Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 79 TILLA KUNJABAN AGARTALA WARD NO 3 AMC WEST TRIPURA PIN 799006 | AGARTALA | WEST TRIPURA | TRIPURA | 799006 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance VILL RANGAMATI PO KHEDABARI SONAMURA SEPAHIJALA DISTRICT | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance NILL | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance S O LT DHIRENDRA CH DAS VILL P O RANGKANG P S BIRGHANJ AMARPUR GOMATI TRIPURA | GOMATI | TRIPURA | 799013 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance RANIRBAZAR AGARTALA TRIPURA W PIN 799035 | WEST TRIPURA | TRIPURA | 799035 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹90 L
EMD Value
₹1.8 L
Closing Date
9 Mar 2026, 3:00 pmClosed
EE, Samagra
Old Shishu Bihar Complex
Construction of BRC Hall at Amtali HS School under Dukli Block of West Tripura during 2025-26 Samagra Shiksha under Elementary Level
2026_OSDDS_70630_1
267/EE/ENGGCELL/SAMAGRA/25-26
Open Tender
Civil Works
Percentage
365 days
West Tripura
Please refer tender documents
2 documents required · 2 mandatory
₹4,000
₹1.8 L
16 Mar 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | - | Cum | 179.9 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 0.2 | Cum | 161.3 | ₹32.1 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone
aggregate 20 mm nominal size) | - | Cum | 10,570.6 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement
-All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 0.76 | Cum | 12,073.8 | ₹9,176.09 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,305.8 | - |
| 7 | Cement concrete flooring 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate | 0.2 | Sqm | 631 | ₹125.57 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size). | 0.8 | Cum | 13,584.5 | ₹10,866.24 |
| 9 | Centering shuttering including struttings, propping etc.and removal of form work for:
a) Foundations, footings, bases for columns etc. for mass concrete with timber plank. of glass strips etc. complete. | - | Sqm | 333.9 | - |
| 10 | Centering shuttering including struttings, propping etc.and removal of form work for: b) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 1 | Sqm | 625.5 | ₹624.87 |
stage.html
html • 0.04 MB
finance_71877.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.36 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
DNIeT.pdf
Tender Documents • 20.63 MB
BOQ_71877.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .