Amount Quoted BY: M/S GOODWILL CONSTRUCTION(548519.520)
BOQ Summary Details Tender Title: Installation, Testing and commissioning of SACP system in Product pipeline at LBP BGB Tender ID: 2022_ERO_146195_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/S GOODWILL CONSTRUCTION 548519.520 L1
2 Steeltech system 892789.380 L2
stage.html
html • 0.02 MB
finance_156787.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .